Coordinates | 51°56′N 14°32′E / 51.933°N 14.533°ECoordinates: 51°56′N 14°32′E / 51.933°N 14.533°E |
Construction began | August 2011 |
Commission date | October 2011 |
Construction cost | 58 million euros |
Solar field | |
Type | Flat-panel PV |
Site area | 75.9 hectares (187.6 acres) |
Power generation | |
Nameplate capacity | 30.2 MW |
Average generation | 27.68 GWh |
The Cottbus-Drewitz Solarpark is a 30.2-megawatt (40,500 hp) photovoltaic power station, located on a former military airfield. It was completed in 11 weeks using Suntech STP 280 Wp panels.[1][2][3]