Eckwersheim derailment

Eckwersheim derailment

Rear power car of derailed train
Location within France
Date 14 November 2015 (2015-11-14)
Time 15:05 (CET)
Location Eckwersheim, Bas-Rhin
Coordinates 48°41′25″N 7°42′19″E / 48.6902°N 7.7053°E / 48.6902; 7.7053Coordinates: 48°41′25″N 7°42′19″E / 48.6902°N 7.7053°E / 48.6902; 7.7053
Country France
Rail line LGV Est phase 2
Operator SNCF
Type of incident Derailment
Cause Excessive speed on curve due to late braking[1]
Statistics
Trains One
Passengers 4[lower-alpha 1]
Crew 49[3][4]
Deaths 11[5]
Injuries 42,[6] including 22 seriously injured[7]

On 14 November 2015, a TGV train derailed in Eckwersheim, Alsace, France, while performing commissioning trials on the second phase of the LGV Est high-speed rail line, which was scheduled to open for commercial service five months later. The derailment resulted in 11 deaths among those aboard, while the 42 others aboard the train were injured. It was the first fatal derailment in the history of the TGV and the third derailment since the TGV entered commercial service in 1981.[3][4][8]

The test train was traveling eastbound on the southern track when it entered a curve at 265 km/h (165 mph)—which was 89 km/h (55 mph) above its assigned speed—causing the rear bogie of the lead power car to derail to the left (outside of curve) due to centrifugal forces. The lead power car separated from the rest of the train, and the rear of the lead power car struck the concrete parapet on the abutment to a bridge over the Marne–Rhine Canal. The power car slid along the left parapet of the bridge and overturned, sliding down the embankment and coming to a rest 150 metres (490 ft) beyond the end of the bridge. Cars 2–7 derailed before the bridge and travelled off the embankment with enough speed to overshoot the canal and come to rest 80–130 m (260–430 ft) beyond the beginning of the bridge.[9]:21 Cars 8–9 came to rest on the east bank of the canal and the rear power car ended up partially submerged in the canal. According to investigators, late braking, which led to the train entering the curve at excessive speed, was the immediate cause of the accident. Criminal and technical investigations are ongoing. French national rail operator SNCF suspended test trials at high speeds until the lessons learned from the investigation were integrated into testing process. The scheduled opening of the second phase of the LGV Est for commercial service was delayed three months, from 3 April 2016 to 3 July 2016.[10]

Background

The LGV Est européenne (often shortened to LGV Est) is a high-speed rail line connecting Paris and Strasbourg. Development has been divided into two phases. The first phase, from Vaires-sur-Marne near Paris, to Baudrecourt opened on 10 June 2007.[11] Construction on the 106 km (66 mi) second phase, from Baudrecourt to Vendenheim, near Strasbourg, began in 2010.[12] The final weld of rails on the second phase occurred in March 2015, marking the completion of the line, although some work remained.[13] At the time of the derailment, the line was scheduled to open for commercial service on 3 April 2016, following commissioning trials and training for operators.[13]

The scheduled tests for the line consisted of four phases:[14]

  1. Factory testing of components of the line, completed in 2013–14;
  2. On-site testing of components and functioning of subsystems, completed in 2013–2014;
  3. Static testing of subsystems with slow-moving trains, completed from late 2014 to August 2015;
  4. Dynamic testing of the line with trains operating at high speed, began in September 2015 and scheduled to have been completed in November 2015.

A specialized test train, Dasye set 744 in a commemorative livery, arrived to conduct the fourth phase of testing, which began on 28 September 2015.[12] During this phase, more than 200 test runs would be performed on the line. The test runs would test ride smoothness, performance of the catenary, radio communications, and the signalling system.[12] During some runs, the test train would operate at 10% above the planned operational speeds for the line when it enters service.[15] Some automated safety systems were disabled to allow the test train to operate beyond normal operating conditions.[14] Orientation training for operators was scheduled to take place between January and March 2016 prior to the start of commercial service on the line, which was scheduled for 3 April 2016 at the time of the accident.[14] In January 2016, SNCF announced that the opening of the line would be delayed until to 3 July 2016.[10]

