Infrastructure of Singapore Changi Airport

Panoramic view from Changi Airport Terminal 1 – Gate 5.
Infrastructure[1]
Taxiways
Length 25,300 m (83,000 ft)
Width 30 m (98 ft)
Passenger terminal buildings
Total
Floor area 1,046,000 m2 (11,260,000 sq ft)
Handling capacity 66 million passengers
Parking bays 92 (aerobridge)
42 (remote)
Terminal One
Opened 1 July 1981 (operational)
29 December 1981 (official)
Floor area 308,000 m2 (3,320,000 sq ft)
Handling capacity 21 million passengers
Parking bays 29 (aerobridge)
16 (remote)
Terminal Two
Opened 22 November 1990 (operational)
1 June 1991 (official)
Floor area 358,000 m2 (3,850,000 sq ft)
Handling capacity 23 million passengers
Parking bays 35 (aerobridge)
11 (remote)
Former Budget Terminal
Opened 26 March 2006 (operational)
31 October 2006 (official)
Closed 25 September 2011
Floor area 28,200 m2 (304,000 sq ft)
Handling capacity 7 million passengers
Parking bays 10 (contact)
JetQuay (CIP Terminal)
Opened 15 August 2006 (operational)
29 September 2006 (official)
Floor area 2,000 m2 (22,000 sq ft)
Handling capacity N/A
Parking bays 0
Terminal Three
Opened 9 January 2008 (operational)
25 July 2008 (official)
Floor area 380,000 m2 (4,100,000 sq ft)
Handling capacity 22 million passengers
Parking bays 28 (aerobridge)
15 (remote)
Terminal Four
Opened Q4 2017
Floor area 195,000 m2 (2,100,000 sq ft)
Handling capacity 16 million passengers
Parking bays 25 (aerobridge)
Terminal Five[2][3]
Target Opening Date Mid-2020s
Floor area TBC
Handling capacity 30–50 million passengers
Parking bays TBC
Jewel Changi Airport[4][5]
Target Opening Date Q1 2019
Floor area 35,000 m2 (380,000 sq ft)
Handling capacity N/A
Car Parking Spaces 2,500

This article delineates the infrastructure comprising the Singapore Changi Airport, the main airport in Singapore, and a major aviation hub in Southeast Asia. The airport is located approximately 17.2 km (10.7 mi) northeast[6] from the commercial centre in Changi, on a 13 square kilometres (5.0 sq mi) site.

Background

Given limited land resources in Singapore, Singapore Changi Airport was designed for both current and future needs as the country's primary airport. The airport was designed to be capable of doubling in size using reclaimed land with enough space for two more runways and at least two new passenger terminal buildings.

The master plan for the existing airport initially involved a dual-terminal and dual-runway configuration over two phases with provisions for another two passenger terminals in the near future. Phase 1 included the construction for the first passenger terminal, the first runway, 45 aircraft parking bays, support facilities and structures, including a large maintenance hangar, the first fire station, workshops and administrative offices, an airfreight complex, two cargo agents' buildings, in-flight catering kitchens and a 80 m (260 ft) control tower,.[7] Construction for the second phase would commence immediately after the completion of Phase 1 and include the second runway, 23 additional aircraft parking bays, a second fire station and a third cargo agents' building.

Changi Airport Control Tower

Changi Control Tower.

The Air traffic control tower (ATC) was constructed as part of Phase One of the Changi Airport redevelopment plan. The iconic tower is situated between Changi International Airport 2 runways and stands at about 81 m Above Mean Sea Level (AMSL). It provides aerodrome control service to aircraft landing and departing Changi Airport and aircraft maneuvering within the airport.[8]

Runways

Changi Airport has two parallel runways, 02L/20R and 02C/20C, each 4,000 by 60 m (13,123 by 197 ft).[6] 02L/20R was completed and opened in 1981 as part of the airport's first phase. It has a displaced threshold of 740 m (2,428 ft) leaving the rest of the runway at 3,260 m (10,696 ft) long.[6] 02C/20C, formerly 02R/20L, was built completely on reclaimed land and opened with phase 2, 1.6 km (0.99 mi) to the east of 02L/20R. Four instrument landing systems (ILS) are installed on the two runways to guide landing aircraft safely under all weather conditions. Both runways are also used by the Republic of Singapore Air Force as part of Changi Airbase.

