Bidston railway station

Bidston National Rail

Bidston station in 2007, seen from the footbridge, facing west towards Leasowe
Location
Place Bidston
Local authority Wirral
Grid reference SJ283908
Operations
Station code BID
Managed by Merseyrail
Number of platforms 2
DfT category E
Live arrivals/departures, station information and onward connections
from National Rail Enquiries
Annual rail passenger usage*
2010/11 Increase 0.273 million
– Interchange  Increase 95,081
2011/12 Increase 0.275 million
– Interchange  Increase 0.102 million
2012/13 Decrease 0.265 million
– Interchange  Increase 0.105 million
2013/14 Increase 0.293 million
– Interchange  Decrease 96,850
2014/15 Increase 0.321 million
– Interchange  Decrease 92,814
Passenger Transport Executive
PTE Merseytravel
Zone B1
History
2 July 1866 Opened[1]
4 July 1870 Closed[1]
1 August 1872 Reopened[1]
June 1890 Closed[1]
18 May 1896 Reopened as a junction[1]
1938 Electrified
National Rail – UK railway stations
* Annual estimated passenger usage based on sales of tickets in stated financial year(s) which end or originate at Bidston from Office of Rail and Road statistics. Methodology may vary year on year.
UK Railways portal
Bidston on the Wirral Line

Bidston railway station is a railway station in Bidston, Birkenhead, on the Wirral, England. The station is situated at the junction of the West Kirby branch of the Wirral Line, which is part of the Merseyrail network, and with the Borderlands Line from Wrexham Central, operated by Arriva Trains Wales. Bidston is the northern terminal of the Borderlands Line.

History

British Railways London Midland Region totem sign for Bidston station.

Bidston station has for most of its existence been primarily an interchange point between trains. The station is relatively isolated except for nearby Bidston Village, and was accessed only by foot. Until 1970, the approach road to the station was an unpaved track. Because of its isolation when a through station, the station closed twice due to poor passenger usage. Today there is an adjacent car park at the station. The station's prime function as an interchange still remains today.

The station was originally built by the Hoylake Railway, opening on 2 July 1866 as an intermediate through station on their line from Birkenhead Dock to the east to Hoylake to the west. The Birkenhead Dock terminus was a tramway railway interchange station, with onward journeys to Birkenhead Woodside ferry by horse drawn street trams of the Wirral Tramway. The station first closed on 4 July 1870, reopening on 1 August 1872.[1] In 1878 the Hoylake Railway line was extended to West Kirby on the River Dee coast to the west. In 1888 the line was extended to Birkenhead Park station. Birkenhead Park was an interchange station to Liverpool via the Mersey Railway. The old tramway interchange terminus at Birkenhead Dock station was converted to a goods station.[2]

The station was again closed in June 1890 due to low passenger numbers.[1] The station was permanently reopened on 18 May 1896 as the northern terminus of the new North Wales and Liverpool Railway. The southern terminus was at Hawarden Bridge, which joined onto the Wrexham, Mold and Connah's Quay Railway line to Wrexham Central.[1] In 1898 Bidston ceased to be a terminus station with the line extended to Seacombe in Wallasey. Bidston became a passenger interchange station.[3]

The station in 1961, facing towards Leasowe. The lines to the sidings and engine shed are in front of the signals to the left. Bidston Dee Junction signal box is behind the platform.

Through trains to Liverpool commenced in 1938 when the London Midland and Scottish Railway electrified the line from Birkenhead Park to West Kirby. During the earlier half of the twentieth century, Bidston station was known as Bidston Dee Junction and was a busy interchange between the Wirral line electric services and the Seacombe to Wrexham and Chester Northgate steam trains. In 1960 the Wrexham service changed to diesel trains. At the same time the northern terminus of the line was diverted further north to terminate at New Brighton due to the closure of Seacombe station. The section of line from Bidston to New Brighton was closed in 1971 due to poor passenger use with the line from Wrexham terminating at Birkenhead North.[4] However it was subsequently cut back to Bidston and again the station became a terminus on the Borderlands Line in October 1978[5] and this remains the situation today.

