Broadwater Energy

Broadwater Energy
Proposed Liquified Natural Gas Terminal
Country United States
State New York
Region Riverhead (town), New York
Municipality Wading River, New York
Coordinates 41°06′2.87″N 72°50′44.56″W / 41.1007972°N 72.8457111°W / 41.1007972; -72.8457111Coordinates: 41°06′2.87″N 72°50′44.56″W / 41.1007972°N 72.8457111°W / 41.1007972; -72.8457111
Length 1,200 ft (366 m)
Width 180 ft (55 m)
Height 80 ft (24 m)
Owner TransCanada Corporation and Shell Oil
Website: http://www.broadwaterenergy.com

Broadwater Energy is a Liquefied Natural Gas Terminal proposed to be built in Long Island Sound between New York State and Connecticut. The project has received vociferous objections from Connecticut officials and some New York state officials.

New York state officials had yet to decide whether to issue permits for the project as of March 2008, and Governor David Paterson said he might postpone a decision, originally scheduled to be made in April 2008 on whether to support the terminal.[1] The terminal received federal approval from the Federal Energy Regulatory Commission on March 21, 2008,[1] but energy analysts have said that state rather than regulators generally have the decisive role in deciding whether liquefied natural gas terminals may be built.[2]

It is to be operated by Broadwater Energy L.L.C., a joint venture by TransCanada Corporation and Shell Oil for the transfer of liquefied natural gas from ships to pipelines. The proposed floating unit would be about nine miles (14 km) north of Wading River, New York and 10 miles (16 km) south of New Haven, Connecticut -- the widest point in the Sound. After being unloaded, the liquefied gas would be warmed back into a gas and pumped through pipelines (with the specific pipeline on the bottom of the sound called the "Iroquois Gas Transmission." The company calls the term a "Floating Storage Regasification Unit," or FSRU.[3] It is expected 1 billion cubic feet (28,000,000 m3) of natural gas per day into the pipeline.[4]

The terminal would be about 1,200 feet (370 m) long and 180 feet (55 m) wide and would rise about 75 to 80 feet (24 m) above the water. It would have the capability to stockpile eight billion cubic feet of gas. The project also involves the laying of a 22-mile (35 km) long pipeline from the platform to the Iroquois line (off the shore the village of Nissequogue, New York).[5]

Broadwater's website notes advantages to consumers of cutting the cost of natural gas, cleaner fuel than oil, and the lack requirements to build onshore.

The State of New York which has territorial jurisdiction over the sound will have ultimate decisions on whether it will permit the project. Broadwater says on its website the project if built on plan between 2009 and 2010 would cost $20 million directly.[6]

Opposition

The project, which will be located off the coast of expensive residential property on eastern Long Island and eastern Connecticut, has stirred considerable local opposition including New York Senators, Charles E. Schumer and Hillary Clinton, and Representative Tim Bishop. Clinton said:

I, like many Long Islanders, remain concerned that the security risks and environmental threats posed by the project have not been properly addressed. I also share the view held by many Long Islanders that this project would have detrimental impacts on the quality of water and air surrounding the sound.[7]

Among the controversiesis concern that legislation may pass that would permit the Federal Energy Regulatory Commission to override local opposition.[8]

New York Governor Eliot Spitzer, who resigned from office in March 2008 and was replaced by David Paterson, took no position on the project but raised eyebrows in November 2007 when he hired Bruce Gyory, a Broadwater lobbyist, to advise the governor.[9]

Decision

On April 10, 2008, Governor Paterson rejects the Broadwater plan, stating at a Press Conference at Sunken Meadow State Park that it "Is not what Long Island Sound needs." Broadwater however does have the right to appeal to the US Department of Commerce.[10]

Timeline

References

  1. 1 2 3 Associated Press article, "U.S. Commission Approves Gas Terminal in L.I. Sound", March 21, 2008, as it appeared in The New York Times, p B4
  2. 1 2 3 4 Rather, John, "Long Island Sound Proposal Awaits Crucial Ruling", The New York Times, "Connecticut and the Region" section, page CT6, January 27, 2008
  3. Broadwaterenergy.com Overview Retrieved November 17, 2007
  4. Rep. Shays 'ashamed' of his opposition to Broadwater plant Newsday October 6, 2007
  5. Broadwater map Archived November 27, 2006, at the Wayback Machine.
  6. Economic Overview Broadwater Energy
  7. "Senator Clinton Reiterates Opposition to the Broadwater Project" February 9, 2007
  8. "Beset by Opposition, Broadwater Bets on Washington and Time" New York Times July 3, 2005
  9. "Spitzer picks Broadwater lobbyist as top adviser" Newsday November 2, 2007
  10. Anti-Broadwater Coalition Archived May 1, 2008, at the Wayback Machine.
  11. "Gas Plant in L.I. Sound Is Rejected" New York Times
This article is issued from Wikipedia - version of the 11/19/2016. The text is available under the Creative Commons Attribution/Share Alike but additional terms may apply for the media files.