EastLink (Melbourne)

EastLink
Victoria
Coordinates 37°49′48″S 145°13′03.47″E / 37.83000°S 145.2176306°E / -37.83000; 145.2176306Coordinates: 37°49′48″S 145°13′03.47″E / 37.83000°S 145.2176306°E / -37.83000; 145.2176306
General information
Type Freeway
Location Melbourne
Length 39 km (24 mi)
Maintained by ConnectEast
History Completed 29 June 2008
Route number(s)
  • M3 (2008–present)
  • Entire Route
Major junctions
North end
 
South end
Location(s)
Major suburbs / towns
Highway system
Highways in Australia
National HighwayFreeways in Australia
Highways in Victoria

  • Infobox instructions
  • guidelines
  • examples
  • talk

EastLink is a tolled section of the M3 freeway linking a large area through the eastern and south-eastern suburbs of Melbourne, Australia.[1] It is a part of Melbourne's Metropolitan Ring Road project.

EastLink is electronically tolled with no cash booths, using a system developed by SICE. The SICE Tolling System is similar to (and interoperable with) the e-TAG system used on the CityLink tollway. EastLink was opened to traffic on Sunday 29 June 2008 and in conjunction with the opening, a month-long toll-free period occurred before regular tolling commenced on 27 July 2008.[2]

The project was constructed by a joint venture of Australian construction companies Thiess and John Holland,[3] with tolling system contracted to SICE, and mechanical and electrical work contracted to United Group Infrastructure.[4] The final project cost was A$2.5 billion.

Signs are at the entrances and on the tollway direct to Ringwood, Dandenong, Frankston and Doncaster.

History

Construction of EastLink over Boronia Road in Wantirna

The road was originally shown in the 1969 Melbourne Transportation Plan as the F35 Freeway.

The freeway has been a contentious issue, amid concerns over environmental damage and the possibility it would lead to a 'complete' metropolitan ring road. In October 1999 the Bracks Government announced that the freeway (which Labor had not promised at the election) had been scrapped. Instead the government promised to investigate a preferred route for the Rowville railway line and extend the 75 tram to Knox, of which neither have been fulfilled.[5] However, in 'major policy about-face' the Bracks Government announced in August 2000 that they would seek federal funding for the freeway.[6] To obtain funding the freeway would need to be classified as a road of 'national importance', despite the fact that it did not form part of the national highway grid. The 'U-turn' on the freeway was strongly criticised by opponents such as the Public Transport Users Association as it would result in public transport alternatives such as the Rowville railway line being scrapped.[7]

In 2001, University of Melbourne academic Paul Mees launched legal action in the Federal Court seeking an injunction under section 475 of the Environment Protection and Biodiversity Conservation Act 1999 to prevent Transport Minister Peter Batchelor and the Roads Corporation (VicRoads) from "taking any further action relating to the construction of the Scoresby freeway or the Eastern Ring Road". He alleged that the freeway would threaten migratory birds, plant species and wetlands and that the freeway was part of a larger plan to build a metropolitan ring road to Greensborough.[8] In light of the court case, state government bureaucrats removed references to the metropolitan ring road from a draft Metropolitan Strategy.[9]

In 2003, the Southern and Eastern Integrated Transport Authority (SEITA) was established by the Victorian Government, to manage and oversee the project on behalf of the government. SEITA was responsible for managing the process of selecting a private sector bidder.[3]

In October 2004, SEITA awarded the contract for the design, construction, and operation of EastLink to ConnectEast, a company that was publicly listed on the ASX in November 2004. ConnectEast subsequently contracted Thiess John Holland, a group formed by the partnership of two major construction companies, to carry out the detailed design and construction of EastLink.[3]

ConnectEast, as owner of the road, is now responsible for its day-to-day management, until the concession deed expires in [(a period of 39 years). EastLink's construction began in March 2005, and the road opened on 29 June 2008

On 27 February 2008, it was announced that the EastLink / Monash Freeway interchange would be named the "Tom Wills Interchange", after the founder of Australian rules football Tom Wills.[10] On 24 March 2008 Tim Pallas announced that the twin tunnels would be named 'Melba' and 'Mullum Mullum', in the inbound and outbound direction, respectively.[11]

