Wind Shear Wind Tunnel
In January 2008 Wind Shear, a division of American machine tool builder Haas Automation, completed construction of the wind tunnel. The full scale tunnel is located adjacent to Concord Regional Airport in Concord, North Carolina. The commercial operation was designed for vehicles from stock car, formula one, indy car, drag racing, as well as production car industries.
Wind Shear's tunnel is a closed air circuit, temperature controlled system built around a rolling road. The rolling road, akin to a giant treadmill, is 3 meters wide by 9 meters long and accommodates full size cars. Air and rolling road speeds are coordinated up to 80 metres per second (260 ft/s). Air temperature, critical to repeatable data collection, is maintained at a constant 75 °F (24 °C)), plus or minus one degree. Air is moved through the massive 15,000 sq ft (1,400 m2) air circuit at the maximum rate of 47,500 cu ft (1,350 m3) per second by a 5,100 hp (3,800 kW) motor and 29 carbon fiber blades 22 feet (6.7 m) in diameter. In the wind tunnel industry, size is everything. The blockage effect is the condition where air flow in the wind tunnel is partially blocked by the vehicle. The blockage becomes more critical as the cross section of the test vehicle increases relative to the size of nozzle and airstream. As the vehicle increases in size relative to the nozzle, test data become less reliable as increased blockage affects the quality of the actual windstream. Windshear's solution was to build a sufficiently large air circuit. Nozzle size is a relatively large 180 square feet (16.7 square meters).
See also
References
- Gary Graves (January 23, 2008). "Haas CNC ready to share its new wind-tunnel technology". USA Today. Retrieved 01-03-2009. Check date values in:
|access-date=
(help) - Joel Walters / SAE International Technical Paper (April 16, 2012). "The Windshear Rolling Road Wind Tunnel". SAE International. Retrieved 05-06-2013. Check date values in:
|access-date=
(help)
External links
- "Windshear, Inc. Wind Tunnel - 180-MPH Rolling-Road Wind Tunnel"
- Test SLATE - Automated Test Software by JACOBS Used in the Operation of the Windshear Tunnel