Line 5, Shenzhen Metro
Line 5, Shenzhen Metro |
---|
|
|
Overview |
---|
Type |
Rapid transit |
---|
System |
Shenzhen Metro |
---|
Status |
Operational |
---|
Locale |
Shenzhen, China |
---|
Termini |
Qianhaiwan Huangbeiling |
---|
Stations |
27 |
---|
Services |
1 |
---|
Operation |
---|
Opened |
22 June 2011 |
---|
Operator(s) |
SZMC (Shenzhen Metro Group) |
---|
Character |
Underground |
---|
Technical |
---|
Line length |
40.00 km (24.85 mi) |
---|
Number of tracks |
2 |
---|
Track gauge |
1,435 mm (4 ft 8 1⁄2 in) |
---|
Operating speed |
80 km/h |
---|
|
Line 5 (Huanzhong) (simplified Chinese: 五号线; traditional Chinese: 五號線; pinyin: Wǔhào Xiàn; Jyutping: Ng5 Hou6 Sin3), also known as Huanzhong Line(环中线; 環中線; Huánzhōng xiànj=Waan4 Zung1 Sin3), of the Shenzhen Metro runs from Qianhaiwan to Huangbeiling forming an arc around central Shenzhen. It opened on 22 June 2011. Average daily ridership exceeds 500,000 people.[1] 653,100 passengers used the line on 5 May 2014, setting a new record.[2]
Current Stations
Rolling Stock
References
Public transportation in Eastern Pearl River Delta |
---|
|
Shenzhen Metro
| Lines in operation | |
---|
| Under construction |
- 2 (Phase III)
- 3 (Phase III)
- 4 (Phase III)
- 5 (Phase II)
- 6
- 8
- 9 (Phase II)
- 10
|
---|
| Under planning |
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
|
---|
|
---|
|
Dongguan Rail Transit
| Lines in operation | |
---|
| Under construction | |
---|
| Under planning | |
---|
|
---|
|
Hong Kong MTR
| Lines in operation | |
---|
| Under construction | |
---|
| Under Planning | |
---|
|
---|
|
Other Urban Rails/Cableways | Lines in operation | |
---|
| Under construction | |
---|
|
---|
|
Intercity Rails (PRD-RT) | Lines in operation | |
---|
| Under construction | |
---|
|
---|
|
Transportation Hubs | Airport | |
---|
| Railway stations | |
---|
| Ferry | |
---|
|
---|
|
- China transit: JJJ
- YRD
- Shanghai
- Jiangsu
- Zhejiang
- PRD
- Chengyu
- Wuhan
- Dalian
|
|
---|
|
|
|
Future development |
---|
| Line 1 | |
---|
| Line 3 | |
---|
| Line 4 |
- (towards Futian Checkpoint) Qinghu
- Qinghua
- Zhucun
- Centurial Square West
- Jiangwei New Village
- Guanlan Centre
- Songyuan
|
---|
| Line 5 | |
---|
| Line 6 |
- Shenzhen North
- Hongshan
- Shangtang
- Shaping
- Shilong Park
- Baoshi East Rd.
- Tianxin
- Guangming High-Tech Area
- Guanguang Rd.
-
Guangming < | Guangming New City
- Longda Highway
- Gongming Chinese-English School
- Gongming Square
- Xiacun
- Gongming West
- Shanmen
- Songgang Hospital
- Songgang
| Zhenmei Rd. |
|
---|
| Line 8 |
- Liantang
- Wutongshan
- Shatoujiao
- Haishan
- Yantian Port
- Shenwai
- Yantian
|
---|
| Line 12 |
- Songgang
- Gonghe Village
- Shajing 3rd Village
- Shajing West
- Western Industrial City
- Shajing South
- Fuqiao Industrial Zone
- Fuyong North
- Airport North
- Xiashiwei
- Airport East
- Xinghua
- Zhongwu Village
- Taoyuan
- Baotian
- Chentian
- Liutang
- Shangchuan
- Lingzhi
- Bao’an Middle School
- Nantou
- Taoyuan
- Guimiao
- Chuangye Rd.
- Lixiang
- Sihai
- Gongye 6th Rd.
- Sea World
|
---|
| Line 16 |
- Universiade
- Longxiang Ave.
- Longcheng West
- Tianbantou
- Tianlongpu
- Longgang Bus Station
- Heaven Vigor Garden
- Longcheng Mid Rd.
- Longyuan Rd.
- Shuanglong
- Longnan
- Longdong Village Comm.
- Tongle Village
- Shenzhen East
- Pingshan Primary School
- Pingshan Middle School
- Dongzong
- Xinwu
- Zhukang
- Yuanlingzi
- Donglian
- Kangzi
- Xinqiao Industrial Zone
|
---|
| Long-term planning |
Line 13 |
Line 14 |
Line 15 |
Line 10 |
Waterlands Resort towards Kangzi |
Futian towards Kangzi |
Qianhai Road towards Shiyan |
Futian towards Pinghu | |
---|
| Stations that are proposed, under planning or under construction are shown in italics with gray font color. |
|
|
■: Interchange for the numbered line. Line 7 and Line 9 will open on 28 December 2016. |