The opening of the road on 29 June 2008 saw traffic on nearby Stud, Springvale and Blackburn Roads drop by 30% to 40%,[12] but traffic on the Eastern Freeway rose by 5 per cent at the Burke Road intersection, and by about 1–2 per cent at Hoddle Street in the city.[13] On average 270,868 cars, trucks and motorbikes travelled on the road every day until the tolling was introduced on 23 July.[14] In the first week after the introduction of tolls, the average number of daily trips fell to 133,722. This was in line with estimates of a 40 to 50 per cent decline, but is a third below prospectus forecasts. The average toll per trip was $3.10 – above the estimates of $2.91.[14]

In its first six months of operation, Eastlink made a loss of almost $93 million.[15] In 2010 the road had to be refinanced with its traffic forecasts rewritten due to lower than expected traffic volumes.[16]

Naming history

Over the years the project was variously referred to as the Eastern Ring Road, Scoresby Freeway, Scoresby Bypass, and Mitcham-Frankston Freeway.

On 23 March 2005, with the beginning of construction on the project, then Premier Steve Bracks announced that the road would be called EastLink, at a ceremony in Rowville.[17] The new name was reportedly chosen because it is easier to say and apparently easier to remember and fit on the street directories.

On 27 February 2008, it was announced that the EastLink / Monash Freeway interchange would be named the "Tom Wills Interchange", after the founder of Australian rules football Tom Wills.[10]

On 24 March 2008 Tim Pallas announced that the twin tunnels would be named 'Melba' and 'Mullum Mullum', in the inbound and outbound direction, respectively.[11]

Route

EastLink begins at the eastern end of the Eastern Freeway at Springvale Road in Nunawading, before tunnelling eastward towards Ringwood under the Mullum Mullum Creek area. It then travels 40 km south towards Frankston, passing through the suburbs of Wantirna, Wantirna South, Scoresby, Rowville, Mulgrave, Dandenong North, Noble Park, Keysborough, Dandenong South, Bangholme, and Carrum Downs, before ending at the northern end of the Frankston Freeway.[18] The majority of the freeway has three lanes running in each direction, while between Thompson Rd and Frankston Freeway, there are 2 lanes running in each direction.[19]

The standard travel time on EastLink in both directions, is 26 minutes. (12 minutes between Frankston Freeway / Peninsula Link and the Monash Freeway, 7 minutes between the Monash Freeway and the Burwood Highway and 7 minutes between the Burwood Highway and Springvale Road. Typical travel time is between 30–40 minutes.

EastLink does not regularly have peak period congestion like other urban metropolitan freeways in Melbourne. However, delays can be experienced following roadworks or they might be residual, following an incident. Occasionally, traffic congestion occurs between Thompsons Road and the junction with the other three freeways in Carrum Downs, where the freeway changes from three to two lanes. If the congestion builds, the travel time can reach 40 minutes or beyond.