A new parallel runway 02R/20L (named 01/19 when opened in 2004) was built 1.8 km (1.1 mi) to the east of 02C/20C, currently used only by Republic of Singapore Air Force aircraft as part of Changi Airbase (East). The existing Runway 3, currently used by the military, will be extended from 2.75 km to 4 km to handle larger passenger aircraft. Almost 40 km of new taxiways will also be built to connect the runway with the current airport. New facilities such as navigation aids, airfield lighting systems and a fire station will need to be built as well.[9]

Runway Informations, Radio Navigations & Landing Aids [10][11][12]
Runway Name Runway Direction Magnetic Heading Type of Surface Length (m) Width (m) Instrument Landing System
Name
(IDENT)
Frequencies (MHz) ILS categories for precision approach and landing Users
Land Depart
Instrument Landing System Localizer
(ILS-LLZ)
Instrument Landing System Glide Path
(ILS-GP)
Instrument Landing System Distance Measuring Equipment
(ILS-DME)
Commercial Military
02L/20R 02L 023.02° Bituminous Concrete 4,000 4,000 60 ICW 110.90 330.80 CH46X CAT II Green tick Green tick
20R 203.02° 3,260 ICH 108.90 329.30 CH26X CAT I
02C/20C 02C 023.03° Bituminous Concrete 4,000 4,000 60 ICE 108.30 334.10 CH20X CAT I Green tick Green tick
20C 203.03° ICC 109.70 333.20 CH34X CAT II
02R/20L 02R 023° Asphalt 2,750 2,750 60 ICX 110.50 329.60 CH42X CAT I Green tick
20L 203° ICZ 108.55 329.75 - CAT I

Air Traffic Service Communication Facilities

Air Traffic Service Communication Facilities [13]
Service Designation Call Sign Frequencies (MHz) Hours of Operation (SST) Remarks
Air Control Center (ACC) Singapore Radar 124.050 0000-1530 Flow control service: Arrival & Departure Aircraft
133.250 24 Hr - 7 Day North
134.400 24 Hr - 7 Day South
123.700 24 Hr - 7 Day East
134.200 24 Hr - 7 Day South-East
Approach (APP) Singapore Changi Arrival 119.300 24 Hr - 7 Day Intermediate & Final Approach
Singapore Changi Approach 120.300 24 Hr - 7 Day Intermediate Approach
Tower (TWR)
Singapore Changi Control Tower 118.250 0000-1600 Runway 02C/20C
118.600 24 Hr - 7 Day All Departures (Takeoff) & Arrivals (Landing)
0000-1600 Runway 02L/20R
Singapore Changi Ground
Movement Control
121.725 0000-1700 Aircraft On East Of Terminal 2
2100-0000
121.850 0000-1800 Aircraft On North Of Terminal 1
2300-0000
124.300 1600-0000 Start-up/Push-back/Taxiing Of All Aircraft
0000-1600 Aircraft on West of Terminal 3
Singapore Delivery 121.650 24 Hr - 7 Day Pre-flight Check/ATC Clearance
Singapore Changi Apron 121.900 24 Hr - 7 Day Vehicular Movements On Taxiways and Runways

Airport Hotel

Crowne Plaza at Changi Airport.

The Crowne Plaza Hotel is linked to Changi Airport's Terminal 3 via a covered link bridge, with Terminals 1 and 2 reachable by Skytrain located within the immediate vicinity of Changi Airport. lt is 9-storeys high and has 320 guest rooms.[14] In 2015, the Crowne Plaza Hotel was named as the World's Best Airport Hotel by Skytrax for the third year running.

Airbus A380 operations

Singapore Airlines A380-800 (9V-SKD).

With Changi-based Singapore Airlines being the launch customer for the Airbus A380, works to ensure full capability in handling the large aircraft were given priority in time for its introduction in October 2007. The Civil Aviation Authority of Singapore spent S$60 million in upgrading the two existing terminals and airport infrastructure, including enlarged gate holdrooms, new finger piers, and extended baggage belt carousels from the normal 70 m (230 ft) to 90 m (300 ft). With these new carousels in place, the airport does not expect embarking and disembarking passengers and baggage from the A380 to take longer than it does from a Boeing 747-400, which carries fewer passengers. On 16 August 2005, Changi Airport unveiled the first of 11 specially built gates capable of handling the giant aircraft. Costing S$15 million, the gates or 'fingers' enable passengers to board the upper deck of the new 555-seater aircraft directly from the gate hold rooms. The hold rooms themselves have been enlarged and appointed to cater for the larger number of passengers aboard an A380. Beside the 11 new A380-capable gates at Terminals 1 and 2, eight more A380-capable gates were opened at Terminal 3 on 9 January 2008.[15]