The section of curve between Bidston West and North Junctions, on the wye to the east of the station, was severed on 28 November 1983. This removed the direct route to New Brighton for passengers, and Bidston Dock for freight.[1]

Signal boxes

Bidston had four signal boxes in 1899.[6] These signal boxes were situated alongside the Dee, West, East and North junctions. The nearest to the station was the Bidston Dee Junction box.[6] The second Dee Junction signal box was built in the 1930s by the London, Midland and Scottish Railway, and was much larger than the earlier signal box which had been built by the Wirral Railway.[7] This signal box had a 65-lever frame and also took over the operation of Bidston North Junction, when built.[7] Bidston Dee Junction signal box was closed on 17 September 1994,[8] and demolished two months later on 20 November.[7]

Engine shed and freight use

Bidston station had a nearby engine shed, shed code 6F,[9] which principally operated the Wrexham line. The building was somewhat south of the running lines, halfway between Bidston and Birkenhead North stations.[5][1][6] The shed was built by the Manchester, Sheffield and Lincolnshire Railway in 1897 and had two tracks inside.[9] The shed had a water tank and a coaling stage for steam locomotives. Examples of locomotives, which could be found at the shed, included the LNER Class J94 Austerity, which was used around the Birkenhead docks, and the BR Standard Class 9F, which hauled iron ore trains from Bidston Dock to the John Summers steelworks in Shotton.[9] The engine shed closed on 11 February 1963, along with transfer of its allocation of locomotives to Birkenhead Mollington Street depot.[10] The shed remained intact for several years after closure.[10]

Several sidings were situated adjacent to the eastern side of the station, south of the running lines.[1][6][11] These sidings had been built prior to 1899,[6] and were removed after goods traffic ended on 29 July 1968.[12] A Tesco supermarket now occupies the site of these sidings.

The station was the nearest to the former Bidston Dock. The adjacent Bidston East Junction gives access to the former Birkenhead Dock Branch line, but this has been disused by freight workings since the mid-1980s and is still so at present.[13]

Facilities

The station has a booking office, and a 19-space car park. Each side of the island platform can receive six carriages.[14] The station is staffed at all times during opening hours, and has platform CCTV. Each platform has open-air seating. There is a payphone, next to the ticket office, on platform 1.[15] The station provides a "Park and Ride" service. There are a further 198 car parking spaces,[16] which are free to use for travellers, with lighting columns and CCTV to meet Merseytravel's Travelsafe requirements. Construction of the new car park was completed in 2010. As yet, there is no access, to the platform, for passengers with wheelchairs or prams, as access is by staircase only. Platform access has not been modernised to the standard of that at Hooton.

In early 2014 a new waiting shelter opened which includes a new ticket office, new seating and a new toilet.

On 3 August 2015, a new Bike & Go shelter opened at the station.[17]

Services

Bidston railway station sign
An Arriva Trains Wales service, waiting to depart from platform 2. The platform is also used by Merseyrail services to West Kirby

Currently, services run every 15 minutes (Monday to Saturday daytime) to West Kirby & Liverpool,[18] and every hour to Wrexham. Services to and from Wrexham usually terminate/start from platform 2, which is also used by West Kirby trains. Liverpool-bound trains use platform 1.

During the evenings, trains operate every 30 minutes to West Kirby & Liverpool and every two hours to Wrexham (all day on Bank Holidays), with an approximately 2.5 hourly service (six departures total) on Sundays.[19]

Merseyrail services are provided by Merseyrail's fleet of Class 507 and Class 508 EMUs. Services to Wrexham are usually provided by an Arriva Trains Wales, double-carriage, Class 150/2 "Sprinter" DMU. Though, in the past, services have been provided with an Arriva Trains Wales, single-carriage, Class 153 "Super Sprinter" DMU.

Future

Proposals have been made to electrify some or all of the Borderlands Line and possibly incorporate it into the Wirral Line services, but no commitment has been made.[20]

Gallery

References

Sources

External links

Wikimedia Commons has media related to Bidston railway station.
Preceding station National Rail Following station
Leasowe
towards West Kirby
  Merseyrail
Wirral Line
  Birkenhead North
towards Liverpool Central
Upton   Arriva Trains Wales
Borderlands Line
  Terminus
Disused railways
Liscard and Poulton   Wirral Railway
Seacombe Branch
  Terminus

Coordinates: 53°24′32″N 3°04′44″W / 53.409°N 3.079°W / 53.409; -3.079

This article is issued from Wikipedia - version of the 9/7/2016. The text is available under the Creative Commons Attribution/Share Alike but additional terms may apply for the media files.