Glenelg tram

"Adelaide tram" redirects here. For the history of Adelaide's tram network, see Trams in Adelaide.
Glenelg Tram

Citadis 302 and Flexity Classic trams at the Adelaide Entertainment Centre terminus
Overview
Locale Adelaide, South Australia
Termini Adelaide Entertainment Centre, Hindmarsh
Moseley Square, Glenelg
Services
  • Every 5-10 mins (Peak)
  • Every 10 mins (Weekday)
  • Every 10 mins (Saturday)
  • Every 15 mins (Sunday)
  • Every 20 mins (Night)
Operation
Opened 1873 (1873)
Rolling stock
Events
Re-sleepered (concrete) 2005
Electrified 1929
Technical
Line length 15 km (9.3 mi)
Number of tracks Double track
Track gauge 1,435 mm (4 ft 8 12 in)
Route map

Outer Harbor line
Cancelled extension
Entertainment Centre
River Torrens
Bonython Park
Thebarton
Port Road Crossing
West Terrace
0.0 City West
Morphett Street
0.4 Adelaide railway station
0.9 Rundle Mall
1.3 Pirie Street
1.5
Victoria Square/
Tarndanyangga
1.9 City South
2.3 South Terrace
South Parklands Turnback
2.9 Greenhill Road
3.8 Wayville
4.3 Goodwood Road
Goodwood Station
Belair and Seaford lines
5.2 Forestville
5.7 Black Forest
6.2 South Road
6.7 Glandore
7.1 Beckman Street
7.7 South Plympton
8.0 Marion Road
8.9 Plympton Park
9.5
Morphettville Racecourse
Race days only
9.9 Morphett Road
Glengowrie Depot
Sturt River
10.5 Glengowrie
11.2 Glenelg East
Glenelg
11.5 Brighton Road
11.9 Jetty Road
12.3 Moseley Square
Gulf St Vincent

The Glenelg tram is a 15-kilometre (9.3 mi) light rail line in South Australia running from Hindmarsh, through the Adelaide city centre, to the beach-side suburb of Glenelg. It is Adelaide's only remaining tramway.

The service is free between the Adelaide Entertainment Centre in Hindmarsh and South Terrace in the City, and along the entire length of Jetty Road, Glenelg. Apart from short street-running sections in Adelaide city centre and Glenelg, the line has its own reservation, with minimal interference with road traffic.

A 1.6 kilometre northern extension through the city centre opened on 14 October 2007 This extended the line from Victoria Square along King William Street and North Terrace to Morphett Street. A further 2.8 kilometre north western extension of the line along Port Road to the Adelaide Entertainment Centre opened on 22 March 2010. A 1 kilometre branch line along the eastern end of North Terrace was announced in 2016.

History

Inception

Eureka Steam Motor purchased second-hand from Port Adelaide and Queenstown Tramway Company in April 1883. Used on South Terrace Line between South Terrace and Goodwood.

The route was built in 1873 by a private company, the Adelaide, Glenelg & Suburban Railway Company Ltd. The original line had a very different character to today’s route.

Patronage during the first few years of operation rose from 468,000 in the first year (1873-4) to 727,000 in 1877-8.[2]

The last day a steam train ran up King William Street in 1914

In December 1899 the private company was acquired by the state government-controlled South Australian Railways (SAR), who continued to operate the line as a steam railway for the next 30 years or so. In 1914, the railway’s terminus was cut back from the edge of Victoria Square (in the centre of Adelaide) to South Terrace on the city’s southern fringe. Passengers had to transfer to electric trams to complete their journey into the city.[3]

Municipal Tramways Trust

The electric tram network in the late 1950s

In 1929 ownership and operation transferred from the SAR to Adelaide’s Municipal Tramways Trust (MTT). Steam trains ceased on 2 April 1929 and the line was closed to be rebuilt to standard gauge, electrified at 600 V dc and converted to tramway operation.[4] The Goodwood flyover was constructed at this time, separating the new tram tracks from the conventional railway.[5]

Thirty H class trams were built for the line, with a design influenced by North American interurban cars of that era. The line re-opened on 14 December 1929, with the city terminus reverting to Victoria Square.

