Zhikong Hydro Power Station
Zhikong Hydro Power Station | |
---|---|
Zhikong Hydro Power Station in Maizhokunggar County | |
Location of Zhikong Hydro Power Station in Tibet | |
Official name | Chinese: 直孔水电站 |
Country | China |
Location | Maizhokunggar County, Lhasa, Tibet |
Coordinates | 29°58′6.78″N 91°52′36.55″E / 29.9685500°N 91.8768194°ECoordinates: 29°58′6.78″N 91°52′36.55″E / 29.9685500°N 91.8768194°E |
Purpose | Hydroelectric |
Status | Operational |
Construction began | May 2003 |
Opening date | 23 September 2007 |
Operator(s) | China Huaneng Group |
Dam and spillways | |
Type of dam | Embankment, rock-fill |
Height | 50 metres (160 ft) |
Reservoir | |
Total capacity | 225,000,000 cubic metres (7.9×109 cu ft) |
Normal elevation | 12,660 feet (3,860 m) |
Power station | |
Commission date | 2006-2007 |
Type | Conventional |
Turbines | 4 x 25 MW Francis-type |
Installed capacity | 100 MW |
Annual generation | 407 GWh |
The Zhikong Hydro Power Station (Chinese: 直孔水电站), is a reservoir and power station on the Lhasa River in Maizhokunggar County to the east of Lhasa, Tibet, China. It came into operation in 2007, and has a capacity of 100 MW.
Description
The Zhikong Hydro Power Station lies between the middle and lower reaches of the Lhasa River, also called the Kyi River.[1] It is about 100 kilometres (62 mi) northeast of Lhasa, in Maizhokunggar County.[2][3] It is at an elevation of 12,660 feet (3,860 m) above sea level, downstream from the 160 MW Pangduo Hydro Power Station at 13,390 feet (4,080 m).[4] The Zhikong Dam, a rock-fill dam, is 50 metres (160 ft) tall.[5] It impounds 225,000,000 cubic metres (7.9×109 cu ft) of water.[1] The plant has four 25 MW Francis turbines supplied by Kunming, and is operated by the China Huaneng Group. Installed capacity is 100 MW and annual production is about 407 GWh.[3] The reservoir is also used for flood control and irrigation.[5]
Construction
The Lhasa River Zhi Kong hydroelectric power station was a key project of the tenth five-year plan.[1] Construction began in May 2003, with the No 8 Hydroelectricity Corp of the Armed Police Force responsible for engineering, procurement, and construction.[3] After a fiasco with the Yamdrok Hydropower Station in 1996, 120 kilometres (75 mi) south of Lhasa, the deputy commander of the People's Armed Police construction brigade was placed in charge of the project.[6] Construction cost 1.37 billion yuan. The first generator was commissioned in 2006 and the power station was put into full operation on 23 September 2007.[1][3]
References
Sources
- Buckley, Michael (2014-11-11). Meltdown in Tibet: China's Reckless Destruction of Ecosystems from the Highlands of Tibet to the Deltas of Asia. St. Martin's Press. ISBN 978-1-137-47472-8. Retrieved 2015-02-06.
- "China region completes work on 100-MW Zhikong". HydroWorld. 2007-02-28. Retrieved 2015-02-06.
- "Hydroelectric Power Plants in China - Tibet". Platts UDI World Electric Power Plants Data Base. 2012-10-03. Retrieved 2015-02-06.
- Pletcher, Kenneth (2010-08-15). The Geography of China: Sacred and Historic Places. The Rosen Publishing Group. ISBN 978-1-61530-134-8. Retrieved 2015-02-06.
- Tsering, Bhuchung K. (1996-06-24). "Chinese officials confront failure of yamdrok tso electric project". World Tibet Network News. Retrieved 2015-02-06.
- Zheng, Peng (2007-09-24). "Lhasa River Zhi Kong hydroelectric power station put into operation". China Tibet Information Center. Archived from the original on February 6, 2015. Retrieved 2015-02-06.