Exits and interchanges

LGALocationkmmiDestinationsNotes
WhitehorseManningham boundaryNunawadingDonvale boundary0.0–
1.0
0.0–
0.62
Eastern Freeway (M3) / Springvale Road (State Route 40) Melbourne, Donvale, NunawadingNorthern terminus at single point urban interchange; continues west as Eastern Freeway
ManninghamDonvale2.3–
4.0
1.4–
2.5
Melba Tunnel northbound / Mullum Mullum Tunnel southbound
MaroondahRingwood4.1–
5.6
2.5–
3.5
Ringwood Bypass (State Route 62)  Ringwood, LilydaleSemi-directional T interchange; northbound exit via Maroondah Highway exit ramp
Maroondah Highway (State Route 34)  Ringwood, Lilydale, Box Hill, MitchamDiamond interchange; northbound exit to Maroondah Highway westbound only
6.3–
7.1
3.9–
4.4
Canterbury Road (State Route 32) Melbourne, Montrose
KnoxWantirna7.8–
8.7
4.8–
5.4
Boronia Road (State Route 36)  Boronia, Vermont
Wantirna–Wantirna South boundary9.5–
10.4
5.9–
6.5
Burwood Highway (State Route 26) Melbourne, Ferntree Gully
Wantirna South11.2–
11.1
7.0–
6.9
High Street Road (State Route 24) Melbourne, Ferntree Gully
Scoresby14.2–
15.1
8.8–
9.4
Ferntree Gully Road (State Route 22)  Ferntree Gully, Oakleigh
15.7–
16.3
9.8–
10.1
Dalmore Drive / Eastlink Outbound BP Service CentreSouthbound exit and entry only
Eastlink Inbound BP Service CentreNorthbound exit and entry only
Rowville16.7–
17.6
10.4–
10.9
Wellington Road (State Route 18)  Mulgrave, Rowville
MonashMulgrave18.311.4 Police Road (State Route 16 west)  Springvale, DandenongSouthbound exit and northbound entrance
Greater DandenongDandenong North18.7–
20.1
11.6–
12.5
Monash Freeway (M1) Melbourne, Warragul, Melbourne AirportTom Wills Interchange; no northbound exit to M1 south-eastbound, no southbound entry from M1 north-westbound
18.711.6 Police Road (State Route 16 west)  Springvale, DandenongNorthbound exit only, via Monash Freeway exit ramp
Dandenong North–DandenongNoble ParkNoble Park North quadripoint21.6–
22.6
13.4–
14.0
Princes Highway (Alternate National Route 1) Melbourne, Dandenong
Keysborough24.515.2 Cheltenham Road (State Route 10)  Mentone, DandenongSouthbound exit and northbound entrance
25.5–
26.3
15.8–
16.3
Dandenong Bypass (State Route 49)  Keysborough, Dandenong South
26.7–
27.6
16.6–
17.1
Greens Road (State Route 12)  Mordialloc, Narre Warren
FrankstonCarrum Downs33.2–
34.1
20.6–
21.2
Thompson Road (State Route 6)  Patterson Lakes, Cranbourne
36.822.9 Peninsula Link (M11)  PortseaSouthbound exit to M11 south-eastbound, northbound entrance from M11 north-westbound
Seaford37.923.5 Frankston Freeway (M3) / Rutherford Road  FrankstonSouthern terminus: continues as Frankston Freeway; southbound exit to and northbound entrance from Rutherford Road

Dandenong Bypass

Main article: Dandenong Bypass

A 4.8 km section of the Dingley Freeway called the Dandenong Bypass (also referred to as the Dandenong Southern Bypass during its construction) was built by ConnectEast and Thiess John Holland as part of the EastLink project.[20] The bypass opened on 9 December 2007.[21]

Tolling

Ringwood portal of the tunnels under the Mullum Mullum Valley

EastLink is electronically tolled via a system commercially called Breeze, entirely provided by SICE, Spanish system integrator company with broad experience in the tolling market. This system is fully interoperable with all other tollways in Australia, including the Transurban e-TAG system used on CityLink.[22]

The system features a uniquely designed electronic vehicle tag, the "Breeze Tag", which is about half the size of the standard design of e-TAG. The Breeze system is provided by Spanish company SICE,[23] with the Road Side Equipment, including the Breeze Tags, provided by Swedish firm Kapsch TrafficCom AB, under the PREMID brand of DSRC products.[24]

Tolls on EastLink can be charged in three different ways:

If a driver travels on EastLink without taking any of the three actions above to pay for the toll(s) either prior to, or within three days after travel, an invoice for cost of the toll(s) plus an account processing fee will be sent to the registered vehicle's owner. If the toll invoice is not paid, an overdue notice (with an additional processing fee) is issued. If the invoice is still not paid, a fine is issued by Victoria Police.[28]

Prices and discounts

Inside the Melba (westbound) tunnel

Prices for the use of the tollway vary between sections. For cars, a one way trip between two consecutive interchanges starts from 34c for sections between Maroondah Highway and High Street Road, slightly more for the longer sections near the south of the tollway, right up to a one way trip through the tunnel section between Maroondah Highway / Ringwood Bypass and Springvale Road which costs $2.37. Lower rates apply to motorcycles while higher rates apply for some four wheel drives, some utility vehicles, buses and trucks.[29]