There were one or two quirks in the earlier years, the most famous being the “horse trams” operated in the 1930s. These were trams specially constructed to carry race horses from stables located along the line to the racecourse at Morphettville. This service was a carry-over from the days of the steam railway, which had also performed this function. Another unusual feature was operation of triple sets of H-class trams in peak hours, and express trams that ran non-stop over a significant portion of the route. In 2006, only one express service remained.

The line was the only route to survive the closure of Adelaide’s street tramway network during the 1950s, saved largely by its high proportion of reserved track, which enables fast journey for passengers and minimal interference with road traffic.

In the mid-1970s around 3,000 trips to the city were made "on an average day".[6] The line's depot relocated 1986, moving from the corner of Angas Street and Victoria Square in central Adelaide to a new facility at Glengowrie, close to Glenelg.

Renaissance

H class trams provided services on the line for more than 70 years. Two trams wait at the Moseley Square terminus prior to the reconfiguration of the stop.
The Flexity Classics were introduced in 2006.

In the 21st century, a series of investments were made to improve and extend the line. This began in May 2003 when the South Australian Government announced an upgrade of the Glenelg line infrastructure and the introduction of new trams.

Major work to upgrade the line took place between 5 June and 7 August 2005. Concrete sleepers were installed and much of the track renewed in an intensive nine-week project. Most of the 21 tram stops were reconstructed with higher platforms to allow level access to the new low-floor trams. The overhead electrical supply was upgraded and some minor modifications were made to the H-class cars and Glengowrie depot. Tram services were replaced with substitute bus services during this period. Tram services resumed on 8 August 2005. The terminus at Moseley Square, Glenelg was reconfigured in September 2005 as part of a general redevelopment of the square.

City centre extension

Minister for Transport Patrick Conlon & Premier Mike Rann open the City West Extension on 14 October 2007
Adelaide railway station tram stop is typical of stops on the city centre extension

The South Australian Government announced a 1.2 kilometre extension from Victoria Square along King William St. to Adelaide railway station on 6 April 2005. An additional two Flexity Classic trams were ordered (for a total of 11) to cater for services on the city centre extension.

Construction work on the extension commenced in early 2007. A new Victoria Square stop opened on 6 August 2007. The stop moved from the centre of the square to the western side. Testing of the extension began in September 2007.

The extension opened on 14 October 2007. Initially, a shuttle service running between Victoria Square and City West tram stop was provided. Normal services continued to run between Victoria Square and Glenelg. A new timetable began on 15 October 2007 with through services from Glenelg to City West and a free shuttle service between South Terrace and City West.

South Road Overpass

An overpass crossing South Road was announced in the 2007 South Australian Budget. The project was built in conjunction with the Anzac Highway Underpass.[7] Construction started in July 2009 and was due to be completed by the end of 2009. In December 2009, the overpass opened to allow trams to pass over it, however the South Road tram stop was not operational until 15 March 2010.

Adelaide Entertainment Centre extension

The Entertainment Centre stop

A $100 million extension to the Adelaide Entertainment Centre was announced in the 2008 South Australian Budget.[8] Planning commenced soon after and the state cabinet approved the extension in November 2008.[9]

Construction work began on 11 May 2009.[10] Testing began in February 2010 and the extension opened on 15 March 2010.

Patronage

The following table lists patronage figures for the network (in millions of journeys) during the corresponding financial year. Australia's financial years start on 1 July and end on 30 June. Major events that affected the number of journeys made or how patronage is measured are included as notes.

