Parichha Thermal Power Station
Parichha Thermal Power Station is located at Parichha in Jhansi district in the Indian state of Uttar Pradesh, about 25 km from Jhansi on the bank of Betwa river. The power plant is owned and operated by Uttar Pradesh Rajya Vidyut Utpadan Nigam.
Operations
The plant has two stages, having 6 units altogether. The machinery is from Bharat Heavy Electricals Limited, M/s ABB, M/s Alstom, M/s Yokogawa. The coal to all these units is fed from coal mines of Bharat Coking Coal Limited and Eastern Coalfields Limited via rail.
All the units of this station are coal-fired thermal power plants, having a total generating capacity of 1140 MW and consisting of the following units -
Stage | Units No. | Installed Capacity | Derated Capacity | Date of Synchronization | Date of Commercial Operation | Original Equipment Manufacturers |
---|---|---|---|---|---|---|
1 | 01 | 110 | 110 | 31.03.1984 | 01.10.1985 | M/s Bharat Heavy Electricals Limited, India. |
2 | 02 | 110 | 110 | 31.03.1984 | Dec.1984 | M/s Bharat Heavy Electricals Limited, India. |
3 | 03 | 210 | 210 | May.2006 | 24.11.2006 | M/s Bharat Heavy Electricals Limited, India. |
4 | 04 | 210 | 210 | 28.12.2006 | 01.12.2007 | M/s Bharat Heavy Electricals Limited, India. |
5 | 05 | 250 | 250 | 15.05.2012 | 17.07.2012 | M/s Bharat Heavy Electricals Limited, India. |
6 | 06 | 250 | 250 | 17.09.2012 | 18.04.2013 | M/s Bharat Heavy Electricals Limited, India. |
The coal to all these units is fed from coal mines of BCCL, ECL by means of railways.
Capacity
Parichha Thermal Power Station has a capacity of 1140 MW; 2 units of 110 MW, 2 units of 210 MW and 2 units of 250 MW. Its sixth unit of 250 MW was commissioned in Apr 2013 taking the total installed capacity to 1140 MW. It is connected to the national grid through NRLDC Delhi. Although the super thermal plant has poor facilities for basic amenities.[1]
Stage | Unit Number | Installed Capacity (MW) | Status |
---|---|---|---|
1 | 1 | 110 | Running |
1 | 2 | 110 | Running |
2 | 3 | 210 | Running |
2 | 4 | 210 | Running |
3 | 5 | 250 | Running |
3 | 6 | 250 | Running |
References
- ↑ "BHEL commissions 250 MW Unit-5 at Parichha Thermal Power Project". Sarkaritel.com. 2012-05-29. Retrieved 2013-01-15.
- Pariccha Plant Thermal Power Station
- Power station chimney collapses; 50 feared trapped, Express News Service, 25 May 2010