Line 11, Shenzhen Metro
Line 11, Shenzhen Metro | |
---|---|
The interior of a Business Class carriage | |
Overview | |
Type | Rapid transit |
System | Shenzhen Metro |
Status | Operational |
Locale | Shenzhen, China |
Termini |
Futian Bitou |
Stations | 18 |
Operation | |
Opened | 28 June 2016 |
Operator(s) | SZMC (Shenzhen Metro Group) |
Character | Underground and elevated |
Technical | |
Line length | 51.7 km (32.12 mi) |
Number of tracks | 2 |
Track gauge | 1,435 mm (4 ft 8 1⁄2 in) |
Electrification | Overhead Line, 1,500 V DC |
Operating speed | 120 km/h |
Line 11 of the Shenzhen Metro (simplified Chinese: 十一号线; traditional Chinese: 十一號線; pinyin: Shíyī hào xiàn; Jyutping: Sap6 Jat1 Hou6 Sin3) (also known as the Airport Line; 机场线; 機場線; Jīchǎng xiàn; Gei1 Coeng4 Sin3) opened on 28 June 2016.[1] Line 11 has a length of 51.7 km and a total of 18 stations. It connects the CBDs of Futian, Nanshan and Qianhai to Shenzhen Bao'an International Airport and onward to Fuyong, Shajing and Songgang suburban areas. It serves as both a regional express line from the west coast of Shenzhen to the city core area and an airport rail link.[2] Compared with the other lines of Shenzhen Metro, Line 11 has a longer spacing between stops for a higher speed service. Trains of Line 11 run at 120 km/h, up to 50% faster than other lines.[3] Construction of Line 11 started in April 2012 and test running begun at the end of March 2016. Trains run at a 10-minute frequency and take half an hour to travel from Futian to the Airport.[4]
History
In 2007, the "Shenzhen City Rail Transit Construction Plan (2011 to 2020)" was publicly announced for the first time, which included the plans for Line 11.[2] In the future, Line 11 will link into the Guangzhou-Dongguan-Shenzhen intercity line.[5]
Rolling stock
The airport line will use 33 sets of Size A subway trains in eight car sets (no. 1101-1133) with a maximum speed of 120 km/h, including two six standard class carriages and two Business Class carriages. On 4 July 2015, the first train completed eight months of commissioning work,[6] and 10 trains have been delivered from CRRC Zhuzhou as of March 2016. The maximum train capacity is 2564 people.
Business Class
Business Class has transverse seating and curtains[7] for comfort and luggage racks for airport passengers.[8] To ride Business Class passengers have to pay a premium for their ticket, similar to First Class on the MTR East Rail Line. Business Class carriages are marked by dark grey floor tiles and yellow panels above the platform screen doors. Standard class carriages are marked by light grey floor tiles and white panels above the doors.[9]
Fares
Two kinds of fares are charged on Line 11. In standard class, the fare is equivalent to other metro lines. Business Class is three times as expensive as standard class. Standard class fares range between 2 and 10 yuan, with Business Class ranging between 6 and 30 yuan. Because of the possibility of transfers, this makes the maximum possible fare on the Shenzhen Metro 35 yuan. Business Class can be accessed through placing the Shenzhen Tong on a validator or through purchasing a yellow token (standard tokens are green).[10]
Stations
Station name
English |
Station name | Transfer | District |
---|---|---|---|
Bitou | 碧头 | Bao'an | |
Songgang | 松岗 | ||
Houting | 后亭 | ||
Shajing | 沙井 | ||
Ma'an Hill | 马安山 | ||
Tangwei | 塘尾 | ||
Qiaotou | 桥头 | ||
Fuyong | 福永 | ||
Airport North | 机场北 | ||
Airport | 机场 | Shenzhen Bao'an International Airport | |
Bihaiwan | 碧海湾 | ||
Bao'an | 宝安 | ||
Qianhaiwan | 前海湾 | 1 5 | Nanshan |
Nanshan | 南山 | ||
Houhai | 后海 | 2 | |
Hongshuwan South | 红树湾南 | 9 | |
Chegongmiao | 车公庙 | 1 7 9 | Futian |
Futian | 福田 | 2 3 Futian Railway Station | |
Planned Extension
Line 11 is planned to have an east extension to Grand Theatre Station. It will run along with Line 14 in the future.
Station name
English |
Station name | Transfer | Location |
---|---|---|---|
Gangxia North | 岗厦北 | 2 10 14 , Gangxia Station for 1 | Futian |
Shanghai Hotel | 上海宾馆 | ||
Grand Theater | 大剧院 | 2 1 5 , Hongling South Station for 9 | Luohu |
References
- ↑ 王念. "深圳地铁11号线28日起试运营 11点后可购票体验_广州日报大洋网". news.dayoo.com. Retrieved 2016-06-28.
- 1 2 轨道交通近期建设线路线站位初步方案 (in Chinese). 深圳市规划和国土资源委员会. July 9, 2007.
- ↑ "深圳地铁11号线动态新闻". weibo.com. Retrieved 2016-06-11.
- ↑ "#新线online# #深圳地铁11号线#". www.weibo.com. Retrieved 2016-06-11.
- ↑ "深圳市轨道交通规划简要报告(3)". February 21, 2008.
- ↑ "#新线online# #深圳地铁11号线#". www.weibo.com. Retrieved 2016-06-11.
- ↑ "#新线online# #深圳地铁11号线#". www.weibo.com. Retrieved 2016-06-11.
- ↑ "11号线从中心区到机场不超半小时". 深圳特区报. April 24, 2012.
- ↑ "新线直击 | 这个"庙"好特别". www.weibo.com. Retrieved 2016-06-11.
- ↑ "新线直击 | 商务车厢乘车指引get√".