Congregation Yetev Lev D'Satmar (Hooper Street, Brooklyn)

Kehilas Yetev Lev D'Satmar
Basic information
Location Kent Avenue and Hooper Street,
Williamsburg, Brooklyn,
New York City,
 United States
Geographic coordinates 40°42′04″N 73°57′47″W / 40.701031°N 73.963148°W / 40.701031; -73.963148Coordinates: 40°42′04″N 73°57′47″W / 40.701031°N 73.963148°W / 40.701031; -73.963148
Affiliation Orthodox Judaism
Rite Nusach Sefard (Satmar)
Status Active
Architectural description
Completed 2006
Specifications
Capacity 2300-4,350 (seated) 7,000 (total)
Materials steel frame, cinder block, stucco

Congregation Yetev Lev D'Satmar is a large Hasidic synagogue located at Kent Avenue and Hooper Street in Williamsburg, Brooklyn. Its building was constructed by followers of Aaron Teitelbaum as a result of a feud with followers of Zalman Teitelbaum (both sons of the deceased Satmar rebbe Moshe Teitelbaum). It has been dubbed the "miracle synagogue" because it was constructed in just 14 business days.[1][2]

Background

In 1984 Satmar Rebbe Moshe Teitelbaum placed his oldest son Aaron in charge of the Satmar community in Kiryas Joel, New York, but in 1999 he appointed his third son Zalman as his successor.[2] Since then the two sons and their respective followers have been feuding over who is the rightful successor of Moshe, with the followers of Aaron attempting to gain control of approximately $372 million (today $437 million) worth of Satmar buildings and land (including its synagogues) in Williamsburg and elsewhere.[3]

Following his death in April 2006, Moshe's will supported Zalman, as did a Satmar rabbinical court, though supporters of Aaron dispute the validity of both. After a New York state court ruled in July that the dispute was outside of its jurisdiction, followers of Aaron, who, in previous years, had been excluded from main Satmar institutions and celebrated the High Holy Days in a large tent, started plans to build an alternative main synagogue.[1]

Construction

In 2006 the synagogue was built in 14 days by a team of over 200 workers, including 125 employees and 80 volunteers.[4] Workers worked 18-hour days in order to have the building ready in time for the Jewish New Year,[4] pausing only on the Sabbath.[1]

As a result of the rapid pace of construction, a number of the city's Department of Buildings rules were violated, including "working without a sidewalk shed" and "straying from approved plans".[4] The department did not take action after two reports of unsafe working conditions, but issued a stop-work order after a worker fell about 20 feet from a metal structure on September 15. Nevertheless, work continued; according to the New York Sun, Jennifer Givner, a department spokesperson "could not rule out the possibility that the department had given the go-ahead to resume work",[1] and the congregation denied that it broke any rules.[4]

Building

The Hebrew lettering on the awning reads "Bais Hamedrash Hagodol d'Kahal Yetev Lev d'Satmar"

The 13,000[3] or 18,000[2] square foot steel frame structure has cinder block walls and is covered in stucco. The interior was not fully finished in time for the New Year, and it was planned that the concrete floors would be covered with wood and the walls with marble in time for the Simchat Torah holiday three weeks later.[1] The structure seats between 2,300[3] and 4,350[2] and has a total capacity of 7,000 people.[1]

The building was named after Aaron's great-great-grandfather Rabbi Yekusiel Yehuda Teitelbaum, known as "The Yetev Lev", after the name of a book of Torah commentary he published. Zalman's supporters derisively referred to the synagogue as "the Home Depot shul".[3]

See also

Notes

This article is issued from Wikipedia - version of the 8/27/2016. The text is available under the Creative Commons Attribution/Share Alike but additional terms may apply for the media files.