2001-02[11] 2002-03[11] 2003-04[12] 2004-05[12] 2005-06[13] 2006-07[14] 2007-08[15] 2008-09[16] 2009-10[17]
2.07 2.08 2.16 2.10[note 1] 2.07[note 2] 1.88 2.06[note 3] 2.11 2.42[note 4]
2010-11[18] 2011-12[19] 2012-13[20] 2013-14[21] 2014-15[22] 2015-16[23]
2.63 2.42 2.27 2.29 8.88[note 5] 8.89
  1. Line closed for upgrade during June 2005
  2. Line closed for upgrade during July 2005
  3. City Centre extension opened in October 2007
  4. Entertainment Centre extension opened in March 2010
  5. All free travel included (previously only seniors free travel was included)

Controversy

Due to the increased popularity of the service beyond the city after the extension,[24] the trams service dramatically exceeded its capacity, with over 100,000 extra trips for the three months from November 2007, compared the same period the previous year. This resulted in intensive overcrowding on board the trams, and many passengers were unable to board trams during peak hours.[25] The extension of the tramway along King William Street and North Terrace was blamed by critics for increased congestion within the centre of Adelaide, but no actual evidence of this occurring was identified.[26]

There have been a small number of minor derailments along the tramway, including one on Melbourne Cup Day, 6 November 2007.[27][28] On several occasions, some Flexity trams experienced breakdown problems.[29]

Fleet

Flexity Classic

Main article: Flexity Classic

A contract for delivery of nine new Flexity Classic trams was awarded to Bombardier on 21 September 2004. The first Flexity tram (101) arrived in Adelaide on 22 November 2005. Following a period of commissioning and staff training, the first two Flexity trams (101 and 102) entered service on 9 January 2006. A further two trams were added to the order, followed by another four as part of the Adelaide Entertainment Centre extension, entering service in 2011. Numbered 101-115, all were built by Bombardier Transportation in Germany.

Citadis 302

Former Metro Ligero de Madrid Citadis tram 202 at the Moseley Square terminus
Main article: Citadis

In May 2009 the State Government purchased six Citadis 302 five car trams for $36 million. Manufactured by Alstom in France, they had been ordered for the Metro Ligero de Madrid system in Madrid, Spain, but became surplus following the line they were ordered for being scaled back.[30][31]

The trams were delivered in two separate batches of three to Australia being landed in Melbourne on 9 September 2009 and 10 November 2009 for modifications at Preston Workshops before being moved by road to Adelaide.[32] Delivered as Metro Ligero de Madrid's 165-170, they were renumbered 201-206 by TransAdelaide.

H class

Refurbished H types 370 and 380 at the former City West terminus, January 2009
Main article: H class Adelaide tram

Until January 2006, 1929-vintage H class trams provided all services on the Glenelg line. These trams were built for the electrification of the Glenelg line and have many of the characteristics of American "interurban" cars of the same period. Thirty H class trams were built by a local manufacturer, A. Pengelley, with road numbers 351 - 380.

The H-class cars were progressively updated during the 1970s, again in the late 1980s and most recently (on five trams) in 2000. These included toughened safety glass in windows, replacing wooden panels with fibreglass, upgrading bogies, fluorescent lights inside the cars, and sealed-beam headlights and brake/hazard lamp clusters outside. In 1986 the trams were converted from trolley pole to pantograph operation. Despite the various refurbishments and upgrades, the overall character of the H-class trams has stayed very much as they were built. The interiors are still varnished wood and glass etched with MTT logos, and with no heating or air conditioning. Any remaining services are crew operated, with a driver and conductor on single cars, or a driver and two conductors on two-car sets.

The H-class were the longest rigid-body trams remaining in service in Australia, and the second-longest ever built. They travelled in pairs during peak times, and with the retirement of the W2 trams from Melbourne's network were the oldest passenger trams in service in Australia.[33]

Five refurbished H-class trams are still in the fleet. They operated a restricted 'heritage service' timetable on Saturdays, Sundays and Public Holidays. The H class trams are currently not in use but are stored at the depot awaiting a decision on their future. They have been fitted with safety measures similar to those of the new trams, including vigilance control and electro-magnetic track brakes. The retained H-class trams are numbers 351, 367, 374 and 380. Three of the trams are currently stored near Tonsley.