Accident

Departure

External images
Aerial overview of the crash site
The test train

Tests scheduled for 11 and 14 November were to traverse each of the two tracks, in both directions of travel and at a test speed 10% above the speed limit when the line is in commercial service.[9]:6 On the afternoon of 14 November, the test train was scheduled to depart Meuse TGV Station at 14:18 and arrive at Strasbourg Station at 15:17.[9]:6 At 14:26, authorization was given to begin the test and the test train left Meuse TGV Station two minutes later.[9]:7 During this test, the test train traveled eastbound on Track 2, the southern track on the east-west oriented LGV Est, in the direction opposite normal operation (Strasbourg towards Paris).[9]:6[14] The Meuse-Strasbourg run was the last series of tests on the line during the fourth phase of tests.[16]

The train reached a maximum speed of 352 km/h (220 mph) on sections where the speed limit will be 320 km/h (200 mph). As the train approached the flying junction in the commune of Vendenheim, it should have slowed from 352 to 176 km/h (220 to 110 mph) before reaching Kilometer Point (KP) 403.809, where the speed limit for commercial service will be 160 km/h (100 mph).[9]:6–7 As the track begins a long, right-hand curve into the flying junction, it is raised on an embankment, approximately 5–8 m (16–26 ft) high,[9]:10 and crosses a bridge over the Marne–Rhine Canal.[14] The flying junction marks the end of the LGV Est line, after which the train was to continue on an existing, non-high-speed rail line leading to Strasbourg Station.[14][15]

Derailment

The concrete parapet on the southern side of the western abutment remains intact (1), while the concrete parapet on the northern side was impacted by the train and destroyed (2). A pantograph (3) and its subassembly (4), detached from one of the power cars, is seen in the bottom center. There is also a bogie remaining on the tracks (5).

As the train entered the right-hand curve into the flying junction, the rear bogie of the lead power car derailed to the left (outside of the curve) at 15:04:42 at approximately KP 404.003.[9]:10, 15 Violent transverse movements at the rear of the lead power car caused it to separate from the rest of the train.[9]:8 The rear of the lead power car struck a concrete parapet (KP 404.209) on the leading abutment to the bridge over the Marne–Rhine Canal.[9]:8 The impact broke apart the lead power car and caused oil to leak from the lead power car's transformer, which ignited and was spread across the bridge and canal banks. The rear bogie of the lead power car remained where it impacted the concrete parapet. The transformer of the lead power car landed on the east bank of the canal. The remainder of the lead power car slid along the left parapet of the bridge. At the end of the bridge, it overturned, slid down the embankment and came to a rest 150 metres (490 ft) beyond the end of the bridge.[9]:18,20

Cars 2–7 derailed before the bridge and traveled off the embankment with enough speed to overshoot the canal and come to rest 80–130 m (260–430 ft) beyond the beginning of the bridge.[9]:21[15][17] Cars 8–9 came to rest on the east bank of the canal and the rear power car ended up partially submerged in the canal.[9]:22[15][17]

Response and casualties

At 15:05, the train disappeared from the approach zone for the Vendenheim junction on the display being monitored by staff at the signalling control center.[9]:7 At 15:10, the control center initiated emergency procedures for the loss of a train and closed the non-high-speed rail lines that pass through the Vendenheim junction.[9]:17 At approximately the same time, one of the companies involved in the construction of the line received a call from an employee aboard the train, who informed them of the derailment.[9]:8, 17 Shortly before 17:45, the local mass casualty plan was enacted.[18] Emergency medical and fire rescue services along with 100 gendarmes responded to the incident. At its height, 104 engines from three départments responded to the incident—65 from Bas-Rhin and 39 from Moselle and Haut-Rhin.[6] Those with minor injuries were treated by responders from the French Red Cross, which operated at the school in Eckwersheim.[19] The French Minister of Ecology, Sustainable Development and Energy, Ségolène Royal, and the Secretary of State for Transport, Alain Vidalies, travelled to the site shortly after the crash.[20] The president of SNCF, Guillaume Pepy, and the president of SNCF Réseau, Jacques Rapoport, also travelled to the site in the hours after the accident.[20]

The train was carrying 53 persons, including four children, ages 10–15, who were not officially authorized to be aboard.[21] The derailment resulted in 11 deaths, which included four employees of SNCF, five technicians from the engineering firm responsible for the tests, and two guests.[22] Ten died at the crash scene, one died the following evening, and one seriously injured person remained in hospital as of February 2016.[7] Among the dead was the director of the LGV Est line for SNCF Réseau, which owns France's railroad infrastructure.[23] Despite breaking in two pieces and the severe impact with the parapet, there were no deaths among the seven people in the front cab. The second-to-last car impacted the canal wall and was the car with the highest death toll.[16] It was the first fatal derailment in the history of the TGV and the third derailment since the TGV entered commercial service in 1981.[8]

