Line 8, Shenzhen Metro

Line 8, Shenzhen Metro
Overview
Type Rapid transit
System Shenzhen Metro
Status Under Construction
Locale Shenzhen, China
Termini Liantang
Yantian
Stations 6
Operation
Planned opening 2020
Operator(s) SZMC (Shenzhen Metro Group)
Character Underground and elevated
Technical
Line length 12.34 km (7.67 mi)
Number of tracks 2
Track gauge 1,435 mm (4 ft 8 12 in)

Line 8 Shenzhen Metro (Yantian Line)is currently under construction. Line 8 has a length of 12.34 km and a total of 6 stations. It connects the Liantang with Yantian. Line 8 is the first line to serve Yantian. The line may be built as a monorail rather than a traditional metro.[1] Construction may start in 2016, with the line scheduled to open in 2020.[2]

References

  1. "深圳地铁6条延长线线路图!看看哪些经过你家 - 深圳本地宝". jt.sz.bendibao.com. Retrieved 2016-06-11.
  2. Sasin, Jasmin. "New Metro Lines to Start Construction in September". Shenzhen Standard. Retrieved 23 January 2014.

This article is issued from Wikipedia - version of the 9/22/2016. The text is available under the Creative Commons Attribution/Share Alike but additional terms may apply for the media files.