Lumot Dam

Lumot Dam is an embankment dam located between the towns of Cavinti and Lumban, in the province of Laguna, Philippines. The dam was constructed across Lumot River creating a reservoir now known as Lumot Lake or Sierra Lake. Lumot Lake provides additional water through a Bell-mouth spillway and tunnel to Caliraya Lake, which in turn serves as the upper reservoir for the Kalayaan Pumped-Storage Hydroelectric Plant.[1]

History

Lumot Dam was started on June 1, 1948 with the passing of Republic Act no. 216 approving expenditures for the construction of several hydroelectric dams in the Philippines including the diversion of Lumot River and raising of the height of Caliraya Dam.[2]

References

  1. Task Committee on Pumped Storage (1996). "Hydroelectric Pump Storage Technology: International Experience", p.28. American Society of Civil Engineers.
  2. (1998). "Republic Act no. 216". Chan Robles Virtual Law Library. Retrieved on 2011-03-06.

Coordinates: 14°15′50″N 121°32′31″E / 14.26389°N 121.54194°E / 14.26389; 121.54194

This article is issued from Wikipedia - version of the 6/11/2014. The text is available under the Creative Commons Attribution/Share Alike but additional terms may apply for the media files.