SRT Light Red Line
SRT Light Red Line รถไฟฟ้าชานเมืองสายสีแดงอ่อน | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Bang Son Station | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Overview | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Type | Commuter rail | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
System | Bangkok Suburban Commuter Train | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Status | Taling Chan - Bang Son services suspended 13 Jan 2014 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Termini |
Hua Mak Sala Ya | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Stations | 22 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Website | Red Line Project | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Operation | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Opened |
December 5, 2012 for trial service Bang Son - Taling Chan 2017 (est.) Phase 2 Bang Sue - Hua Mak) 2019 (est.) Phase 3 Taling Chan - Sala Ya) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Owner | State Railway of Thailand | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Technical | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Line length | 58.5 km (36.35 mi) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Track gauge | 1,000 mm (3 ft 3 3⁄8 in) metre gauge | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electrification | None Diesel Multiple Units | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Operating speed | 80 km/h (50 mph) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
The Light Red Line is part of the planned Red Line suburban railway system to serve the Bangkok Metropolitan Region. It will run east–west from Sala Ya in Phutthamonthon District of Nakhon Pathom Province to Hua Mak Railway Station in Bangkok. The segment from Taling Chan to Bang Son (15 km) opened for limited, free trial service on December 5, 2012. Only 12 services a day (6 each way) operated on the line until all services were fully suspended on 13 January 2014 pending further notice. In July 2016 the cabinet approved the construction of the Bang Sue–Phaya Thai–Makkasan–Hua Mak segment.[1] Bidding will be held in August 2016, with construction from 2017-2019 and opening in 2020.
Stages
Bang Sue–Taling Chan
The contract for the initial stages from Taling Chan to Bang Sue was signed on December 15, 2008, with the contract awarded to the Unique-Chun Wo consortium.[2] Construction started in early 2010 but was delayed for a few months due to the late 2011 floods in Bangkok which inundated the route. Construction was completed by the 3rd quarter of 2012. Testing began in September 2012 for a 3-month period.[3]
Bang Sue–Hua Mak
Construction is expected to start in 2017. There will be stations at Ratchawithi, Phaya Thai, Makkasan and Hua Mak.
Operation
The line opened for free limited trial service on 5 Dec 2012 between Taling Chan and Bang Son. The line is operated with 2 refurbished DMUs running a very limited service. There are only 6 services each way a day every 60 minutes from 6am to 8am and from 4pm to 7pm. As such, only a few hundred passengers a day ride the service.[4] As of 14 September 2013, weekend services were cancelled.[5] Effective on 13 January 2014 all services were suspended until further notice.
Until the Bang Sue Terminal is complete and the SRT purchases new rolling stock this service the line cannot fully operate.
Future extension
Taling Chan-Salaya Extension
The SRT Light Red Line is planned to be extended by 12 km west to Salaya.[6] 4 stations are planned be built along the existing SRT corridor;[7] 1) Ban Chimplee station, 2) Kanchanaphisek (Phutthamonthon Sai 2), 3) Sala Thammasob, 4) Salaya.
Taling Chan-Siriraj spur line
The SRT operates existing services to Kanchananburi from Thonburi station. This line is planned to be converted to a spur line of the existing Light Red line, from Taling Chan to Thonburi/ Siriraj.
In August 2012, the SRT proposed that 3 stations be built for this 6.5 km route:[8] 1) Talingchan Floating Market station at Bang Ramad, 2) Charansanitwongse station (connect with the MRT Blue Line) 3) Thonburi/Siraraj station (connect with the MRT Orange Line)
As of December 2013 no final approval had been granted to construct this spur line with the extension to Salaya being the priority.
Additional stations
Two additional stations on either side of the Chao Praya river have been approved to be built, at Rama 6 bridge and Bang Kruay (EGAT).[9] However, as of December 2013 no contracts have been tendered for these two stations.
