Line H (Buenos Aires Underground)


Line H

Overview
Type Rapid transit
System Buenos Aires Underground
Termini Las Heras
Hospitales
Stations 11
Daily ridership

14,093 (2008)
23,852 (2009)[1] 41.4%

80,000 (2015)
Operation
Opened 18 October 2007
Operator(s) Metrovías
Character Underground
Rolling stock 300 Series
Technical
Line length 8-kilometer (5.0 mi)
Track gauge 1,435 mm (4 ft 8 12 in)
Electrification Catenary
Route map
Legend
Retiro Mitre Line
Terminal de Ómnibus Bus interchange
Padre Mugica
planned extension
 
Facultad de Derecho
under construction
Mitre Line
Las Heras
Santa Fe
Córdoba
Corrientes
Once - 30 de Diciembre Domingo Faustino Sarmiento Railway
Venezuela
Humberto I
Inclán
Caseros
Colonia Workshops
Parque Patricios

Shops

Hospitales
Sáenz
under construction
Belgrano Sur Line

Line H of the Buenos Aires Underground, is the first entirely new line built in Buenos Aires since the opening of Line E on 20 June 1944. The first phase, between Plaza Once and Caseros, opened 18 October 2007, currently it stretches over 8 km between stations Hospitales and Las Heras.[2]

According to projections, the line will stretch a total of about 11.85 km and will run from between Retiro to Sáenz once the remaining sections are constructed. It connects the southern part of the city with the north, improving the flow to the centre of the city. It is also designed to serve as a transversal line and provide cross-connections across all radial lines, mainly under the axis of Jujuy and Pueyrredón avenues.

Rolling stock

The 300 Series (right) is set to replace the Siemens O&K stock (left).

Line H is currently served by a temporary fleet of refurbished vintage Siemens-Schuckert Orenstein & Koppel train sets originally introduced on line C, with electric current supplied by overhead lines. The cars feature 42 seats and 4 doors per side.[3]

As the line is extended and passenger numbers increase, the rolling stock will be replaced by brand new Alstom Metropolis units ordered from that company in 2012 in order to make up the entirety of the Line's rolling stock. The first 6 of the 120 new Alstom cars arrived In August 2015, with the remainder arriving gradually, in time for the inauguration of the section of the line which connects it to Line D.[4][5][6]

Further expansion

Visitors at Las Heras station before its inauguration.

An initial extension to Corrientes station was inaugurated on Monday 6 December 2010.[7] The Córdoba and Las Heras stations opened in December 2015 with Santa Fe (which links Line H to Line D) set to open in April 2016. This will also mean that the extension will be inaugurated along with the line's new Alstom Metropolis rolling stock, which arrives in the country before then.[8]

The Facultad de Derecho station (located at the University of Buenos Aires Faculty of Law) was originally intended to be located across the road next to Plaza Francia, however concerns that it would damage the prestigious Recoleta Cemetery necessitated the revisal of these plans and therefore delayed construction of the station, which is now set to open in 2017.[9] The final stretch to Retiro is not set to open until some time after since its trajectory must also be revised following the relocation of the Plaza Francia station.

Chronology

Date Text
2007-10-18 Line H was inaugurated between Once and Caseros.
2010-12-06 The line is extended northbound from Once to Corrientes.[10]
2011-10-04 Parque Patricios station opened.
2012-01 Works in the extension towards Plaza Francia (North) and Nueva Pompeya (South) began.
2013-05-27 Hospitales station opened.
2015-12-18 Las Heras and Cordoba stations opened.
2016-07-12 Santa Fe station opened.