Jewel Changi Airport

Artist's impression of 'Jewel Changi Airport', the new mixed-used complex set to be constructed on the carpark site fronting Changi Airport's Terminal 1. The complex is being designed to be architecturally iconic, with a stunning glass and steel facade. (Photo: Changi Airport Group).

Announced in August 2013, this is a new terminal structure intended as a mix-use complex.[16] It will be situated on a 3.5-hectare site where the Terminal 1 car park now resides. Jewel is a joint venture between Changi Airport (51%) and CapitaMalls Asia (49%). Essentially, a new multi-storey underground car park of about 2,500 car park spaces will replace the existing facilities, while an indoor garden (with a waterfall) will be built above. The new building will sit between the three existing terminal buildings, enabling passengers to transfer via the new complex, whilst being an attraction and shopping destination in itself. The design will consist of a circular structure, reminiscent of a doughnut, with a large garden located at the centre and water falling from the edge of the circular atrium opening. There would also be a hotel of about 130 rooms as part of the project.[4]

As part of the project, Terminal 1 will be expanded to allow more space for the arrival hall, baggage claim areas and taxi bays. These enhancements will increase T1's passenger handling capacity to 24 million passenger movements per annum by 2018.[17]

Passenger terminals

Changi Airport currently has three terminals, T1, T2, and T3, with a total annual handling capacity of 66 million. Terminals 1, 2, and 3 are directly connected via a monorail people mover system, with airside passengers being able to freely move between the terminals without going through immigration. Transport within and between these three terminals is also provided by people movers and the skytrain system, although it is also possible to walk between the terminals on foot for landside visitors.

A former Budget Terminal, capable of handling 7 million passenger per year, was purpose-built for low-cost carriers. It was physically separated from the main terminals towards the south, where connections were possible via a free shuttle bus service to and from Terminal 2. Demolition began in 2013 to make way for a new and bigger Terminal 4.[18][19]

Terminal 1

Swimming pool in the transit area of Terminal 1.

Singapore Changi Airport's oldest terminal operated as the sole terminal from its opening on 1 July 1981 right up until the opening of Terminal 2 nine years later. Configured in a H-shaped layout to maximise the number of aerobridges which may be built, it underwent two major upgrading works over its lifespan. A major refurbishment was completed in 1995 at a cost of S$170 million and work to extend two finger piers to add 14 aerobridges at a cost of S$420 million took place from 1996 to 1999. Today, the terminal spans an area of 308,000[20] m² and can accommodate a maximum passenger capacity of 21 million passengers a year.

On 7 March 2012, Minister of State for Transport Josephine Teo said that the open-air car park between Terminal 1 and Changi's iconic control tower will be redeveloped into a multi-use complex. This new complex will be integrated with the existing building, and will increase Terminal 1's public areas, pick-up driveways, and car park spaces. With this expansion, Terminal 1's handling capacity will increase from 21 to 24 million passengers per annum. The expansion of Terminal 1 will go together with Terminal 4.[21]

As of 12 July 2012, a $500 million facelift for Terminal 1 has been completed,[22] completing the terminal's largest renovation to date, involving works on its facade and halls under a theme called "Tropical City".[23] About 22,000 m2 have been added to the building, bringing the total floor space of T1 to about 308,000 m2. The larger floor area provides for more spatial comfort, better passenger flow, additional facilities and expanded retail and F&B offerings. The refurbishment includes the installation of a two-part kinetic sculpture, Kinetic Rain, billed as the largest kinetic sculpture in the world.[24]

The Southwest Finger of Level 3 of Terminal 1 has the head office of Jetstar Asia Airways. Scoot also has its head office inside Terminal 1.[25]

Terminal 2

Terminal 2 Departure Hall.

