Williamsdale, Australian Capital Territory

Williamsdale
Australian Capital Territory
Williamsdale
Coordinates 35°34′S 149°08′E / 35.567°S 149.133°E / -35.567; 149.133Coordinates: 35°34′S 149°08′E / 35.567°S 149.133°E / -35.567; 149.133

Williamsdale is a village on the New South Wales - Australian Capital Territory border in Australia on the Monaro Highway. The postcode is 2620. The former Bombala railway line passes through the village and a railway station saw service until 1975.

Geology

To the east of Williamsdale is the Williamsdale Volcanics. These are made up from blue-green crystal tuff. The crystals are sized from 0.3 mm to 1 mm and are embedded in a fine matrix. Quartz crystals make up 25%, plagioclase 5%, alkali feldspar 10%, biotite 5-10% which is altered to chlorite, epidote and leucoxene.

Middle Silurian Colinton Volcanics foliated dacite and tuff is under Williamsdale. A roughly north south band of these acid volcanics extends to the north along the Monaro Highway and then follows the Cooma road to Cottondale. South the volcanics also follow the Monaro Highway in a more complex band through Colinton past Michelago and at least as far south as Bredbo.

To the west of Williamsdale is an outcrop of Upper Silurian Laidlaw Volcanics dark grey rhyodacitic and dacitic crystal tuff. This extends to the west as far as Angle Crossing. This band extends to the north north west as far as Mount Stromlo. The outcrop finishes a couple of kilometres south, but it is also found to the east, with outcrop from Fernleigh in the north, via Burra, and south to Michelago.

On the west side of the Murrumbidgee River around Angle Crossing can be found the Bransby Beds or Goosoon Beds. These beds contain tuff and dacite with some sediments. They form a narrow band extending to the south as far as Cooma following on the east side of the Murrumbidgee River.[1]

Airport proposal

In response to increasing operating costs for general aviation users of Canberra Airport, a proposal was made by the ACT Government in 2005 to develop a dedicated secondary airfield for the Territory.[2] The site recommended was to the west of the Monaro Highway at Williamsdale, and would include aircraft hangars, maintenance and fuel facilities, and a 1000m grass runway. A feasibility study was undertaken by Deloitte Access Economics in 2010. Based on the results of this study, the project anticipated marginal returns on the capital investment required, despite significant demand for such a facility.[3] As of 2012, the ACT government has declined to develop the facility, but has made the cost benefit analysis and feasibility study reports available should private enterprise wish to consider the project.

Solar farm

In September 2012, utilities provider ActewAGL was granted an exemption by the ACT Government from having to conduct a further Environmental impact assessment on a plan to construct a 45ha electricity generation facility consisting of 15 photovoltaic solar arrays with a total generating capacity of 20 megawatts and associated infrastructure adjacent to the Monaro Highway at Williamsdale.[4] The land to be occupied by the proposed solar farm was acquired by ActewAGL in 2009,[5] and was considered preferable to an alternative site in the West Belconnen district.[6]

The project was later reduced in scope to 11.8 megawatts. It was approved in January 2016 by the ACT Planning Minister, Mick Gentleman.[7] Subsequently, Elementus Energy which had owned the project sold it to a subsidiary of Melbourne-based Impact Investment Group, and the German company ib vogt GmbH was contracted for the construction.[8] The first solar panel was installed in October 2016.[9]

References

  1. Henderson, G. A. M.; Matveev, G. (1980). Geology of Canberra, Queanbeyan and Environs (Map). 1:50000.
  2. "Williamsdale Airfield". Economic Development Directorate (ACT). 21 March 2012. Retrieved 27 May 2012.
  3. "Williamsdale Airfield Cost Benefit Analysis" (PDF). Deloitte Access Economics. 2011. Retrieved 27 May 2012.
  4. "Willamsdale Solar Facility Application for s211 Exemption Consideration Report" (PDF). ACT Government. September 2012. Retrieved 28 January 2013.
  5. "ACTEW land an option for ACT Solar Farm". ACTEW Water. 16 April 2009. Retrieved 28 January 2013.
  6. Towell, N (22 January 2013). "Push for capital's second solar farm". The Canberra Times. Retrieved 28 January 2013.
  7. McIlroy, Tom (29 January 2016). "Solar farm approved for Williamsdale". Canberra Times. Retrieved 26 October 2016.
  8. Raggatt, Matthew (12 June 2016). "Tree felling continues after Elementus sells Williamsdale solar farm". Canberra Times. Retrieved 26 October 2016.
  9. Connery, Georgina (25 October 2016). "One down, 34,999 photovoltaic panels to go at Williamsdale Solar Farm". Canberra Times. Retrieved 26 October 2016.
This article is issued from Wikipedia - version of the 10/27/2016. The text is available under the Creative Commons Attribution/Share Alike but additional terms may apply for the media files.