Navayuga Engineering Company Limited
Private | |
Founder | Mr. C. Viswesara Rao |
Headquarters | Visakhapatnam, India |
Website | http://www.necltd.com/ |
Navayuga Engineering Company Limited (NECL), the flagship entity of the Navayuga Group started its operations in the year 1986 as a private limited company.
Sectors
- Special foundations
- Industrial structures
- Marine structures
- Infrastructure works
Projects
- Krishnapatnam Port[1]
- The Dhola-Sadiya bridge India's longest bridge which spans across the Lohit River to connect the states of Assam and Arunachal Pradesh.[2] The bridge is 3.55 kilometres (2.21 mi) longer than the Bandra Worli sea link over the Mahim Bay in Mumbai.
- Marine structures in the ports of Visakhapatnam, Pipavav, Haldia, Tuticorin, Kandla, JNPT, Mangalore and Kakinada.[3][4]
- Sripada Sagar Project – Stage II, Phase - I [5]
- Construction of Sri Komaram Bhim Project (Pedda vagu project) [6]
- Pranahitha - Chevella Lift Irrigation Scheme ( Link II - Package No - 6 & Link VII - Package No - 21)
- Construction of Chagallu Barrage [7]
- Bheema lift irrigation project[8]
- MAHATMA GANDHI (Kalwakurthy) Lift Irrigation Scheme [9]
- Koderma Thermal Power Station, Jharkhand
References
This article is issued from Wikipedia - version of the 11/2/2016. The text is available under the Creative Commons Attribution/Share Alike but additional terms may apply for the media files.