Aishbagh Junction railway station
Aishbagh Junction Railway Station | |
---|---|
Location | Aishbagh, Lucknow, Uttar Pradesh, India |
Coordinates | 26°49′55″N 80°55′08″E / 26.832°N 80.919°ECoordinates: 26°49′55″N 80°55′08″E / 26.832°N 80.919°E |
Elevation | 123.500 metres (405.18 ft) |
Owned by | Indian Railways |
Line(s) |
Aishbagh- lucknow junction line Aishbagh-manak nagar- kanpur line Aishbagh-Sitapur cantt line aishbagh-shahjahanpur-delhi line Aishbagh-hardoi line Aishbagh-Gonda-Balrampur Aishbagh-barabanki-Faizabad line Lucknow-gonda main line |
Platforms | 5 (2 under construction) |
Tracks | 2 (8 under construction) |
Connections | Taxi Stand, Auto Stand |
Construction | |
Structure type | Standard on-ground station |
Parking | Available |
Bicycle facilities | Available |
Disabled access | Lucknow NER |
Other information | |
Station code | ASH |
Fare zone | North Eastern Railway, Lucknow NER railway division |
History | |
Electrified | Yes |
Previous names | Izzatnagar Railway / East Indian Railway Company |
Traffic | |
Passengers | 15,000 |
Aishbagh Junction is the third largest railway station of Lucknow, India. It is located in the North Eastern Railway zone.
Until May 2016 this station used to serve the 130 years old metre gauge railway network, and used to act as a terminal for it. On 15 May 2016 the gauge conversion process started[1] in which the Aishbagh – Sitapur section is being upgraded to broad gauge.
Before the gauge conversion Aishbagh Junction had five platforms. Their number will be increased to seven after completion of the gauge conversion. After GC process this station will be originating/terminating point for many north, northwest and northeast bound trains. Many Delhi and Izzat nagar bound trains will start from here. Station will also be provided with a loop line to bypass the trains which are not having a stop here. Other than this Transport nagar, Gomti nagar, Utrahtia Jn and Daliganj Jn will be developed as satellite stations to pick the traffic pressure off charbagh, Lucknow junction and Badshah nagar railway stations. Right now Charbagh, Lucknow junction, Daliganj junction Gomti nagar railway stations are originating/terminating railway stations in lucknow.[2]
Meter Gauge Trains From Aishbagh
before gauge coversion, a total of 22 trains originated and terminated at Aishbagh Junction. Although all meter gauge trains are now cancelled since gauge conversion . It is planned to run all these trains again as broad gauge trains.
Train No. | Train Name | Arrival | Destination |
---|---|---|---|
52238 | Aishbagh – Pilibhit Passenger | Starting Station | Pilibhit |
52250 | Aishbagh – Sitapur Passenger | Starting Station | Sitapur junction |
15310 | Ruhelkhand Express | Starting Station | pilibhit junction |
52242 | Aishbagh – Mailani Passenger | starting station | Mailani junction |
15313 | Aishbagh – tanakpur Express | starting station | tanakpur |
52244 | Aishbagh – Bareilly Passenger | starting station | Bareilly |
52252 | Aishbagh – Sitapur Passenger | starting station | Sitapur junction |
52240 | Aishbagh – Tikunia Passenger | starting station | Tikunia |
15320 | Century Express | starting station | palia kalan |
52246 | Aishbagh – Mailani Passenger | starting station | Mailani |
15308 | Nainital Express | Starting Station | tanakpur |
Related Railway projects
Aishbagh junction terminal
this project was started on 1 May along with gauge conversion from meter to broad from very same station to pilibhit. In this project railway will develop this station as terminal for many northwest and north bound trains(from Delhi, sitapur, pilibhit, tanakpur, shahjahanpur, behraich, mailani, lalkuan, kathgodam. Seven platforms are under construction with a washing pit line and loop line along with an entirely new large station building and dual entrance.
Gauge Conversion
This project started on 15 May 2016 . Under this project meter gauge lines from lucknow to Tanakpur will be converted to broad gauge under three phases, where first phase will be finished by March 2017.
Aishbagh – Manaknagar bypass
under this project a one kilometer rail track will be constructed from Aishbagh station to Manak nagar through RDSO area of the city so that long distance trains fro Gorakhpur will directly pass from Aishbagh to Manak nagar without going to Lucknow Junction and thus avoiding the time loss in engine reversal.
Circular train
Honorable Home Minister Rajnath Singh Ji has announced that a local train just like that of Mumbai will run on Aishbagh-lucknow city-daliganj- badshahnagar- gomtinagar- malhour-juggaur-malhour-dilkusha –gwarigaon- Charbagh route to ease the pressure on the roads . The reports are already submitted and date for starting the project will soon be announced.
[3] ASH- MAL doubling and electrification
NER will double and electrify the rail track from Aishbagh to Malhour via Rakabganj to increase the speed of trains on this route.
Train Service Presently running
There are currently seven passenger trains that take a halt at this station .They are-
Train no. | Name | From | To |
---|---|---|---|
55050 | Lucknow Jn- Nakaha jungle passenger | Lucknow Jn | Nakaha Jungle |
64272 | LJN-Barabanki MEMU | Lucknow Jn | Barabanki |
64271 | Barabanki- LJN MEMU | Barabanki | Lucknow Jn |
64273 | Barabanki- LJN MEMU | Barabanki | Lucknow Jn |
64274 | LJN-Barabanki MEMU | Lucknow Jn | Barabanki |
55031 | Nakaha jungle-Lucknow Junction passenger | Nakaha Jungle | Lucknow Jn |
64275 | Barabanki- LJN MEMU | Barabanki | Lucknow Jn |
Memu servises from this station
From | TO | Type |
---|---|---|
Lucknow Junction | Barabanki JN | MEMU |
Kanpur Central | Barabanki Jn | MEMU |
Lucknow Junction | Gonda Jn | DEMU (proposed) |
Lucknow Junction | Sitapur Cantt | MEMU( proposed) |
Lines
- Aishbagh Jn – Lucknow Junction
- Aishbagh Jn – Manak Nagar – Kanpur Central (under construction)
- Lucknow Jn – BaraBanki – Gorakhpur
- Aishbagh Jn – Faizabad
- Aishbagh Jn – Sitapur – Hardoi
- Aishbagh Jn – Gonda – Balrampur
- Aishbagh Jn – Shahjahanpur-Delhi
- Aishbagh Jn – Sitapur Cantt (metre gauge trains withdrawn on 15 May 2016)[4]
References
- ↑ "Railway Station News. ASH/Aishbagh (5 PFs)". 13 May 2016.
- ↑ NYOOOZ. "Gomtinagar terminal to take pressure off Charbagh rly stn - Lucknow NYOOOZ". Retrieved 11 November 2016.
- ↑ indiarailinfo.com/station/map/utraitia-junction-utr/1114
- ↑ Oliver Fredrick (14 May 2016). "130-year-old 'Chhoti Line' train service chugs into history today". Hindustan Times.