Terminal 2 opened on 22 November 1990 as part of Phase II in the original airport masterplan. Deploying a linear configuration parallel to the runways, it is located adjacent to Terminal 1 towards the south, and heralded the opening of the original skytrain system linking the two terminals via the landside. All Singapore Airlines and SilkAir flights moved to the new terminal when it opened, along with several Southeast Asian carriers including Malaysia Airlines, Philippine Airlines, PAL Express, and Royal Brunei Airlines. They were joined by several airlines, some of which are allied to Singapore Airlines, in particular Lufthansa, both fellow Star Alliance members. Air France was a former user before moving back to Terminal 1. Other former users include Air Canada and Austrian Airlines, which ceased operations to Changi in October 2006. Etihad Airways was the latest airline to operate from Terminal 2 when it commenced flights in September 2007. All Nippon Airways moved to Terminal 2 from 1 October 2008.[26] Now Singapore Airlines flights departing for Southeast Asia, Indian Subcontinent, the Middle East and Africa use this terminal. Airlines operating at Budget Terminal, including Tigerair, and Cebu Pacific, moved to Terminal 2 as the Budget Terminal closed for site redevelopment.

The fourth storey of the terminal houses the Civil Aviation Authority of Singapore.[27] In addition Terminal 2 houses the offices of the Air Accident Investigation Bureau of Singapore and Changi Airport Group.[28][29][30]

On 15 July 2013, the Airport unveiled its latest themed garden that has a display of colours and interactive technology – a first for Changi Airport, which has pioneered the concept of airport gardens since its opening in 1981. The new 'Enchanted Garden' – Changi Airport's fifth themed garden – takes pride in the spot where the Fern Garden once stood. It is open, free of charge, to passengers round-the-clock. Motion sensors trigger sounds of nature and blooming flowers while fibre-optic and LED lighting, embedded in the flooring, form a fascinating carpet of sparkling lights. There is also a pond containing Archerfish and Koi.[31]

Former Budget Terminal

Changi Airport was the second in Asia (after Kuala Lumpur International Airport) to open a dedicated terminal catering to the budget traveller. The name of the Budget Terminal was decided as a result of a naming contest open to the public. However, the terminal is not included in the numbering scheme, even though it is the third terminal to be opened when it opened on 26 March 2006; and Terminal 3 is actually the fifth terminal to be opened at the airport.

To offer lower landing fees, handling fees and airport taxes, it cuts back on amenities such as aerobridges, elaborate physical structures and decorations in the passenger terminal building. There is no transfer facility at the Budget Terminal.

In September 2008, expansion works costing $10 million began and took seven months to complete. The terminal was then able to handle seven million passengers a year, up from originally 2.7 million. There are more boarding gates, check-in counters, shops and dining options. In addition, air-conditioning has been installed for arriving passengers.

On 2 March 2011, it was announced that the Budget Terminal would be closed on 25 September 2011 and demolished to make way for Terminal 4. All airlines previously operating from the Budget Terminal moved to Terminal 2, after the last flight departed Budget Terminal at 2 am on 25 September. Construction of Terminal 4 began in 2012, and is expected to be completed by 2017. It will have a capacity for 16 million passengers per annum, up from the previous 7 million of the Budget Terminal, and will not have aerobridges. It also promises to have a wider choice of retail and food and beverage offerings compared to the current Budget Terminal. Terminal 4 will be designed to enable efficient passenger processing and quick turnaround of aircraft. That is because once the ASEAN Open Skies agreement is in place by 2011, passenger traffic will likely grow by at least five per cent each year.

On 25 September 2011, Budget Terminal officially closed its doors to the public, with its airlines operations moved to Terminal 2 on the same day

On 1 October 2011, demolition work for the Budget Terminal started and was completed by December 2011.

JetQuay CIP Terminal

JetQuay CIP Terminal, the airport's fourth terminal, is a privately run terminal, located next to T2. JetQuay provides private check-in, baggage handling, and immigration clearance services. It is the second luxury airport terminal in world to open after the Lufthansa First Class Terminal in Frankfurt Airport. However, unlike the Lufthansa First Class Terminal, JetQuay is an elite, dedicated CIP (Commercially Important People) terminal that can be used by any passenger travelling in any class, on any airline, through any of the main terminals (T1, T2, or T3).

Terminal 3

Transit area of Terminal 3.
The Butterfly Garden in Terminal 3.
Shops line along the transit area in Terminal 3.

