Szczecin–Świnoujście railway

Szczecin–Świnoujście railway
Overview
Type Heavy rail
Status in use
Locale Poland
Termini Szczecin
Świnoujście
Operation
Opened 1882 (1882)
Technical
Line length 100.713 km (62.580 mi)
Track gauge 1,435 mm (4 ft 8 12 in)
Electrification 3000 V DC
Operating speed 130 km/h (81 mph)
Route number 401

The Szczecin–Świnoujście railway is a Polish 100-kilometre long railway line, that connects Szczecin with the port in Świnoujście. The railway is part of European TEN-T route E59 from Scandinavia to Vienna, Budapest and Prague. For this reason the classification of the PLK line is also in the "first-class" category.

Opening

The first section of the line from Szczecin to Goleniow was built as part of Line 402 to Gryfice was built by Altdamm-Colberger Eisenbahn-Gesellschaft (ACE), which put the line into use in 1882. Ten years later, the line was extended from Goleniów to Wolin by the Preußische Ostbahn, or Prussian Eastern Railway in English. After the nationalisation of the Preußische Ostbahn in 1888, the next section was built under the banner of Preußische Staatseisenbahnen, before the end of the nineteenth century. In 1899, the line was extended to Międzyzdroje, and a year later to Swinoujscie. In 1901, the station in Swinoujscie (on the island of Wolin) was connected by a railway ferry crossing to the station Swinemünde Hauptbahnhof (Świnoujście Main Station) on the island of Usedom.

Between 1945 and 1948 trains could not operate between Recław and Wolin, because the bridge over the River Dziwna had been destroyed. Because of the Oder–Neisse line, in the Potsdam Agreement the line came under the ownership of the Polish State Railways. Following the War a ferry service was started from Świnoujście to Ystad in Sweden. In 1950 the railway line was extended a short distance to Świnoujście Port, to the ferry terminal. Only a few trains travel to the port station, the majority finishing at Świnoujście station.

Electrification

In December 1979, electrification of the line from Szczecin to Goleniów was completed and in 1980 the rest of the line was electrified.

Route

Most of the route (93.5%), is double track.

Between the signal boxes "SDA" (on the Poznań–Szczecin railway from / to Stargard ) and "SDC" (Szczecin–Świnoujście) is a track, No. 857, which is used by trains between Goleniów and Stargard without having to change direction in Szczecin.

Modernisation

In 2016 it is planned to modernise the Szczecin Dąbie - Kliniska and Rurka - Goleniów sections, which will increase line capacity and increase line speeds to 160 km/h.

Usage

Past

The German train timetable for the line shows that in 1917 the line was served by five train pairs per day between Szczecin and Świnoujście.

In 1981, 12 train pairs of passenger trains, and 5 pairs of fast trains which operated during the holiday season, operated on the line. Only 1 pair of trains ran to the station Świnoujście Port. One train pair operated to Kamien Pomorski and five train pairs operated to Gryfic from Goleniów.

Current

The line is used by the following service(s):

See also

References

    Media related to Szczecin–Świnoujście railway at Wikimedia Commons

    This article is issued from Wikipedia - version of the 10/30/2016. The text is available under the Creative Commons Attribution/Share Alike but additional terms may apply for the media files.