Đà Nẵng Hi-tech Park

Danang Hi-Tech Park
Khu công nghệ cao Đà Nẵng
Land use planning of Danang Hi-Tech Park
Year of establishment 2010
Area 1,129.76 ha
Address Hoa Lien, Hoa Vang
City Da Nang
Nation  Vietnam
Tel +84 511 3626704
Website http://www.dhtp.gov.vn/eng

Da Nang Hi-tech Park (DHTP) (Vietnamese: Khu công nghệ cao Đà Nẵng) was established under the Decision No. 1979/QD-TTg dated on October 28, 2010 of the Vietnamese Prime Minister.[1]

After the other two Hi-Tech Parks in Hanoi and Ho Chi Minh City, Danang Hi-Tech Park is the third one of the whole country. In the future, Danang Hi-Tech Park will be a destination for both domestic and foreign investors, boosting the science and technology development of Danang City in particular and Central Vietnam and Western Highlands in general.

Danang Hi-tech Park makes an effort to become an ecological township with a harmony between R&D, training, manufacturing hi-tech products, living environment and social-cultural environment. Location of Danang Hi-tech Park has favorable conditions to become an Eco-friendly park with beautiful mountainous landscape and a large scale undeveloped land. Especially, Hoa Trung Lake with 86 ha water surface offers Danang Hi-tech Park a natural advantage to regulate the regional environment.

Location

Danang Hi-Tech Park is planned in Hoa Lien and Hoa Ninh Commune, Hoa Vang District, Da Nang City, on the Danang – Quang Ngai expressway which connects all parts of the key economic zones in Central Vietnam: Chan May Economic zone (Thua Thien Hue Province), Chu Lai – Ky Ha Economic zone (Quang Nam Province), Dung Quat Economic zone (Quang Ngai Province). It is 22 kilometers from the downtown of Danang, 25 kilometers from Tien Sa Seaport and 17 kilometers from Da Nang International Airport.

The total planned area for Danang Hi-Tech Park is 1,129.76 hectares.[2]

Natural conditions

Danang Hi-Tech Park is located on a terrain, thus not being flooded in the rainy season. The park is surrounded by mountains to the south and the north, which help minimize the negative effects of typhoons.[3]
Geologically, the system here is metamorphically-graded and crystallized (with crystalline schists), which helps facilitate the infrastructure construction, ensure inexpensive costs in dealing with subsidence work during construction (Geological map of Vietnam - Cambodia - Laos, 1935, J. Fromaget and colleagues).[3]
Danang Hi-Tech Park area is in Eco-harmony with the natural landscape, clean natural environment, with plain, mountains, and forests, adjacent to the Cu De River, and not far away from the Bà Nà Hills.
Within the planned boundary is located Hoa Trung lake which an area of over 86 hectares of water surface, contributing to enhanced ecology and landscape of the Hi-Tech Park.[3]

Functional areas

Total area: 1,129.76ha
- Functional areas: 673.94ha (60%)
- Mountains, water surface and green belt: 455.82ha (40%)
The detailed planning of Danang Hi-tech Park
  1. Hi-tech production area: 208.08ha
  2. Logistics and hi-tech services area: 29.76ha
  3. Admin area: 39.29ha
  4. Technical infrastructure area: 7.07ha
  5. Land for supporting industries: 39.26ha
  6. R&D, training and incubation area: 94.51ha
  7. Residential area: 37.12ha
  8. Green area, parks and sports facilities: 72.53ha

Infrastructure

The transportation system

The roads in Danang Hi-Tech Park include:

The drainage system

Drainage in Hi-Tech Park is designed in separated directions, as follows:

Wastewater system

The water supply system

Power supply system

Danang Hi-Tech Park’s electricity is planned to be supplied by a 110/22 kV station with a capacity of 2x63 MVA which will be built in Hoa Lien. It is expected that by 2015 one 63 MVA transformer will be put into operation ahead. The 110 kV double circuit line power station will be connected to the 110 kV line from Hoa Khanh to Hai Van Tunnel.

Communications system

Danang Hi-Tech Park will have an information and communication system with high quality transmission line, ensuring smooth connection and information security.[4]

Investment incentive policy

Corporate income tax

- Tax rate incentives: applying tax rate of 10% for a period of 15 years. The period of applying tax rate is calculated from the first year the enterprises having revenue.
- Tax reduction and exemption periods: exemption for 4 years, 50% reduction of payable tax for the next 9 years. The exemption and reduction periods are calculated from the first year the enterprises having taxable income.

Land rental price

Methods of payment Land rental price (VND/m2/year)
Production projects Service and trading projects
Annual payment
8,400
10,500
One-off payment for the entire leasing period
5,250
7,350

Land rents

- Exemption for the entire leasing period for projects in:
+ Hi-tech application (in the list of high technologies prioritized for development investment as regulated by the Vietnamese Prime Minister)
+ Hi-tech production (in the list of hi-tech products eligible for investment promotion as regulated by the Vietnamese Prime Minister)
+ Manufacturing hi-tech products supporting for hi-tech industry
+ Hi-tech incubation and hi-tech enterprise incubation
+ Research and development
+ Venture capital
+ Construction and commercial operation of infrastructures in DHTP
+ Investment and development of water supply plants, water supply and drainage systems
- Exemption for 15 years for projects in:
+ Construction of apartment complex for workers in DHTP
+ Investment and commercial operation of:
  • Infrastructure of education and training institutions
  • Fairs, exhibitions, supermarkets and shopping malls
  • Logistics, warehouses (bonded warehouse, tax suspension warehouse)
  • Sport centers
- Exemption for 11 years for projects in:
+ Construction of dwelling houses for experts
+ Health care, cultural activities and other services related to residents' life in DHTP

Infrastructure using fee

- Infrastructure use fee: ~0.2 USD/m2/year
- 100% off infrastructure using fees for the first 02 years from the date of receiving land allocation and a 50% reduction for the 03 subsequent years for projects on hi-tech research and development, hi-tech incubation, or hi-tech human resources training.
- 100% off infrastructure using fees for the first 02 years from the date of receiving land allocation for Projects on the List of High technologies prioritized for development investment and the List of hi-tech products encouraged for investment issued with the Decision No. 66/2014/QD-CP dated November 25th, 2014 of the Vietnamese Prime Minister.
- 50% off infrastructure using fees for the first 02 years from the date of receiving land allocation for projects producing products included in Group VI - Products of support industries for hi-tech industries on the list of those prioritized for development issued with Decree No.111/2015/ND-CP dated November 3rd 2015 of the Vietnamese Government.

Support for investors [5]

Administrative Procedures

Danang Hi-Tech Park Management Board

Danang Hi-Tech Park Management Board was established by the Decision No. 1980/QD-TTg dated October 28, 2010 of the Vietnamese Prime Minister that has responsibilities in state management with DHTP [6]

References

  1. "Decision No. 1979/QD-TTg dated on October 28th, 2010". Vietnam Industry and Trade Information Center - Ministry of Industry and Trade.
  2. "Location of DHTP".
  3. 1 2 3 "Natural conditions of DHTP".
  4. "Infrastructure of DHTP".
  5. "Support for investors in DHTP".
  6. "Decision No. 1980/QD-TTg dated on October 28th, 2010" (PDF). Website DHTP.

This article is issued from Wikipedia - version of the 7/6/2016. The text is available under the Creative Commons Attribution/Share Alike but additional terms may apply for the media files.