Hudson Project
Hudson Project | |
---|---|
Location | |
Country | United States |
State |
New York New Jersey |
Province |
Bergen County, NJ and New York City |
From | Ridgefield, New Jersey |
Passes through |
Edgewater, New Jersey Hudson River |
To | Manhattan, New York City |
Construction information | |
Manufacturer of substations | Siemens |
Commissioned | 2013 |
Technical information | |
Power rating | 660 MW |
AC Voltage | 230/345 kV |
DC Voltage | 180 kV |
The Hudson Project is a 345 kV AC powerline for the power supply of New York City from PSEG's Bergen Generating Station, in Ridgefield, New Jersey.[1][2]
Overview
It consists of a HVDC back-to-back station with a transmission rate of 660 MW and DC voltage of 180 kV at 1 Railroad Avenue (40°49′56″N 74°00′44″W / 40.83222°N 74.01222°W) in Ridgefield, New Jersey, which is connected by a 230 kV line with the nearby substation. From the static inverter plant the three-phase AC line to Consolidated Edison's W. 49th Street substation at 40°45′57″N 73°59′45″W / 40.76583°N 73.99583°W starts, is in its whole length implemented as underground or submarine cable, buried 10 feet (3.0 m) in non-navigable and 15 feet (4.6 m) in navigable sections.[3]
After travelling through the Edgewater Tunnel, the cable enters the Hudson River at Edgewater and runs along the eastern side of the river parallel to the shore until piers 92 and 94, where it enters Manhattan.[3]
Construction of the link started in May 2011 and was completed in June 2013.[4]