Stations
Code | Station Name | Thai | Express Train | City Train | Transfer | Province |
SRT Light Red Line | ||||||
x | Hua Mak | หัวหมาก | ARL : Hua Mak MRT : Hua Mak (proposed) |
Bangkok | ||
x | Ramkhamhaeng | รามคำแหง | ARL : Ramkhamhaeng | |||
x | Makkasan (City Air Terminal) | มักกะสัน (สถานีรับส่งผู้โดยสารอากาศยานในเมือง) |
ARL MRT : Petchaburi | |||
x | Phaya Thai | พญาไท | BTS : Phaya Thai ARL : Phaya Thai | |||
x | Ratchawithi | ราชวิถี | SRT (proposed) ARL (begin construction in September 2016) | |||
x | Sam Sen | สามเสน | SRT (proposed) | |||
x | Pradiphat | ประดิพัทธ์ | SRT (proposed) | |||
x | Bang Sue | บางซื่อ | SRT (proposed) MRT : Bang Sue | |||
x | Bang Son | บางซ่อน | MRT : Bang Son | |||
x | Bang Kruai-EGAT | บางกรวย-กฟผ. | Nonthaburi | |||
x | Bang Bamru | บางบำหรุ | InnerCity Shortcut: Bang Bamru (proposed) | |||
x | Taling Chan | ตลิ่งชัน | MRT : Talingchan (proposed) | Bangkok | ||
x | Ban Chimphli | บ้านฉิมพลี | ||||
x | Kanchanaphisek | กาญจนาภิเษก | ||||
x | Sala Thammasop | ศาลาธรรมสพณ์ | ||||
x | Sala Ya | ศาลายา | Nakhon Pathom | |||
Talingchan-Sirirat Branch Line | ||||||
x | Taling Chan | ตลิ่งชัน | MRT : Talingchan (proposed) | Bangkok | ||
x | Talat Nam Taling Chan | ตลาดน้ำตลิ่งชัน | ||||
x | Charan Sanitwongse | จรัญสนิทวงษ์ | MRT : Bang Khun Non (proposed) MRT : Bang Khun Non (Under construction) | |||
x | Thonburi-Sirirat | ธนบุรี-ศิริราช | MRT : Sirirat (proposed) | |||
Bang Bamru-Makkasan InnerCity Shortcut Line | ||||||
x | Bang Bamru | บางบำหรุ | Main line: Bang Bamru | Nonthaburi | ||
x | Sirindhorn | สิรินธร | MRT : Sirindhorn (Under construction) | Bangkok | ||
x | Sam Sen | สามเสน | MRT : Sam Sen (proposed) | |||
x | Khaodin Zoo | สวนสัตว์เขาดิน | ||||
x | Victory Monument | อนุสาวรีย์ชัยสมรภูมิ | BTS : Victory Monument | |||
x | Makkasan | มักกะสัน | ARL : Makkasan |
References
- ↑ "Cabinet gives green light to extension of Light Red Line, Dark Red Line railway". Bangkok. 2016-07-27. Retrieved 2016-09-11.
- ↑ Mahitthirook, Amornrat (19 April 2009). "Red Line bidding to open in August". Bangkok Post.
- ↑ Testing underway on Bangkok suburban line, International Railway Gazette, 07 Sept 2012
- ↑ http://www.thairath.co.th/content/region/312438, 6 March 2013
- ↑ https://www.facebook.com/photo.php?fbid=3527350840078&set=a.1465205967745.44001.1761413660&type=1&ref=nf
- ↑ http://www.siamlocalnews.com/anrt2553/view.php?gid=4033&newsid=6847&issueid=2064
- ↑ http://www.siamlocalnews.com/anrt2553/view.php?gid=4033&newsid=6845&issueid=2064
- ↑ http://www.prachachat.net/news_detail.php?newsid=1344342525&grpid=03&catid=00&subcatid=0000
- ↑ http://www.prachachat.net/news_detail.php?newsid=1356496581&grpid=&catid=19&subcatid=1900, 26 Dec 2012
External links
Wikimedia Commons has media related to SRT Light Red Line. |
- "SRT Red Line website"
- "2Bangkok Light Red Line thread" Semi-regular updates, articles, pictures and commentary (In English)
See also
- Airport rail link
- Bangkok Metro
- BTS Skytrain
- SRT Red Lines
- MRT Blue Line
- MRT Orange Line
- MRT Purple Line
- Bangkok BRT