Smethwick Galton Bridge railway station
Smethwick Galton Bridge | |
---|---|
Smethwick Galton Bridge high-level. | |
Location | |
Place | Smethwick |
Local authority | Sandwell |
Grid reference | SP014893 |
Operations | |
Station code | SGB |
Managed by | London Midland |
Number of platforms | 4 (2 high level, 2 low level) |
DfT category | E |
Live arrivals/departures, station information and onward connections from National Rail Enquiries | |
Annual rail passenger usage* | |
2010/11 | 0.344 million |
2011/12 | 0.495 million |
2012/13 | 0.516 million |
2013/14 | 0.561 million |
2014/15 | 0.577 million |
Passenger Transport Executive | |
PTE | Transport for West Midlands |
Zone | 2 |
History | |
1995 | Opened |
National Rail – UK railway stations | |
* Annual estimated passenger usage based on sales of tickets in stated financial year(s) which end or originate at Smethwick Galton Bridge from Office of Rail and Road statistics. Methodology may vary year on year. | |
UK Railways portal |
Smethwick Galton Bridge is a split-level railway station in Smethwick, West Midlands, England. It is at a point where two railways lines cross on two levels. It has platforms on both lines, allowing interchange between them. The two low-level platforms serve the Birmingham New Street to Wolverhampton Line, while the two high-level platforms serve the Birmingham Snow Hill to Worcester Line. The high level line passes over the low level line at a right angle on a bridge. London Midland manage the station and operate the majority of its services, with others provided by Chiltern Railways and Arriva Trains Wales.
It is an important interchange; 461,664 people changed trains at the station during 2014/15.[1]
History
The station was opened in September 1995 as part of the Jewellery Line scheme to reopen the line between Smethwick and Birmingham Snow Hill station. It was built as an interchange station between two lines, and the platforms on both lines opened at the same time. It is named after the adjacent Galton Bridge. Upon opening, the nearby Smethwick West station became redundant and was closed soon after.[2]
Services
There are 4 platforms at Smethwick Galton Bridge. Platforms 1 & 2 are on the Birmingham - Worcester line, whilst Platforms 3 & 4 are on the Birmingham - Wolverhampton line.
High-level
London Midland provide most of the passenger services, on the high level platforms they offer 6 tph (trains per hour) between Birmingham Snow Hill and Stourbridge Junction using their Class 172 Turbostar DMUs, of these, 4tph continue past Stourbridge to Kidderminster, and two of these continue to either Worcester Shrub Hill and/or Worcester Foregate Street, with some services continuing to Great Malvern.[3] In the opposite direction, 3tph extend beyond Snow Hill to Dorridge and 3tph Whitlocks End, with 1tph each from Dorridge and Whitlocks End extending to Stratford-Upon-Avon.
Chiltern Railways also offer morning peak services to London Marylebone on the Chiltern Mainline with return journeys in the other direction in the evening, usually terminating at Kidderminster.
On Sundays, the level of service drops to 1tph between Dorridge and Stourbridge Junction and another tph between Stratford-Upon-Avon (via Whitlock's End) and Worcester stations, providing 2tph for Smethwick Galton Bridge between Birmingham Snow Hill and Stourbridge Junction.
Low-level
London Midland also provide the majority of the services on the lower level platforms. A half-hourly local stopping service between Birmingham New Street and Wolverhampton operated by Class 323 and Class 350 EMUs, calls at all stops between Birmingham and Wolverhampton, with most trains continuing to Walsall after Birmingham New Street. An hourly long distance service to Liverpool Lime Street run by London Midland also calls, originating at Birmingham New Street operated by Class 350 EMU. Arriva Trains Wales operates an hourly semi-fast service to Shrewsbury and then either Chester/Holyhead or Aberystwyth and Pwllheli (alternate hours) using their Class 158 DMU units, and to Birmingham International in the opposite direction, providing Smethwick Galton Bridge with a direct rail link to Birmingham International Airport. These services combined provide the station 4tph to Birmingham New Street and Wolverhampton.[4]
On Sunday, the level of service drops to an hourly local service between Birmingham New Street and Wolverhampton, stopping at all stations on the line, and an hourly long distance service between Birmingham New Street and Liverpool Lime Street, providing Smethwick Galton Bridge with 2tph to both Wolverhampton and Birmingham New Street.
References
- ↑ "Station usage - : Office of Rail Regulation".
- ↑ "Smetwick Galton Bridge, 1995 present". Rail around Birmingham & the West Midlands. Retrieved 5 June 2016.
- ↑ GB eNRT December 2015 Edition, Table 71
- ↑ GB eNRT December 2015 Edition, Table 68 & 75
External links
Wikimedia Commons has media related to Smethwick Galton Bridge railway station. |
- Train times and station information for Smethwick Galton Bridge railway station from National Rail
- Rail Around Birmingham and the West Midlands: Smethwick Galton Bridge station
Coordinates: 52°30′08″N 1°58′49″W / 52.50222°N 1.98028°W