Discounts are also offered to car drivers. A 20 per cent discount applies to the cost of any trip(s) taken on a Saturday or Sunday and also to one way trips between two consecutive interchanges (excluding the tunnels) on weekdays. At any time, cars will not be charged more than $5.94 for a one way trip on EastLink.[29]

Traffic impact on surrounding roads

Whilst the construction of Eastlink alleviated congestion on Springvale Road, it has had the effect of funnelling the traffic onto other roads, particularly increasing traffic on the Eastern Freeway. Many local councils, organisation, community groups and individuals expressed concerns throughout the proposal and construction phases, over the alterations to traffic patterns and flows and how Eastlink would impact upon local roads in their respective areas. In 2009, the City of Manningham was able to conduct a traffic report which found that:[30]

Another study conducted by Banyule Council showed that, since EastLink opened in June 2008, 800 more trucks a day use main roads in Heidelberg and Rosanna.

In general, it appears as though Eastlink has funnelled large amounts of traffic onto the Eastern Freeway and has attracted an increase in commuters using arterial roads in local areas. Decreases appear to be on small stretches of local roads where Eastlink provides a quicker alternative.

Shared path

The EastLink Trail is a shared walking and cycle path that follows a similar North/South route to the EastLink project. Using it, cyclists and pedestrians are able to cycle or walk most of the distance of the road, along a 3-metre wide dedicated concrete path. Many major roads are crossed via under or over passes. Some roads, such as High Street Road (and until November 2009, Burwood Highway), require crossing the road at grade.[31]

In wet weather, two underpasses are not trafficable as they have been built on floodways. These are the Ferntree Gully Road underpass and the Wellington Road underpass. After a medium amount of rain the underpasses flood and trail users must cross over the major roads to continue along the path. This can prove dangerous and during peak traffic times, trail users are known to have waited up to 20 minutes to safely cross the roads when the underpasses have flooded.

The Eastlink trail stops in Dandenong and does not continue. Users may take the Dandenong Creek Trail from this point which will take them to Carrum, where they will be able to join the under construction Peninsula Link trail to Frankston and when completed, Mornington.

For those using the trail, substantial deviations from EastLink must be taken into account in travel times as the shared path does not follow the freeway in many cases as existing trails were joined up to the trails specifically built during the construction of the road. This has led to some very twisty sections of trail and in some cases, detours of over 3 km from the EastLink.

A panoramic view of EastLink looking north from the Heatherton Road bridge.

Accidents

On 18 February 2010, at 3.15 pm, a semi-trailer lost control on the north-bound side of the tollway, 300m from the Wellington Rd exit. The truck crossed the road and crashed through the median safety barrier, before crashing into a large pylon holding up a road sign gantry. The truck exploded into flames and the driver was killed. The tollway was closed in both directions, the first time since the road opened, between the Monash Freeway and Ferntree Gully Road. It remained closed until the early hours of the following morning so police could conduct an investigation and ConnectEast could carry out repairs to make the road safe to reopen. The police report is yet to be finalised.

Controversies

Maroondah Highway bridge, Ringwood looking towards the railway bridge
EastLink looking south from the Koomba Road footbridge before opening.
The EastLink Operations Centre in Ringwood during construction.
Night-shot of overpass spanning Eastlink, near the Burwood Rd exit.

Environmental issues

Constructing the EastLink bridge over Dandenong Creek, in Ringwood/Wantirna

Many environmental groups in Melbourne's east and south-east objected to the project, due to a number of factors, including vehicle emissions and disruption of habitat (in places such as the Mullum Mullum Valley and Dandenong Valley Wetlands). However, the road was the subject of an extensive Environmental Effects Statement (June 1998), which was followed by an extensive public hearing process in April 1999 before the final Government decision to proceed. The statement predicted an 18.5per cent increase in carbon dioxide, impacts on groundwater and wetlands, high impacts on areas of conservation value and the potential to affect 38 species of rare or threatened fauna and flora if the freeway was built.[8]

According to EastLink's builders, the road will relieve traffic congestion throughout Melbourne's eastern and south-eastern suburbs, resulting in more efficient traffic flow, therefore reducing fuel consumption and exhaust output.[33]

During the planning phase (then a VicRoads project), a large debate surrounding damage to the Mullum Mullum Valley occurred. A number of options for the path of the road through the valley were considered. The option chosen – for two 1.6 km tunnels – was the second-to-most expensive, and the second-to-most environmentally friendly.[34] Other options considered in planning included a surface road for the entire length, much shorter tunnels, and slightly longer tunnels.