Planned East End extension

After a lobbying campaign from businesses and institutions located in the area, a $50 million one-kilometre branch along the eastern section of North Terrace was announced in 2016 South Australian Budget.[34][35][36] The extension will enable the creation of shuttle service between the old Royal Adelaide Hospital and the Adelaide Entertainment Centre. Services will operate every ten minutes.[37]

Proposed extensions

Several extensions to the network have been proposed under a program called AdeLINK. A report analysing the route options was released in 2016. Six routes would radiate from the Adelaide city centre and one would form a city centre loop. The routes are:[38]

PortLINK is the most complex of the proposals, as it involves making decisions on the future of the Outer Harbor and Grange railway lines. The report proposes several different options for these lines. They could be electrified but remain as heavy rail, or they could be converted to light rail - with potential spurlines added to West Lakes and Semaphore. Light rail options for the Grange railway line include converting the entire line to light rail, diverting it to West Lakes and closing the section beyond Albert Park station, or replacing it with new on-street routes to Grange and West Lakes. The PortLINK routes are very similar to a group of light rail extensions to West Lakes, Port Adelaide and Semaphore that were announced in the 2008 South Australian Budget but then scrapped in the 2012 budget.[8][39]

See also

References

  1. The 'Eureka' Steam Motor of South Australia Eardley, Gifford Australian Railway Historical Society Bulletin, February 1974 pp27-29
  2. "MITCHAM TRAMWAY.". South Australian Chronicle and Weekly Mail (Adelaide, SA : 1868 - 1881). Adelaide, SA: National Library of Australia. 7 September 1878. p. 2 Supplement: SUPPLEMENT TO THE SOUTH AUSTRALIAN CHRONICLE. Retrieved 11 February 2015.
  3. "GLENELG RAILWAY.". The Register (Adelaide). LXXIX, (21,078). South Australia. 2 June 1914. p. 13. Retrieved 13 June 2016 via National Library of Australia.
  4. "RAILWAY TO GLENELG". Barrier Miner. XLI, (12,371). New South Wales, Australia. 12 January 1929. p. 1. Retrieved 13 June 2016 via National Library of Australia.
  5. "Tramway Bridge at Goodwood". The Register News-Pictorial. XCIV, (27,379). South Australia. 16 May 1929. p. 31. Retrieved 13 June 2016 via National Library of Australia.
  6. Madigan, J.F. (1977), The Pedestrian Network in the Adelaide Core Area (PDF), p. 7, retrieved 11 February 2015
  7. "Glenelg Tram Overpass". Department of Transport, Energy and Infrastructure. Retrieved 2009-10-14.
  8. 1 2 "2008 State Budget". South Australian Department of Treasury and Finance. 5 June 2008. Retrieved 2008-06-06.
  9. "Cabinet gives new tramline extension green light". Government of South Australia. 27 November 2008. Retrieved 2008-12-01.
  10. "Tram extension works start". The Advertiser/AdelaideNow. 8 May 2009. Retrieved 2009-05-12.
  11. 1 2 "TransAdelaide - Replacement Pages - Rail Patronage - Report 2002-2003" (PDF). Parliament of South Australia. 4 December 2003. Retrieved 13 October 2016.
  12. 1 2 "TransAdelaide Annual Report 2004-05" (PDF). TransAdelaide. p. 11. Retrieved 13 October 2016.
  13. "TransAdelaide Annual Report 2005-06" (PDF). TransAdelaide. p. 22. Retrieved 13 October 2016.