Terminal 3, the airport's fifth terminal, became operational on 9 January 2008,[32] increasing the airport's annual passenger capacity by 22 million. The test flight out of Terminal 3 was a Singapore Airlines flight from Singapore to Perth. The flight departed T3 at 5:30 pm local time, landing in Perth International Airport at approximately 11:30 pm. The terminal has 28 aerobridge gates, with eight capable of handling the Airbus A380. While the other two terminals use separate waiting areas for different gates, Terminal 3 has common waiting areas for some of the gates.

Designed by CPG Corporation,[33] with Skidmore, Owings and Merrill designing the roof feature[34] and interior design by Woodhead,[35][36] Terminal 3 departs from the largely utilitarian architecture in the first two terminals. Like other new airports in the region, it has a structure mainly made of glass, with big transparent spaces inside the terminal. However, unlike these newer airports, it incorporates "natural" features and "warm" tone extensively to balance the sterile feel of glass and steel. For example, the column is given a wood-like cladding and the floor of the terminal is mostly cream/ beige colour. The roof has been designed to allow natural light to enter the building, with 919 skylights. A 5 m (16 ft)-high "Green Wall" with hanging creepers and waterfall was incorporated to enhance the tropical feel. The Green Wall, designed by Singapore-based Landscape Design firm Tierra Design, also helps to regulate the internal temperature of the terminal with the occasional misting. The interior architecture of Terminal 3 recently won the Honour Award from ASLA,[37]

Singapore Airlines operated the first flights into Terminal 3 on 9 January 2008, with flight SQ001 from San Francisco via Hong Kong arriving at 1150 hours to a welcome ceremony by Minister for Transport and Second Minister for Foreign Affairs, Lim Siang Keat Raymond and the chairman of CAG, Liew Mun Leong. The first departure flight, SQ318, took off at 1250 hours bound for London-Heathrow. Since then, its regional and long-haul flights bound for North/South America, Europe, East Asia and Oceania depart from the new terminal while all other flights depart from Terminal 2, becoming the first and only airline to operate from multiple terminals in Changi Airport.

China Eastern Airlines, Jet Airways, Qatar Airways and United Airlines also moved operations to the terminal on 1 January 2008,[38][39] while Kingfisher Airlines launched services to Singapore using T3 in 2009. Garuda Indonesia, Saudi Arabian Airlines, Vietnam Airlines and Sri Lankan Airlines have also moved operations to T3 in 2011.[40] In 2013, Asiana Airlines and Lion Air have also moved operations to T3.[41] Ethiopian Airlines and Spring Airlines used to operate from Terminal 3. On 2 July 2015, China Airlines and EVA Air shifted its operations to T3.

Terminal 4

Changi Airport Terminal 4 is slated for completion in 2017. This terminal will replace the previous Budget Terminal. Cathay Pacific will be the first airline to operate from the terminal, followed by Korean Air, Vietnam Airlines and the AirAsia Group (AirAsia, Indonesia AirAsia and Thai AirAsia).

Terminal 5

A fifth terminal, Terminal 5, will be ready in the next decade as announced by Transport Minister, Lui Tuck Yew on 7 May 2013. Terminal 5 will be built on 1,080 hectares of reclaimed land in Changi East, making it one of the largest terminals in the world. The terminal could handle a capacity of 50 million passengers annually. With the addition of the fifth terminal, Changi Airport will be able to cater to more than 135 million passengers every year. With the national carrier at Terminal 5, each alliance of airlines such as SkyTeam and Oneworld could also operate out of dedicated terminals. Terminal 5 is also expected to have more self-service facilities and bigger lounges.[2][3] Terminal 5 will be linked to the other terminals at Changi Airport. This will allow the expanded Changi Airport to be operated as a single, integrated airport for ease of transfer between different terminals, maximum passenger convenience and airfield operational efficiency.

In order to create a contiguous and integrated airfield, the existing Changi Coast Road and the park connector beside it will be replaced with a new at-grade road and park connector further east, along the eastern coastline. Works are expected to start in the second half of 2014. The road infrastructure will be improved to ensure convenient access to Terminal 5. The terminal will also be connected to the MRT network. More details will be released after engineering studies are completed. The adequacy of bus services to the airport will also be reviewed. These plans will ensure that all airport users and staff are able to travel to the airport easily and conveniently.[42]

Services

Changi Airport is a top airport in terms of customer service and security and has won over 500 awards and accolades as best airport since its opening in 1981,[43] from organisations such as Skytrax[44][45] and Business Traveller. [45]

Passenger services

Flight Information Display System (FIDS) displays in the departure area of Changi Airport T3 driven by Intersystems RapidFIDS.
Extensive foliage in Terminal 2 provides relaxation for passengers in the transit area.