However, despite the attention on tunneling beneath the Mullum Mullum Gorge, the Ringwood Interchange is entirely above-ground and has resulted in relocation of the creek through this area.

See also

References

  1. 1 2 3 "Who's involved?". Southern and Eastern Integrated Transport Authority. Archived from the original on 1 June 2008. Retrieved 26 June 2008.
  2. Woodberry, Trent (12 December 2006). "EastLink: – Commencement of mechanical and electrical work by United Group Ltd" (PDF). Thiess John Holland. Archived from the original (PDF) on 25 July 2008. Retrieved 26 June 2008.
  3. Das, Sushi (8 August 2000). "Scoresby Freeway Back on Agenda". The Age. p. 3.
  4. Das, Sushi (21 August 2000). "Anger at U-turn on Scoresby Freeway". The Age. p. 3.
  5. 1 2 Heasley, Andrew (27 October 2001). "Scoresby Freeway Faces Hurdle". The Age. p. 13.
  6. Heasley, Andrew (31 October 2002). "Ring road plan altered before case". The Age. p. 6.
  7. 1 2 EastLink interchange honours one of football's founders SEITA. 27 February 2008. Retrieved 26 March 2008.
  8. 1 2 Pilcher, Georgie (24 March 2008). "East Link Twin Tunnels named as Melba and Mullum Mullum". Herald Sun. Australian Associated Press.
  9. Julia Milesi (30 June 2008). "No delays as EastLink tollway cuts traffic". The Age. Retrieved 17 August 2008.
  10. Ashley Gardiner (1 July 2008). "Traffic on surrounding roads plummets after EastLink opens". Herald Sun. news.com.au. Archived from the original on 3 August 2008. Retrieved 17 August 2008.
  11. 1 2 Beveridge, John (8 August 2008). "Road fees take a toll". Herald Sun. news.com.au. Retrieved 17 August 2008.
  12. Silkstone, Dan (24 March 2005). "Naming and blaming launches tollway". The Age. p. 10.
  13. "Dandenong Bypass". Southern and Eastern Integrated Transport Authority. Archived from the original on 19 July 2008. Retrieved 26 June 2008.
  14. EastLink tollway to open six months early Herald Sun 10 December 2007. Retrieved 12 December 2007.
  15. "Breeze – Products". ConnectEast. Retrieved 26 June 2008.
  16. "Kapsch awarded new prestigious contract in Australia" (PDF). Kapsch TrafficCom AB. 2 September 2005. Retrieved 26 June 2008.
  17. "Breeze – Tag account". ConnectEast. Retrieved 26 June 2008.
  18. "Breeze – Non-tag account". ConnectEast. Retrieved 26 June 2008.
  19. "Breeze – EastLink trip pass". ConnectEast. Retrieved 26 June 2008.
  20. "Breeze – Toll invoice". ConnectEast. Retrieved 26 June 2008.
  21. City of Manningham, traffic report on the effects, alterations and impacts of Eastlink to surrounding and local roads in the City of Manningham, 2009.
  22. "Chaos after EastLink bungle". Herald Sun. 28 August 2006. pp. Internet Article. |first1= missing |last1= in Authors list (help)
  23. Gardiner, John (March 2006). "In the Headlights". EastLink News. ConnectEast. p. 2. Vehicles travelling at reasonably consistentspeeds use less fuel ... emissions are all reduced by betterand more consistent speeds.
  24. Costa, Gabrielle (14 October 2000). "Government compromises on freeway". The Age. p. 4.

External links

Other links

This article is issued from Wikipedia - version of the 10/8/2016. The text is available under the Creative Commons Attribution/Share Alike but additional terms may apply for the media files.