Girvan railway station
Girvan | |
---|---|
The exterior of Girvan station | |
Location | |
Place | Girvan |
Local authority | South Ayrshire |
Coordinates | 55°14′47″N 4°50′54″W / 55.2463°N 4.8482°WCoordinates: 55°14′47″N 4°50′54″W / 55.2463°N 4.8482°W |
Grid reference | NX190983 |
Operations | |
Station code | GIR |
Managed by | Abellio ScotRail |
Owned by | Network Rail |
Number of platforms | 2 |
Live arrivals/departures, station information and onward connections from National Rail Enquiries | |
Annual rail passenger usage* | |
2002/03 | 96,529 |
2004/05 | 99,242 |
2005/06 | 0.106 million |
2006/07 | 0.104 million |
2007/08 | 0.101 million |
2008/09 | 0.110 million |
2009/10 | 0.111 million |
2010/11 | 0.114 million |
2011/12 | 0.124 million |
2012/13 | 0.134 million |
2013/14 | 0.138 million |
Passenger Transport Executive | |
PTE | SPT |
History | |
5 October 1877 | Opened as Girvan New |
1 April 1893 | Renamed as Girvan |
National Rail – UK railway stations | |
* Annual estimated passenger usage based on sales of tickets in stated financial year(s) which end or originate at Girvan from Office of Rail and Road statistics. Methodology may vary year on year. | |
UK Railways portal |
Girvan railway station is a railway station serving the town of Girvan, South Ayrshire, Scotland. The station is managed by Abellio ScotRail, who operate all passenger services from there. It is on the Ayr to Stranraer section of the Glasgow South Western Line and is situated 62 miles (99 km) south of Glasgow Central. It has two platforms and is the location of one of the five passing loops on the single track line between Dalrymple Junction (south of Ayr) and Stranraer. Immediately south of the station, the line climbs steeply towards Pinmore tunnel - the climb is known as the Glendoune Bank and has a ruling gradient of 1 in 54.
History
The station was opened on 5 October 1877 by the Girvan and Portpatrick Junction Railway and was known as Girvan New,[1] replacing the Girvan (Old) terminus station of the Maybole and Girvan Railway situated nearby. The station closed on 7 February 1882, reopened 1 August 1883, closed 12 April 1886, reopened 18 June 1886, closed again 2 September 1886, reopened 14 July 1890, and was renamed Girvan on 1 April 1893[1] after rebuilding by the Glasgow and South Western Railway, who had taken over the G&PJR the previous year. From 1906-1942, it also served as the southern terminus of the Maidens and Dunure Light Railway.
The main station building caught fire in January 1946 and because the LMS were not disposed to finance the rebuilding costs as nationalisation was imminent. Rebuilding did not commence until 1949. Owing to shortage of materials it was not completed until August 1951, when based on a typical 1930s LMS design it was re-opened. Along with the signal box, it is a category B listed structure. The station clock restored in 2009 is believed to be from the original station building.
The station is part of the Carrick & Wigtownshire Community Rail Partnership SAYLSA (The Stranraer to Ayr Line Support Association) which comprises local Community Councils, representation from South Ayrshire Council, ScotRail as well as private individuals. SAYLSA has adopted the station and has provided tubs, shrubs and plants. These are tended to by the Girvan Make it Happen Group. SAYLSA also have their community shop and an office on site.
The station was the rail head for the 2009 UK Open Golf Championships.
Services
All trains on the Ayr to Stranraer route call, along with several to/from Ayr and beyond start or terminate here.
December 2014
There are fifteen northbound trains at an approximately hourly frequency northbound to Ayr, with the majority extended to Kilmarnock. There are five daily trains to Glasgow Central, four of which go via Kilwinning and the other via Kilmarnock. There are six services to Stranraer. The Sunday service consists of three services in each direction between Glasgow and Stranraer via Kilwinning.
December 2015
From the start of the December 2015 timetable, a number of changes to the service pattern have been implemented. There are now nineteen trains to Ayr (still on a basic hourly frequency with peak extras) and nine trains to Stranraer (one every two hours compared to the six that ran previously on an irregular frequency). Ten of the Ayr trains continue to Kilmarnock. However through trains to Glasgow via Kilwinning have been withdrawn and there are now just two to Glasgow via Kilmarnock (with four running the other way). On Sundays there are five trains each to Ayr & Stranraer.[2]
Preceding station | National Rail | Following station | ||
---|---|---|---|---|
Barrhill | Abellio ScotRail Glasgow South Western Line |
Maybole | ||
Historical railways | ||||
Junction with G&PJR |
Glasgow and South Western Railway Maidens and Dunure Light Railway |
Turnberry Line closed, station closed | ||
Connection with G&PJR |
Glasgow and South Western Railway Maybole and Girvan Railway |
Grangeston Halt Line open, station closed | ||
Pinmore Line open, station closed |
Glasgow and South Western Railway Girvan and Portpatrick Junction Railway |
Connection with M&GR |
References
Notes
- 1 2 Butt, page 103
- ↑ Scotrail timetables Stranraer/Girvan/Ayr – Kilmarnock – Glasgow and Ayr/Largs/Ardrossan – GlasgowScotrail website; Retrieved 12 December 2015
Sources
- Butt, R. V. J. (1995). The Directory of Railway Stations: details every public and private passenger station, halt, platform and stopping place, past and present (1st ed.). Sparkford: Patrick Stephens Ltd. ISBN 1-8526-0508-1. OCLC 60251199.
- Jowett, Alan (March 1989). Jowett's Railway Atlas of Great Britain and Ireland: From Pre-Grouping to the Present Day (1st ed.). Sparkford: Patrick Stephens Ltd. ISBN 1-8526-0086-1. OCLC 22311137.
Wikimedia Commons has media related to Girvan railway station. |