Trans-Saharan gas pipeline

Trans-Saharan gas pipeline

Location of Trans-Saharan gas pipeline
Location
Country Nigeria, Niger, Algeria
General direction south-north
From Warri, Nigeria
To Hassi R'Mel, Algeria
General information
Type natural gas
Partners Sonatrach, NNPC, Government of Niger
Commissioned 2015 (estimated)
Technical information
Length 4,128 km (2,565 mi)
Maximum discharge 30 billion cubic meters per year

The Trans-Saharan gas pipeline (also known as NIGAL pipeline and Trans-African gas pipeline) is a planned natural gas pipeline from Nigeria to Algeria. It is seen as an opportunity to diversify the European Union's gas supplies.[1]

History

The idea of the trans-Saharan pipeline was first proposed in the 1970s.[1] On 14 January 2002, the Nigerian National Petroleum Corporation (NNPC) and Algerian national oil and gas company Sonatrach signed the Memorandum of Understanding for preparations of the project.[2] In June 2005, NNPC and Sonatrach signed a contract with Penspen Limited for a feasibility study of the project.[3] The feasibility study was completed in September 2006, and it found the pipeline to be technically and economically feasible and reliable.[4]

On the meeting on 20 February 2009, NNPC and Sonatrach agreed to proceed with the draft Memorandum of Understanding between three governments and the joint venture agreement.[5] The intergovernmental agreement on the pipeline was signed by energy ministers of Nigeria, Niger and Algeria on 3 July 2009 in Abuja.[1][6][7]

Safety concerns about the operations have now been heightened due to the recent In Aménas hostage crisis. Analysts predict that the estimated price tag of the project will rise due to the incident. Nigeria, Niger and Algeria are among the least secure areas in the region because of various active terrorist movements that destabilise them.[8]

Route

The pipeline will start in the Warri region in Nigeria and run north through Niger to Hassi R'Mel in Algeria.[9] In Hassi R'Mel the pipeline will connect to the existing Trans-Mediterranean, Maghreb–Europe, Medgaz and Galsi pipelines.[5] These supply Europe from the gas transmission hubs at El Kala and Beni Saf on Algeria's Mediterranean coast. The length of the pipeline would be 4,128 kilometres (2,565 mi):[1] 1,037 kilometres (644 mi) in Nigeria, 841 kilometres (523 mi) in Niger, and 2,310 kilometres (1,440 mi) in Algeria.[3]

Technical features

The annual capacity of the pipeline would be up to 30 billion cubic meters of natural gas.[1][5] It would have a diameter of 48 to 56 inches (1,220 to 1,420 mm).[5][9] The pipeline is expected to be operational by 2015.[1][10] The investment for the pipeline will be around US$10 billion and for gas gathering centers around $3 billion.[1][9][10][11] [12]

Operator

The pipeline is to be built and operated by the partnership between the NNPC and Sonatrach. The company would include also the Republic of Niger.[3] Initially NNPC and Sonatrach would hold a total 90% of shares, while Niger would hold 10%.[13]

Russian gas company Gazprom has negotiated with Nigeria about its possible participation in the project.[14][15] Also Indian company GAIL, France's Total S.A., Italy's Eni SpA and Royal Dutch Shell have expressed interest in participating in the project.[1][12][16] According to the Algerian energy minister Chakib Khelil "only partners that can bring something to the project, not just money, should be there."[13] Energy ministers of Algeria and Nigeria have said that "if things go well, there will be no need to bring international oil companies into the project" and "if the need for partnership in the project arises, not every partner will be welcome on board on the project."[17]

Opposition to the pipeline

The pipeline is opposed by the Nigerian militant group Movement for the Emancipation of the Niger Delta. A spokesman for the group warned that until issues regarding the exploitation of the Niger Delta and its people have been resolved, "any money put into the project will go down the drain."[18][19]

See also

References

  1. 1 2 3 4 5 6 7 8 Fabi, Randy (2009-07-03). "Nigeria, Algeria agree to build Sahara gas link". Reuters. Retrieved 2009-07-03.
  2. "Nigeria and Algeria begin study of $ 6 bn Trans-Saharan gas pipeline". This Day. Alexander's Gas & Oil Connections. 2005-05-16. Retrieved 2007-07-29.
  3. 1 2 3 Binniyat, Luka (2008-03-10). "14tcf of gas reserved for Trans-Sahara gas pipeline". Vanguard. Retrieved 2009-02-23.
  4. "Study proves technical, economic feasibility of Trans-Saharan gas pipeline". Magharebia.com. 2006-09-20. Retrieved 2009-07-04.
  5. 1 2 3 4 Awhotu, Ese (2009-02-20). "Nigerian, Algerian Officials Discuss Saharan Gas Pipeline". Leadership. Downstream Today. Retrieved 2009-02-23.
  6. Okolo, Paul (2009-07-03). "Nigeria, Algeria, Niger Sign Accord on Gas Pipeline". Bloomberg. Retrieved 2009-07-03.
  7. "Sahara gas pipeline gets go-ahead". BBC News. 2009-07-03. Retrieved 2009-07-03.
  8. "A look at North Africa: Algeria's troubles". Investvine. 2013-01-24. Retrieved 2013-01-27.
  9. 1 2 3 "FACTBOX-Sonatrach and its gas partners". Reuters. 2007-09-24. Retrieved 2009-02-23.
  10. 1 2 Awoniyi, Ola (2009-07-03). "Nigeria, Algeria, Niger seal $10 bln gas pipeline deal". AFP. Retrieved 2009-07-03.
  11. "Trans-Saharan gas pipeline to reach Europe in 2015". Business Intelligence Middle East. 2009-02-22. Retrieved 2009-02-23.
  12. 1 2 Fabi, Randy (2009-02-25). "Total, Gazprom eye Sahara gas pipeline venture". Reuters. Retrieved 2009-03-15.
  13. 1 2 Webb, Simon (2009-06-30). "No deal yet on firms for Sahara gas pipeline-Khelil". Reuters. Retrieved 2009-07-03.
  14. Tumanjong, Emmanuel (2008-03-31). "Gazprom In Talks To Join Trans-Saharan Pipeline - Official". Downstream Today. Dow Jones Newswires. Retrieved 2008-06-08.
  15. "Gazprom eyes Saharan pipe plans". Upstream Online. NHST Media Group. 2008-04-16. Retrieved 2008-06-08.
  16. "Algeria ambassador urges for Indian embassy". Business Standard. 2008-04-20. Retrieved 2009-02-23.
  17. Muhammad, Hamisu; Umar, Aisha (2009-07-07). "Trans-Saharan Gas Project 'Not For Sale' - Ministers". Downstream Today. Retrieved 2009-07-08.
  18. "Mend claims attack on Shell installation". Radio France Internationale. 2009-07-05. Retrieved 2010-10-24.
  19. Watkins, Eric (2009-07-07). "Nigerian militants threaten proposed Trans-Sahara gas line". Oil & Gas Journal. PennWell Corporation. 107. (subscription required). Retrieved 2009-07-08.

External links

This article is issued from Wikipedia - version of the 12/5/2016. The text is available under the Creative Commons Attribution/Share Alike but additional terms may apply for the media files.