Investigation

Three investigations have been opened.[14] The French Land Transport Accident Investigation Bureau (BEA-TT, Bureau d'Enquêtes sur les Accidents de Transport Terrestre) is responsible for investigating rail accidents in France[24] and will conduct a non-judicial technical investigation.[20] A criminal investigation and internal investigation by SNCF have also been opened.[14][25] Among the subjects which SNCF will investigate is whether there was a dereliction of duties by an SNCF employee that resulted in the unauthorized children riding on the train. The president of SNCF has exclaimed: "This is not a practice that SNCF recognizes. A test train is a test train."[21] The derailment occurred the day after the November 2015 Paris attacks, initially sparking fears that the derailment was the work of terrorists.[4][26][27]

On 19 November, SNCF announced the initial findings of their investigation. The train's event recorder indicated that the train entered the curve at 265 km/h (165 mph) and was travelling at 243 km/h (151 mph) at the moment it derailed, which investigators have determined to be a result of centrifugal forces.[1][14] The speed at the moment of derailment was 67 km/h (42 mph) above the train's assigned operating speed on the curve. According to the SNCF, the "immediate cause" of the accident was "a late braking sequence";[14] the braking should have begun at least 1 km (1,100 yd) or 12 seconds earlier.[1][14][16] The investigation has found no fault for the accident in the infrastructure, train, or member of the technical team.[1][14][16] There were seven people in the driving cab at the time of the accident, all of whom survived. Investigators have suggested that this may have been a factor in the late braking.[1] SNCF will begin disciplinary proceedings and take punitive measures against employees responsible for, among other things, the "reckless presence" of children on the test train, presence of seven people in the cab, the lack of rigor in creating lists of those onboard and controlling access to the train, and "without doubt" the human errors in the cab.[14]

Aftermath

Ceremony in remembrance of the victims at Strasbourg station, 16 November

SNCF held a minute of silence, for the victims, during the course of operations on Monday, 16 November. The following day, a memorial service was held in the church in Mundolsheim, which was attended by SNCF President Guillaume Pepy.[14] SNCF suspended all test trials at high speeds until the lessons learned from the investigation can be integrated into testing processes.[14][16] The scheduled opening of the second phase of the LGV Est for commercial service has been delayed by three months, from 3 April 2016 to 3 July 2016.[10] Trains will operate on the single intact track until the damaged track is repaired, which will take 7 months once the judicial inquiry lifts its hold on the track.[10]

