Glasshoughton railway station
Glasshoughton | |
---|---|
Platform 2, July 2006 | |
Location | |
Place | Glasshoughton |
Local authority | City of Wakefield |
Coordinates | 53°42′31″N 1°20′26″W / 53.70861°N 1.34056°WCoordinates: 53°42′31″N 1°20′26″W / 53.70861°N 1.34056°W |
Grid reference | SE436237 |
Operations | |
Station code | GLH |
Managed by | Northern |
Number of platforms | 2 |
DfT category | F1 |
Live arrivals/departures, station information and onward connections from National Rail Enquiries | |
Annual rail passenger usage* | |
2010/11 | 0.138 million |
2011/12 | 0.139 million |
2012/13 | 0.180 million |
2013/14 | 0.178 million |
2014/15 | 0.181 million |
Passenger Transport Executive | |
PTE | West Yorkshire Metro |
Zone | 3 |
History | |
Key dates | Opened February 21, 2005 |
National Rail – UK railway stations | |
* Annual estimated passenger usage based on sales of tickets in stated financial year(s) which end or originate at Glasshoughton from Office of Rail and Road statistics. Methodology may vary year on year. | |
UK Railways portal |
Glasshoughton railway station serves Glasshoughton, Castleford in West Yorkshire, England. It lies on the Pontefract Line, operated by Northern, 12 miles (19 km) south east from Leeds.
It was opened by West Yorkshire Metro on 21 February 2005.[1] It is located near to the Xscape indoor ski slope and leisure complex near Castleford, all of which occupy the former site of Glasshoughton Colliery[2] which ceased winding coal in 1986.[3]
Demand for the new station was seriously under-estimated by Metro. For example, passenger journeys in 2008/09 were forecast to be 50,989 but were actually 135,279. This was chiefly because usage was modelled on the basis of demand for travel by current local residents and businesses only. No attempt was made to estimate possible travel to the station for local retail and leisure attractions, nor possible travel by people driving to the 100-space car park on a park and ride basis, e.g. from the nearby M62. Demand from future residential developments at Glasshoughton was also ignored.[4]
Services
There is hourly service to Leeds and Knottingley Monday through Saturday (plus one single afternoon service through to Goole), and a service every two hours in each direction on Sunday.[5]
References
- ↑ Lowson, Rob (11 December 2015). "Transport chiefs optimistic Apperley Bridge station will open on Sunday - despite safety certificate delay". Telegraph and Argus. Retrieved 17 March 2016.
- ↑ "More than 900 homes at former pit". Pontefract and Castleford Express. 18 July 2015. Retrieved 17 March 2016.
- ↑ Shannon, Paul (June 2009). "How King Coal lost his Throne". Railways Illustrated. Vol. 7 no. 6. p. 12. ISSN 1479-2230.
- ↑ Steer Davies Gleave (August 2010). "Station Usage and Demand Forecasts for Newly Opened Railway Lines and Stations" (PDF). Department for Transport. pp. 139–140. Retrieved 30 August 2013.
- ↑ GB eNRT, May 2016 Edition, Table 32
External links
- Train times and station information for Glasshoughton railway station from National Rail
Preceding station | National Rail | Following station | ||
---|---|---|---|---|
Northern Pontefract Line |