The airport has over 70,000 m2 (753,500 sq ft) of space spread between its three main terminals for shopping and eating outlets, with Terminal 3 having the largest amount of retail space at 20,000 m2 (215,300 sq ft).[46]

From two different lounges with 24-hour napping areas, showers and spa facilities, to hotel and pool amenities, this airport also includes Singapore Tours (created for those in transit for more than 5 hours who are granted a special pass to leave the airport on one of two city tour options[47]), Nature Trail (with six themed garden reserves) and comprehensive dining and entertainment options.[48]

In terms of sales, the airport outstrips other shopping malls in Singapore, including those in top tourist spot Orchard Road. The Changi Airport Group derives 55% of its total annual revenue from non-aeronautical sources,[49] such as office and warehouse rental. The airport derives the majority of its commercial revenue from the duty-free shopping, with the most popular items being liquor and tobacco, perfume and cosmetics, and luxury goods.

In addition to a wide array of duty-free shops and eating outlets, Changi Airport has five garden areas, some outdoors and some indoors. Open to customers of the airport, the gardens are: Cactus Garden (T1 – outdoor), Sunflower Garden (T2 – outdoor), Orchid Garden (T2 – indoor), Enchanted Garden (T2 – indoor), and Butterfly Garden (T3 – outdoor). Changi Airport has numerous business centres located around the airport. Within the international transit area of the interconnected Terminals 1,2 and 3,[50] internet and games facilities, prayer rooms, showers, spas, gym, swimming pool and a hotel are provided. Various lounge areas are provided, some including children's play areas or televisions showing news, movie and sport channels.

Passengers at Changi Airport will soon be able to board their flights faster, with the introduction of self-boarding gates. The Changi Airport Group (CAG) has been conducting trials of the self-boarding gates at a common gatehold room in Terminal 2 since May with Lufthansa. The self-boarding gates are just one component of a fast and seamless travel (FAST) initiative which CAG will be rolling out across terminals at the airport. Since April 2014, the gates have been progressively introduced in common gatehold rooms in all three terminals.

The ongoing trial of a number of self-service functions – check-in, bag tagging and bag drop – will run for about three months until August 2014. It will enable CAG to assess improvements and adjustments needed for the hardware and software of the various systems.

Two self bag-drop units and four self check-in kiosks have been fitted alongside the Jetstar check-in counters in Terminal 1. Passengers on selected Jetstar flights are invited to use these self-service options. At the self check-in kiosk, passengers print their boarding pass as well as baggage tag after checking in. After tagging their baggage, they can drop it off at the self bag-drop counter. A receipt is provided for checked-in baggage. Instructional videos and signs are available to guide passengers, and on-ground staff are also present to provide assistance. Since the trial started in early-May, about 1,000 passengers have used the FAST facilities.

Aviation services

Ground handling

An Emirates Boeing 777-300 and Cathay Pacific Boeing 747-400 being serviced at Terminal 1

Ground handling services are handled by two companies: Singapore Airport Terminal Services (SATS) and Dnata. SATS is the dominant player with close to 70% of the market in the airport. Dnata Singapore, formerly Changi International Airport Services (CIAS), was formed in 1977 by the Port of Singapore Authority and five airlines (Air France, China Airlines, Garuda Indonesia, Koninklijke Luchtvaart Maatschappij N.V. (KLM; Royal Dutch Airlines) and Lufthansa). It handles the remaining market share.

In the early 2000s, the government decided to introduce competition into the market by offering an additional licence. Swissair's Swissport won the 10-year licence and commenced operations on 2 March 2005.[51]

As Swissair folded and was subsequently taken over by Swiss International Air Lines, the latter became the company's first customer. Adam Air chose Swissport as its ground handler in 2005, while Tiger Airways followed suit in 2006. Other customers of Swissport include Swiss World Cargo, AirAsia, and Cardig Air. Former customers of Swissport include Australian Airlines. Swissport ceased operation on 31 March 2009 due to massive losses. Asia Pacific Star was launched on 1 April, is a subsidiary of SATS, and is the new player concentrating mainly on budget carriers.[52] It handles Tiger Airways, South East Asian Airlines, Jetstar Asia, Valuair, Lion Air.

