Arvida, Quebec

Arvida is a settlement of 12,000 people (2010)[1] in Quebec, Canada, that is part of the City of Saguenay. Its name is derived from the name of its founder, Arthur Vining Davis, president of the Alcoa aluminum company (later Alcan).[1]

Arvida was founded as an industrial city by Alcoa in 1927, when the first aluminum smelter was constructed. Located 240 kilometres (150 mi) north of Quebec City, south of the Saguenay River between Chicoutimi and Jonquière, the town was planned from the first day and was developed as a company town, to have a population of about 14,000 inhabitants, four Catholic parishes, and many other denominations, parishes and schools. It was known as "the City Built in 135 Days" and described by The New York Times as a "model town for working families" on "a North Canada steppe".[1]

Église Ste-Thérèse-de-l'enfant-Jésus

History

Arvida in 1928

In 1912 James B. Duke purchased the rights to the power on the Saguenay River, and in 1925 the Isle Maligne power station near Lac St. Jean came on stream (then the world's largest). In 1926 more than 250 houses were completed and the first ingots were poured. In 1932 Chute-à-Caron power station near Kénogami came on stream. The Shipshaw power station, just below Chute-à-Caron, came on stream during World War II and the Saguenay Inn in Arvida was completed. In 1950 the Arvida Bridge, an arched aluminum bridge, was completed, spanning the old Saguenay gorge near the Shipshaw power house.

Arvida Bridge

During World War II, the smelter was expanded and a large hydroelectric complex was built on the Saguenay River at Shipshaw (1 200 000 HP), becoming the largest aluminum production centre in the Western world.[1] Because of its importance to the Allied war effort, the town was guarded by anti-aircraft batteries.[1] The smelter transforms imported bauxite to alumina, and then to aluminum, by electrolysis. This process, and the smelting plant thereto, employed up to 7,500 people in the 1950s and the 1960s. The plant was due to close in 2005, as it had been replaced by at least three plants constructed during the last ten years in the Saguenay area. Rio Tinto Alcan continues to operate a smelter and related plants in the Arvida area.[1]

In the early 1970s, survivors of the 1971 landslide at nearby Saint-Jean-Vianney were largely resettled to Arvida.

In 1975, the cities of Arvida, Kénogami and Jonquière were amalgamated into a new city, Jonquière. In 2002, this amalgamated Jonquière was merged with Lac-Kénogami, Shipshaw, Chicoutimi, Laterrière, La Baie and Tremblay township into the city of Saguenay.

In 2010, local Councillor Carl Dufour and others sought recognition from Parks Canada as a heritage site, the first step in applying for recognition as a World Heritage Site by UNESCO.[1]

Climate

Climate data for Arvida
Month Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Year
Record high °C (°F) 13.3
(55.9)
13.9
(57)
22.2
(72)
28
(82)
34.4
(93.9)
35
(95)
35.6
(96.1)
35
(95)
33
(91)
27.8
(82)
22.8
(73)
15.6
(60.1)
35.6
(96.1)
Average high °C (°F) −10.3
(13.5)
−8.3
(17.1)
−0.9
(30.4)
7.8
(46)
16
(61)
21.7
(71.1)
24.1
(75.4)
22.2
(72)
16.6
(61.9)
9.8
(49.6)
2
(36)
−6.8
(19.8)
7.8
(46)
Average low °C (°F) −20.1
(−4.2)
−18.2
(−0.8)
−10.8
(12.6)
−1.8
(28.8)
4.4
(39.9)
10.1
(50.2)
13.2
(55.8)
11.9
(53.4)
7.2
(45)
2
(36)
−4.4
(24.1)
−15.2
(4.6)
−1.8
(28.8)
Record low °C (°F) −40
(−40)
−41.7
(−43.1)
−35
(−31)
−19
(−2)
−10
(14)
−1.1
(30)
2.2
(36)
0
(32)
−6.1
(21)
−11.1
(12)
−31.1
(−24)
−41.1
(−42)
−41.7
(−43.1)
Average precipitation mm (inches) n/a n/a 50.3
(1.98)
45.7
(1.799)
75.7
(2.98)
91.7
(3.61)
114.1
(4.492)
97.4
(3.835)
100.4
(3.953)
72.3
(2.846)
73.2
(2.882)
84.7
(3.335)
n/a
Source: 1961-1990 Environment Canada [2]

References

  1. 1 2 3 4 5 6 7 Peritz, Ingrid, "Saguenay 'utopia' dreaming big again", The Globe and Mail, 13 November 2010, p. A31
  2. Environment CanadaCanadian Climate Normals 1961–1990. Retrieved 8 October 2012.

Further reading

Campbell is a good history of the development of aluminum smelting in the Saguenay. Hartwick's more recent book reports on work between 1950 and 68 at Labs in Arvida to develop a new industrial smelting process, the so-called monochloride process.

In 2011, writer Samuel Archibald, raised in Arvida, published a collection of short stories, Arvida, that won several Francophone literary prizes. In 2015, the collection was translated into English by Donald Winkler (Biblioasis Books) and was short-listed for the 2015 Scotiabank Giller Prize.

Coordinates: 48°26′N 71°11′W / 48.433°N 71.183°W / 48.433; -71.183

External links

This article is issued from Wikipedia - version of the 10/24/2016. The text is available under the Creative Commons Attribution/Share Alike but additional terms may apply for the media files.