Keihan Nakanoshima Line
Keihan Nakanoshima Line | |
---|---|
Nakanoshima Station platforms, October 2008 | |
Overview | |
Native name | 中之島線 |
Type | Commuter rail |
Locale | Osaka |
Termini |
Temmabashi Nakanoshima |
Stations | 5 |
Operation | |
Opened | October 19, 2008 |
Owner | Nakanoshima High Speed Railway Company |
Operator(s) | Keihan Electric Railway |
Depot(s) | none |
Technical | |
Line length | 3.0 km (1.9 mi) |
Track gauge | 1,435 mm (4 ft 8 1⁄2 in) |
Electrification | 1,500 V DC, overhead catenary |
The Keihan Nakanoshima Line (京阪中之島線 Keihan Nakanoshima-sen) is a railway line operated by the Keihan Electric Railway in Osaka, Japan. It opened on October 19, 2008, and has a ruling grade of 1 in 25 (4%).
Services
The following services operate on the Nakanoshima line, with through-running to/from the Keihan Main Line. All services stop at all stations on the Nakanoshima line.[1]
- Local (普通): Nakanoshima–Kayashima, Demachiyanagi
- Semi-Express (区間急行): Nakanoshima–Kayashima, Hirakatashi / Kuzuha → Nakanoshima (rush hours only)
- Sub Express (準急): Nakanoshima–Demachiyanagi
- Commuter Sub Express (通勤準急): (weekday mornings only)
- Rapid Express (快速急行): (rush hours only)
- Commuter Rapid Express (通勤快急): Demachiyanagi–Nakanoshima (weekday mornings only)
Stations
Station number | Station name | Distance (km) | Location |
---|---|---|---|
KH54 | Nakanoshima (Osaka International Convention Center) |
0.0 | Kita-ku, Osaka |
KH53 | Watanabebashi | 0.9 | |
KH52 | Ōebashi | 1.4 | |
KH51 | Naniwabashi | 2.0 | |
KH03 | Temmabashi | 3.0 | Chūō-ku, Osaka |
History
- July 10, 2001: Nakanoshima High Speed Railway Company was founded.
- May 28, 2003: Construction work commenced.
- November 13, 2006: New line and station names were officially announced.
- October 31, 2007: Tunnelling was completed.
- August 1, 2008: Test running commenced.[2]
- October 19, 2008: Line opened.
References
This article incorporates material from the corresponding article in the Japanese Wikipedia
- ↑ Tetsudō Daiya Jōhō Magazine, November 2008 issue: "中之島線開業にともなう新ダイヤの概要", p. 14-17
- ↑ Keihan press release: "中之島線内で習熟訓練運転を開始しました" (Nakanoshima Driver Training Starts), (August 1, 2008). Retrieved on October 24, 2008. (Japanese)
External links
- Keihan Nakanoshima Line website (Japanese)
This article is issued from Wikipedia - version of the 9/24/2016. The text is available under the Creative Commons Attribution/Share Alike but additional terms may apply for the media files.