See also

Notes

  1. Four minors, ages 10–15, aboard the train were not authorized by SNCF but are counted as "passengers".[2]

References

  1. 1 2 3 4 5 "Late braking caused TGV derailment, says SNCF". Railway Gazette. 19 November 2015. Retrieved 19 November 2015.
  2. "Onze morts à Eckwersheim, premiers éléments d'enquête". L'Alsace.fr (in French). 15 November 2015. Retrieved 16 November 2015.
  3. 1 2 "French TGV high-speed train derails near Strasbourg". BBC News. 14 November 2015. Retrieved 14 November 2015.
  4. 1 2 3 Bach, Christian; Poivret, Aurélien (14 November 2015). "Accident de la rame d'essai de TGV : 10 morts, douze blessés dans un état grave, cinq personnes recherchées, numéro vert mis en place". Les Dernières Nouvelles d'Alsace (in French).
  5. "France TGV crash: Children on board derailed train". BBC News. 15 November 2015. Retrieved 15 November 2015.
  6. 1 2 "Accident de TGV en Alsace: la SNCF fera jeudi un point sur son enquête interne". Les Dernières Nouvelles d'Alsace (in French). 18 November 2015.
  7. 1 2 BEATT (5 February 2016). "Note d'étape sur le déraillement de la rame d'essai de la LGV Est-Européenne survenu le 14 novembre 2015 à Eckwersheim" (PDF).
  8. 1 2 Ferran, Benjamin (14 November 2015). "Le premier déraillement mortel de l'histoire du TGV". Le Figaro (in French). Retrieved 15 November 2015.
  9. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 SNCF - Direction générale de l'audit et des risques, Direction des audits de sécurité (19 November 2015). Rapport d'enquête immediate n° 2015-AS-67: Déraillement du train d’essai n°814521 sur le raccordement de Vendenheim de la LGV EE en construction le 14 novembre 2015 [Urgent Inquiry Report No. 2015-AS-67: Derailment of Test Train No.814521 on the Vendenheim Junction of the Under-Construction LGV EE on 14 November 2015] (PDF) (Report) (in French). Archived (PDF) from the original on 20 November 2015.
  10. 1 2 3 4 Bonnet, Julien (21 January 2016). "La SNCF reporte la mise en service de la LGV Est-Européenne au 3 juillet". L'Usine Nouvelle (in French). Retrieved 9 February 2016.
  11. "LGV Est Européenne / Les enjeux du Projet" (in French). SNCF Réseau. Retrieved 26 November 2015.
  12. 1 2 3 "Testing starts on LGV Est Phase 2". Railway Gazette. 29 September 2015. Retrieved 15 November 2015.
  13. 1 2 "LGV Est Phase 2 completed". Railway Gazette. 31 March 2015.
  14. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 "Déraillement d'un TGV d'essai près de Strasbourg" (in French). SNCF. 15 November 2015. Retrieved 15 November 2015.
  15. 1 2 3 4 "Test train catastrophe on LGV Est". Railway Gazette. 16 November 2015. Retrieved 16 November 2015.
  16. 1 2 3 4 5 "Un freinage tardif à l'origine de l'accident du train qui a déraillé à 243 km/h". Les Dernières Nouvelles d'Alsace (in French). 19 November 2015.
  17. 1 2 "At least 10 killed as train derails during testing in eastern France". Reuters. 14 November 2015. Retrieved 14 November 2015 via trust.org.
  18. "Déraillement de TGV en Alsace: Dix morts et douze blessés en urgence absolue...". 20minutes.fr (in French). 14 November 2015.
  19. Costentin, Blandine; Cohen, Olivia (14 November 2015). "Déraillement d'un TGV près de Strasbourg: l'école du village transformée en hôpital de campagne". France Bleu (in French).
  20. 1 2 3 de Chalendar, Hervé; Loos, Jean-Marc (14 November 2015). "Une rame d'essai TGV déraille à Eckwersheim : 10 morts, 40 blessés". L'Alsace.fr (in French).
  21. 1 2 Petry, Antoine (17 November 2015). "Déraillement d'un TGV d'essai : les énigmes d'Eckwersheim". L'Est Républicain (in French). Retrieved 17 November 2015. Parmi les blessés, les services de secours ont soigné quatre mineurs âgés de 10 à 15 ans. Leur présence à bord du train demeurait, hier, une énigme sur laquelle personne, à la SNCF, ne se bousculait pour apporter des précisions. « Ce n’est pas une pratique que la SNCF reconnaît. Un train test est un train test », a déclaré Guillaume Pépy, le patron de la SNCF.
  22. Rousseau, Céline (28 December 2015). "RETRO 2015 - Un TGV déraille à Eckwersheim, 11 personnes décèdent". france bleu<!- -not capitalied --> (in French). Retrieved 9 February 2016.
  23. "Décès d'Alain Cuccaroni, enseignant à l'École" (in French). École des ponts ParisTech. 19 November 2015. Retrieved 21 December 2015.
  24. "Land transport accident investigation bureau (BEA-TT)". French Land Transport Accident Investigation Bureau. Retrieved 14 November 2015.
  25. "Accident du TGV à Eckwersheim : des juges désignés pour enquêter". L'Alsace.fr (in French). Agence France Presse. 7 December 2015. Retrieved 3 January 2016. LA: Criminal investigation
  26. McKeown, Rory (14 November 2015). "BREAKING: Train derails in France after more extremist Twitter threats". Daily Star. Northern and Shell Media Publications. Retrieved 14 November 2015.
  27. Chappell, Bill (14 November 2015). "French High-Speed Train Derails Close To German Border". NPR. Retrieved 14 November 2015.
Wikimedia Commons has media related to Eckwersheim derailment.
This article is issued from Wikipedia - version of the 10/8/2016. The text is available under the Creative Commons Attribution/Share Alike but additional terms may apply for the media files.