CIAS underwent restructuring when its shareholding was bought over by Dubai's Dnata in 2004, being relaunched in August 2011 with a new branding.[53] Its security services were amalgamated into the new Temasek-owned Aetos Security Management.[54]

Aircraft maintenance

Six aircraft hangars, capable of full aircraft maintenance, repair and overhaul is operated and managed by SIA Engineering Company at Changi Airfreight Centre and five aircraft hangars by SASCO/ST Aerospace. It includes a 20,000 m2 (215,300 sq ft) column-free hangar at SIA Engineering Company, Hangar 1, which was the world's largest when opened in 1981.[55]

References

  1. "Data officially declared by Changi Airport". Changiairport.com. Retrieved 8 November 2011.
  2. 1 2 "Singapore's 5th airport terminal to be ready in next decade". Channel NewsAsia. 7 May 2013.
  3. 1 2 "New Terminal 5 likely to be Changi Airport's biggest terminal". Channel NewsAsia. 8 May 2013.
  4. 1 2 "Jewel Changi Airport at a glance" (PDF). Changi Airport. Retrieved 5 December 2014.
  5. "Work on Changi Airport's Project Jewel begins". Channel NewsAsia. 5 December 2014. Archived from the original on 6 December 2014.
  6. 1 2 3 Aerodrome Geographical and Administrative Data, Services and Facilities and Meteorological Information and Runway Physical Characteristics
  7. "Changi Airport – Facts & Statistics" (PDF). Singapore Changi Airport.
  8. "Singapore Changi Control Tower". Civil Aviation Authority Singapore (CAAS).
  9. "Budget 2013: Third runway for Changi Airport by 2020". The Straits Times. 13 March 2013. Retrieved 13 March 2013.
  10. "Singapore Changi Airport (WSSS) Runway Informations, Radio Navigations & Landing Aids" (PDF). Civil Aviation Authority of Singapore (CAAS). 20 October 2011. Retrieved 24 January 2016.
  11. "Singapore Changi Airport (WSSS) Approach and Runway Lighting" (PDF). Civil Aviation Authority of Singapore (CAAS). 15 October 2015. Retrieved 24 January 2016.
  12. "Runway Informations" (PDF). Civil Aviation Authority of Singapore (CAAS). 10 December 2015. Retrieved 25 January 2016.
  13. "Singapore Changi Airport (WSSS) Air Traffic Service Communication Facilities" (PDF). Civil Aviation Authority of Singapore (CAAS). 5 March 2015. Retrieved 25 January 2016.
  14. "Crowne Plaza Changi Airport".
  15. "First Gate at Singapore Changi Airport is Ready for Airbus 380". Civil Aviation Authority of Singapore (CAAS). 16 August 2005. Retrieved 31 October 2012.
  16. "Changi Airport Group to develop iconic mixed-use complex". Changi Airport Group. 19 August 2013. Retrieved 19 August 2013.
  17. "Singapore Changi Airport breaks new ground with Jewel" (PDF). 5 December 2014.
  18. "Demolition starts on Budget Terminal". 1 February 2013. Retrieved 1 February 2013.
  19. "Demolition work for Budget Terminal begins to make way for T4". The Straits Times. 1 February 2013.
  20. http://www.changiairportgroup.com/export/sites/caas/assets/media_release_2012/12_July_2012.pdf
  21. Steering committee set up to chart Changi Airport's future development. Channel NewsAsia (7 March 2012). Retrieved on 15 August 2012.
  22. "Changi Airport Terminal 1 completes S$500m facelift". Channel NewsAsia. Retrieved 12 July 2012.
  23. "Takenaka Corp wins contract to upgrade Changi Airport's Terminal 1". Channelnewsasia.com. 14 February 2008. Retrieved 8 November 2011.
  24. Shetty, Deepika (5 July 2012). "It's raining metal at Changi". Jakarta Post. Retrieved 6 July 2012.
  25. "Singapore Air Operators." (Archive) Civil Aviation Authority of Singapore. Retrieved on 31 October 2012. "#034-30 Passenger Terminal Building 1, Level 3, Southwest Finger, Singapore Changi Airport, Singapore 918141" and "#034-30 Passenger Terminal Building 1, Level 3, Southwest Finger, Singapore Changi Airport, Singapore 918141" and "80 Airport Boulevard, #041-60A Changi Airport Terminal 1, Singapore 819642"