  14. "DTEI Annual Report 2006-07" (PDF). Department for Transport, Energy and Infrastructure. p. 70. Retrieved 13 October 2016.
  15. "DTEI Annual Report 2007-08" (PDF). Department for Transport, Energy and Infrastructure. p. 121. Retrieved 13 October 2016.
  16. "DTEI Annual Report 2008-09" (PDF). Department for Transport, Energy and Infrastructure. p. 118. Retrieved 13 October 2016.
  17. "DTEI Annual Report 2009-10" (PDF). Department for Transport, Energy and Infrastructure. p. 75. Retrieved 13 October 2016.
  18. "DTEI Annual Report 2010-11" (PDF). Department for Transport, Energy and Infrastructure. p. 62. Retrieved 13 October 2016.
  19. "DPTI Annual Report 2011-12" (PDF). Department of Planning, Transport and Infrastructure. p. 68. Retrieved 13 October 2016.
  20. "DPTI Annual Report 2012-13" (PDF). Department of Planning, Transport and Infrastructure. p. 78. Retrieved 13 October 2016.
  21. "DPTI Annual Report 2013-14" (PDF). Department of Planning, Transport and Infrastructure. p. 88. Retrieved 13 October 2016.
  22. "DPTI Annual Report 2014-15 - Transport Acts". Department of Planning, Transport and Infrastructure. Retrieved 13 October 2016.
  23. "DPTI Annual Report 2015-16" (PDF). Department of Planning, Transport and Infrastructure. p. 63. Retrieved 1 December 2016.
  24. Williams, Matt (16 February 2008). "On track for future extension". The Advertiser - News Corporation. Retrieved 2008-02-19.
  25. Novak, Lauren (9 January 2008). "Trams may be s-t-r-e-t-c-h-e-d to beat overcrowding". The Advertiser - News Corporation. Retrieved 2008-02-19.
  26. "Authorities deny tram causing congestion". ABC News. Retrieved 2008-02-19.
  27. "Double Derailment at Glengowrie". Sensational Adelaide. Retrieved 2008-02-19.
  28. Robertson, Doug; Owen, Michael (1 November 2007). "Tram commuters to Glenelg face derailment delays". The Advertise - News Corporation. Retrieved 2008-02-19.
  29. Owen, Michael (12 November 2007). "TransAdelaide gutted as another tram breaks down". The Advertiser - News Corporation. Retrieved 2008-02-19.
  30. Castello, Renato (24 May 2009). "European trams to bolster our City-Glenelg fleet". The Adelaide Advertiser. Retrieved 27 October 2013.
  31. Fenton, Andew (7 June 2009). "Six new trams for Adelaide-ex-Madrid". The Adelaide Advertiser. Retrieved 27 May 2014.
  32. "Photos of Madrid tram at Preston". Trams Down Under archive. 10 September 2009."Another Madrid Citadis". Trams Down Under archive. 11 November 2009."Madrid tram to Adelaide". Trams Down Under archive. 11 November 2009.
  33. Hoadley, David (18 January 1996). "Type H". Retrieved 2007-08-03.
  34. Starick, Paul (14 May 2016). "Rundle Mall, museum, universities and Adelaide Lord Mayor push for East End tram extension". The Advertiser.
  35. "STATE BUDGET 2016/17: $50m AdeLINK tram extension to the East End". Government of South Australia. 5 July 2016.
  36. "SA budget 2016: Adelaide tramline to be extended to East End". ABC News Online. Australian Broadcasting Corporation. 5 July 2016.
  37. "Tram extension to deliver major boost for Adelaide's universities". Government of South Australia. 6 July 2016. Retrieved 25 August 2016.
  38. "AdeLINK Multi-Criteria Analysis Summary Report" (PDF). Department of Transport, Planning and Infrastructure. 2016. pp. 10–19.
  39. "Port, Semaphore tramline derailed in State Budget". The Advertiser/AdelaideNow. 8 May 2009. Retrieved 2014-10-07.

External links