Semarang–Solo Toll Road

Semarang-Solo Toll Road
Jalan Tol SOMAR
Route information
Part of
Maintained by Trans Marga Jateng (TMJ)
Existed: 2009 – present
Major junctions
North end: Semarang
  Interchange Tembalang
Interchange Ungaran
Interchange Bawen
South end: Surakarta
Location
Major cities: Semarang
Surakarta
Highway system
Roads and Highways in Indonesia
Banyumanik Toll Plaza
Semarang Solo Toll Road, Ungaran Interchange

Semarang–Solo Toll Road is a part of Trans-Java toll road that connects Semarang, capital city of Central Java and Surakarta (Solo) via Salatiga. This toll road is 75.7 kilometers length which is directly connected with Semarang Toll Road in Tembalang Interchange.
Land acquisition at the end of 2011, Section Ungaran-Bawen was 93 percent, while Section Bawen-Solo is still under feasibility studies, so land acquisition for all Semarang–Solo Toll Road at early February 2012 was only 26.84 percent. Although all of land acquisitions not yet finished, the road construction has been commenced, due to construction is follows land acquisition. It will be operated by PT Trans Marga Jateng, a subsidiary of state-owned toll road developer and operator PT Jasa Marga (IDX:JSMR) Tbk.[1][2]

Road Section

This toll road has been decided into 5 sections :[3]

No
Section
Length
Status
1 Section 1 (Tembalang - Ungaran) 16.3 km
Operated
2 Section 2 (Ungaran - Bawen) 11.3 km
Operated
3 Section 3 (Bawen - Salatiga) 18.2 km
Construction Preparation
4 Section 4 (Salatiga - Boyolali) 22.4 km
Land Acquisition
5 Section 5 (Boyolali - Karanganyar) 11.1 km
Land Acquisition

Bridges

This toll road has few long bridge, which crosses over both the river and the valley :
Section I (TEMBALANG-UNGARAN)

Section 2 (UNGARAN-BAWEN)

Route

Km Junction/Interchange Origin/Direction Marks
0.0Tembalang Interchange Semarang Toll Road Section C

NORTH
Semarang Toll Road
Jatingaleh/Krapyak
Kaligawe/Tanjung Emas Port
Jakarta
Demak/Surabaya
Half Trumpet Interchange
SEMARANG CITY TOLL ROAD
Operation Border by PT. Jasa Marga, Tbk.

Toll Road End/Begin
SEMARANG-SOLO TOLL ROAD
Operation Border by PT. Trans Marga Jateng

Toll Road End/Begin
-Ramp Jalan Tirto AgungJalan Tirto Agung

NORTH
Tembalang
Diponegoro University

SOUTH
Banyumanik/Jatingaleh
Ungaran/Bawen
BANYUMANIK TOLL PLAZA
Close Tolled System


Semarang City and Semarang Regency Border

-Ungaran InterchangeUNGARAN TOLL PLAZA
Kota Ungaran

NORTH
Banyumanik/Semarang

SOUTH
Bawen/Ambarawa
Magelang/Yogyakarta
Salatiga/Solo
Trumpet Interchange
-Bawen InterchangeBAWEN TOLL PLAZA

EAST
Salatiga/Solo

WEST
Bawen Junction


NORTH
Ungaran
Banyumanik/Semarang

SOUTH
Ambarawa
Magelang/Yogyakarta

Trumpet Interchange
End of Section 2
Semarang–Solo Toll Road

Next Plan : Section 3

References

This article is issued from Wikipedia - version of the 8/7/2016. The text is available under the Creative Commons Attribution/Share Alike but additional terms may apply for the media files.