  26. "Travel Information: Singapore". Ana.co.jp. Retrieved 8 November 2011.
  27. "Contact Us." Civil Aviation Authority of Singapore. Retrieved 12 February 2011. "Civil Aviation Authority of Singapore 60 Airport Boulevard 4th Storey, Terminal 2 Singapore Changi Airport Singapore 819643"
  28. "Contact AAIB." Air Accident Investigation Bureau of Singapore. Retrieved 4 October 2010. "AAIB Office: Singapore Changi Airport Passenger Terminal Building 2, #048–058 Republic of Singapore"
  29. "map_high.jpg." Changi Airport Group. Retrieved 12 September 2011.
  30. "Changi Airport Interactive Map." (SWF) Changi Airport. Retrieved 12 February 2011.
  31. "Enchanted Garden to delight Changi Airport passengers". Changi Airport. Retrieved 15 July 2013.
  32. "Singapore Changi Terminal 3 Opens". Dfnionline.com. Retrieved 8 November 2011.
  33. "Singapore Changi Airport Terminal 3 finally starts operations". World Architecture News.com. Retrieved 12 June 2011.
  34. "Changi International Airport – Terminal 3, Singapore". Skidmore, Owings and Merrill LLC. Retrieved 22 March 2008.
  35. "Changi Airport, Terminal 3, Singapore". Brintons. Retrieved 12 June 2011.
  36. "Changi Airport (SIN/WSSS), Singapore". Airport Technology. Retrieved 21 March 2008.
  37. "Changi Airport Terminal 3 Interior Landscape, Singapore". American Society of Landscape Architects. 12 May 2009.
  38. "Four airlines to join SIA at new Terminal 3 when it opens on Jan 9". Channel NewsAsia. 25 October 2007.
  39. China Eastern Airlines, Jet Airways, Qatar Airways and United Airlines Ready for Take-Off at Changi Airport Terminal 3. (PDF) . Retrieved on 15 August 2012.
  40. "detikNews : Garuda Pindah ke Terminal 3 Bandara Changi Singapura". Us.detiknews.com. 26 January 2011. Retrieved 8 November 2011.
  41. "Four airlines to move to new terminals at Changi Airport". www.changiairport.com. Retrieved 2 December 2013.
  42. "Changi developments to open path to new opportunities" (PDF). 6 May 2014.
  43. A record 51 million passengers for Changi Airport in 2012.
  44. "Singapore Changi Airport named World's best Airport in 2010". Worldairportawards.com. Retrieved 8 November 2011.
  45. 1 2 "2010 – Accolades Received by Changi Airport Group / Singapore Changi Airport". Changi Airport Group. Retrieved 12 June 2011.
  46. "Strait Times". Straits Times. Singapore. Retrieved 8 November 2011.
  47. "Free Singapore Tour Courtesy Changi Airport".
  48. "Changi Airport". Retrieved 8 May 2008.
  49. "S$1m cash prize awaits lucky shopper at Changi Airport – Channel NewsAsia". Channelnewsasia.com. 31 May 2010. Retrieved 8 November 2011.
  50. "Inter-Terminal Transfer at Changi".
  51. "Swissport handles its first flight in Singapore – four months earlier than planned". News Releases. Swissport International. 2 March 2005. Archived from the original on 15 April 2009. Retrieved 20 January 2008. 2 March 2005 – Swissport commenced its operations at Singapore's Changi Airport today, becoming the airport's third ground handling provider; Swissport's new licence at Changi is valid for ten years and covers passenger, baggage and cargo handling services.
  52. "SATS launches low-cost ground-handling unit Asia-Pacific Star" (PDF). Theedgesingapore.com. 10 March 2009. Retrieved 8 November 2011.
  53. "Our Brands". The Emirates Group. Retrieved 21 August 2013.
  54. "Formation of AETOS Security Management Pte Ltd". Temasek Holdings. 31 March 2004. Retrieved 21 August 2013.
  55. Muliani Tan, Bonny (2001). "Changi International Airport". singaporeInfopedia. National Library Board Singapore. Retrieved 3 November 2006.
This article is issued from Wikipedia - version of the 11/29/2016. The text is available under the Creative Commons Attribution/Share Alike but additional terms may apply for the media files.