8600 series

8600 series

Sets E14+E12+E1 on a combined Ishizuchi and Shiokaze service in March 2016
In service 23 June 2014
Manufacturer Kawasaki Heavy Industries
Built at Kobe
Replaced 2000 series
Constructed 20142015
Number built 14 vehicles (6 sets)
Number in service 4 vehicles (2 sets)
Formation 2/3 cars per set
Fleet numbers E1E2, E11E14
Capacity 101
Operator(s) JR Shikoku
Depot(s) Takamatsu Depot
Line(s) served Yosan Line
Specifications
Car body construction Stainless steel
Car length 20,800 mm (68 ft 3 in)
Width 2,834 mm (9 ft 3.6 in)
Height 3,560 mm (11 ft 8 in)
Floor height 1,105 mm (3 ft 7.5 in)
Doors 2 per side
Maximum speed 130 km/h (80 mph) (service)
140 km/h (85 mph) (design)
Power output 220 kW x 4 per 2-car set
Electric system(s) 1,500 V DC
Current collection method Overhead catenary
Bogies S-DT66 (motored), S-TR66 (trailer)
Track gauge 1,067 mm (3 ft 6 in)

The 8600 series (8600系) is a tilting limited express electric multiple unit (EMU) train type operated by Shikoku Railway Company (JR Shikoku) in Shikoku, Japan, on Ishizuchi limited express services between Takamatsu and Matsuyama since June 2014, replacing ageing 2000 series diesel multiple unit trains.[1] A total of 14 vehicles are scheduled to be delivered by March 2016, replacing all diesel units on the route.[2]

Design

The trains are built by Kawasaki Heavy Industries to a "retro-future" concept, with black front ends intended to evoke images of a steam locomotive.[3] The exterior livery includes orange and green highlights evoking the satsuma oranges and olives for which the region is famous.[2] Each vehicle is built at a cost of approximately 250 million yen, financed partially by national infrastructure investment subsidies.[2] The trains will operate at a maximum speed of 130 km/h (80 mph) in service, although they have a maximum design capability of 140 km/h (85 mph).[3] Tilting capability enables the trains to negotiate curves with a radius of 600 m or more at a speed 30 km/h (20 mph) higher than the limit for conventional non-tilting trains.[3]

Formations

Three-car sets E1 - E2

The three-car sets, numbered E1 and E2, include "Green" car (first class) accommodation in half of one car, and are formed as follows, with one motored car and two non-powered trailer cars.[4]

Designation Mc T Tsc
Numbering 8600 8800 8700
Weight (t) 41.9 32.1 39.0
Capacity 56 68 12 green + 17 ordinary)
Facilities Vending machine, toilets   Green car seating, wheelchair space, toilets

The "Tsc" car is fitted with a single-arm pantograph.[4]

Two-car sets E11 - E14

Two-car set E12 in June 2014

The two-car sets, numbered E11 to E14, are formed with one motored "M" car and one trailer "T" car, as shown below.

Designation Mc Tc
Numbering 8600 8750
Weight (t) 41.9[Note 1] 38.6[Note 2]
Capacity 56 45
Facilities Vending machine, toilets Wheelchair space, toilets

Notes

  1. 41.6 t for pre-series sets E11 and E12
  2. 38.3 t for pre-series sets E11 and E12

The "Tc" car is fitted with a single-arm pantograph.[3]

Interior

Passenger accommodation consists of ordinary-class 2+2 abreast reclining seats with a seat pitch of 980 mm (39 in) and "Green car" (first class) 2+1 abreast reclining seats with a seat pitch of 1,170 mm (46 in).[4] Each seat is provided with an AC power outlet.[3] The "Mc" car has a "Fresh Green" theme with light-green and dark-green seat covers; the "Tc" car has a "Shine Orange" theme, with orange and brown seat covers.[3] The "Tc" car has a wider (900 mm) door for wheelchair accessibility, and includes a wheelchair space and universal access toilet. LED lighting is used throughout.[3]

History

The first two sets, E11 and E12, being delivered in February 2014

The first two pre-series set, E11 and E12, were delivered to Takamatsu Depot from the Kawasaki Heavy Industries factory in Kobe in February 2014.[5] Test running commenced in March.[6] The trains entered service on Ishizuchi limited express services between Takamatsu and Matsuyama on 23 June 2014.[7]

The next four full-production sets (three-car sets E1 and E2 and two-car sets E13 and E14) were delivered from Kawasaki Heavy Industries in October 2015.[8]

References

Wikimedia Commons has media related to JR Shikoku 8600.
  1. 特急形直流電車の新製について [New DC limited express trains to be built]. News release (in Japanese). Japan: Shikoku Railway Company. 25 November 2013. Retrieved 26 November 2013.
  2. 1 2 3 JR四国、21年ぶり電車新造 14年6月に高松―松山間 [JR Shikoku to build new trains for first time in 21 years - In service between Takamatsu and Matsuyama from June 2014]. Nikkei Shimbun (in Japanese). Japan: Nikkei Inc. 26 November 2013. Retrieved 26 November 2013.
  3. 1 2 3 4 5 6 7 8600系量産先行車 [8600 series pre-series trainsets]. Japan Railfan Magazine (in Japanese). Japan: Koyusha Co., Ltd. 54 (637): 57–61. May 2014.
  4. 1 2 3 Yoshimoto, Eisaburo (January 2016). 8600系量産車 [8600 series full-production trainsets]. Japan Railfan Magazine (in Japanese). Japan: Koyusha Co., Ltd. 56 (657): 65–69.
  5. 新型特急車輌8600系甲種輸送される [New 8600 series limited express trains delivered]. RM News (in Japanese). Japan: Neko Publishing Ltd. 27 February 2014. Retrieved 27 February 2014.
  6. "JR四国8600系の試運転が始まる" [JR Shikoku 8600 series test running starts]. Japan Railfan Magazine Online (in Japanese). Japan: Koyusha Co., Ltd. 7 March 2014. Retrieved 21 March 2014.
  7. "JR四国8600系が営業運転を開始" [JR Shikoku 8600 series enters revenue service]. Japan Railfan Magazine Online (in Japanese). Japan: Koyusha Co., Ltd. 24 June 2014. Retrieved 24 June 2014.
  8. JR四国8600系の量産車が出場 [JR Shikoku 8600 series full-production sets delivered]. Japan Railfan Magazine Online (in Japanese). Japan: Koyusha Co., Ltd. 9 October 2015. Retrieved 9 October 2015.

Further reading

This article is issued from Wikipedia - version of the 3/30/2016. The text is available under the Creative Commons Attribution/Share Alike but additional terms may apply for the media files.