The Mark (Bucharest)
The Mark | |
---|---|
General information | |
Status | Under construction |
Type | Office building |
Location | Bucharest |
Coordinates | 44°27′46.5″N 26°3′21.3″E / 44.462917°N 26.055917°ECoordinates: 44°27′46.5″N 26°3′21.3″E / 44.462917°N 26.055917°E |
Groundbreaking | 2016 |
Estimated completion | 2018 |
Cost | €66 million |
Height | |
Tip | 70 m (230 ft) |
Technical details | |
Floor count | 15 |
Floor area | 24,000 m2 (260,000 sq ft) |
Design and construction | |
Architect | Chapman Taylor |
Developer | S Immo |
The Mark, is a future class A office building that will be constructed in the north-western part of Bucharest in the vecinity of the Bucharest North railway station. The building will have a total of 15 floors with two underground, one ground and 14 upground floors and a gross leasable area of 24,000 m2 (260,000 sq ft).[1] At completion the 70 m (230 ft) high building will be one of the tallest in Bucharest.[2] The construction of the building started in March 2016 and is expected to be completed in the first quarter of 2018 at a total cost of €66 million.[3]
The project was announced for development in 2012 but was put on hold soon after by its developer, the real estate branch of the Austrian Erste Group, due to other large construction works underwent in the area. The project also comprises a second smaller six floor office building named The Podium with a gross leasable area of around 21,500 m2 (231,000 sq ft).[4]
See also
References
- ↑ "THE MARK - o nouă clădire-simbol în București. Proiectul aparține fondului austriac de investiții S IMMO AG" (in Romanian). B1 TV. 29 June 2016.
- ↑ "Fondul austriac de investiţii în imobiliare S IMMO: Nu putem începe construcţia proiectului de birouri din Griviţa pentru că zona arată ca un câmp de luptă" (in Romanian). zf.ro. 29 June 2016.
- ↑ "S IMMO incepe in martie constructia cladirii The Mark si extinderea Sun Plaza" (in Romanian). agendaconstructiilor.ro. 29 June 2016.
- ↑ "Dezvoltatorul Sun Plaza va construi complexul de birouri The Mark, din zona Griviţa: Nu putem începe construcţia proiectului într-o zonă care arată ca un câmp de luptă" (in Romanian). mediafax.ro. 29 June 2016.