Duta–Ulu Klang Expressway
Expressway 33 | |
---|---|
Duta-Ulu Klang Expressway | |
Route information | |
Part of (Jalan Duta - Sentul Pasar - Greenwood stretch) | |
Maintained by Konsortium Lebuhraya Utara-Timur (Kuala Lumpur) Sdn Bhd (Kesturi) | |
Length: | 18.0 km (11.2 mi) |
Existed: | 2006 – present |
History: | Completed in 2009 |
Major junctions | |
From: | Jalan Duta Interchange on North-South Expressway Northern Route |
New Klang Valley Expressway Kuala Lumpur-Rawang Highway Jalan Sentul Genting Klang-Pahang Highway Jalan Kampung Bandar Dalam Jalan Sultan Yahya Petra (Jalan Semarak) Jalan Jelatek Jalan 37/66 Kuala Lumpur Middle Ring Road 2 | |
To: | Taman Hillview Interchange near Ulu Klang on Kuala Lumpur Middle Ring Road 2 |
Location | |
Primary destinations: | Jalan Duta, Segambut, Sentul, Setiawangsa, Ulu Klang |
Highway system | |
Duta–Ulu Klang Expressway (DUKE), E33, is the main expressway network in Klang Valley, Malaysia. The 18 km (11 mi) expressway connects New Klang Valley Expressway's Jalan Duta Interchange E1 to Taman Hillview Interchange on Kuala Lumpur Middle Ring Road 2 28 in Ulu Klang. The expressway was constructed to provide the "missing link" between New Klang Valley Expressway E1, Kuala Lumpur-Karak Expressway 2, E8, and Kuala Lumpur Middle Ring Road 2 28. This expressway is also known as the Kuala Lumpur Northeast Dispersal Link Scheme. It was proposed by Tan Sri Datuk Lim Kang Hoo, a chairman of Ekovest Berhad.
In addition to improving connectivity, DUKE disperses traffic from the city to the suburban range through several routes in and out of several branches of the main intersection. Through DUKE, it can move from one part to other parts of Kuala Lumpur in a short time, by bypassing congested traffic areas, such as Kuala Lumpur Middle Ring Road 1 and Kuala Lumpur Inner Ring Road.
Route background
Duta-Sentul Pasar-Ulu Klang sections
The Kilometre Zero of this section is located at Jalan Duta Interchange near Jalan Duta, Kuala Lumpur, at its interchange with the New Klang Valley Expressway .
Greenwood-Sentul Pasar sections
The Kilometre Zero of this section is located at Sentul Pasar Interchange. At Bandar Dalam Interchange the expressway overlaps with the Federal Route 2 from Bandar Dalam Interchange to Greenwood Interchange.
History
The expressway used to be known as the Kuala Lumpur North East Expressway (KLNEE). It is a main element in the Kuala Lumpur Structure Plan 2020 as specified in the Transportation Research of the Japan International Cooperation Agency (JICA) conducted by the Kuala Lumpur City Hall (Dewan Bandaraya Kuala Lumpur) (DBKL) in 1985. It was identified by DBKL as one of the main connecting routes to complete the Kuala Lumpur Structure Plan 2020. DBKL conducted a detailed study of the alignment that feed the next three years, including Environmental Impact Assessment and Public Opinion. These studies and reports were approved by the Concession Agreement signed with the Federal Government on 12 August 2004.
The construction of this expressway commenced in mid-2006. The Jalan Duta-DUKE Interchange was built at the sharp hairpin of the NKVE and the Jalan Kuching Interchange was built at the former Jalan Kuching Toll Plaza owned by Kamunting Corporation Berhad. The expressway was partially (2/3) was officially opened by the Minister of Works Ir Mohd Zin Mohamed on 9 January 2009. Three months later, the NKVE section was open to traffic on 30 April 2009. Built to accommodate 120,000 vehicles per day, this expressway will offer an attractive alternative route to Klang Valley residents, especially for those traveling from east to west and for those who want to go to the city centre.
Progress
Construction progress gallery
-
Progress photo taken at Duta Interchange Feb 2006
-
Progress photo taken at Duta Interchange Feb 2007
Developments
DUKE Extension Expressway Project
The phase two development of the DUKE will be built by Ekovest Bhd and will start in two weeks at a construction cost of RM1.183 billion. Phase two, which will entail the construction of an elevated highway that will complement the existing DUKE, was to be completed in 2015. The DUKE extension will comprise two additional links, namely the Sri Damansara Link and the Tun Razak Link. Both links are proposed to have dual carriageways and the Tun Razak link will be about 9 kilometres in length while the Sri Damansara Link will be 7 kilometres long. The expressway will serve as a link between the Kuala Lumpur Middle Ring Road 1 (MRR1) and Kuala Lumpur Middle Ring Road 2 MRR2.
Features
- Flyovers passing Segambut, Sentul and Setapak town.
- Sentul flyover sections with 132kv of Tenaga Nasional Berhad's (TNB) transmmision line (National Grid). During construction on 2007, the Cabinet directed the concessionaire Konsortium Lebuhraya Utara-Timur (KL) Sdn Bhd to share the TNB reserve in order to reduced land acquisition costs. In order to do this, the existing high tension pylons were replaced with monopoles, with the expressway running either side.
Tolls
The DUKE uses an open toll system.
Batu, Sentul Pasar and Ayer Panas toll plazas have fully Electronic Toll Collections (ETC). As part of an initiative to facilitate faster transaction at the Batu, Sentul Pasar and Ayer Panas Toll Plazas, all toll transactions at three toll plazas on the DUKE are conducted electronically via Touch 'n Go cards or SmartTAGs starting 9 September 2015.
Toll rates
(Starting 15 October 2015)
Class | Type of vehicles | Rate (in Malaysian Ringgit (RM)) |
---|---|---|
0 | Motorcycles, bicycles or vehicles with 2 or less wheels | Free |
1 | Vehicles with 2 axles and 3 or 4 wheels excluding taxis | RM 2.50 |
2 | Vehicles with 2 axles and 5 or 6 wheels excluding buses | RM 3.80 |
3 | Vehicles with 3 or more axles | RM 5.00 |
4 | Taxis | RM 1.30 |
5 | Buses | RM 1.30 |
- Note: Toll charges can only be paid with the Touch 'n Go cards or SmartTAG. Cash payment is not accepted.
List of interchanges
Phase 1
Duta-Sentul Pasar-Ulu Klang sections
Km | Exit | Interchange | To | Remarks | |
---|---|---|---|---|---|
New Klang Valley Expressway West Ipoh Klang Kuala Lumpur International Airport (KLIA) Johor Bahru | |||||
New Klang Valley Expressway PLUS Expressway border limit | |||||
(TnG and TAG ETC only) Kesturi border limit | |||||
0 | EXIT 3301 | [Jalan Duta Interchange | New Klang Valley Expressway South Jalan Tuanku Abdul Halim (Jalan Duta) City Centre From NKVE West Only Southwest Sprint Expressway Mont Kiara Sri Hartamas Petaling Jaya | Trumpet expressway interchange | |
0 | EXIT 3301 | Jalan Duta Interchange | Direction Towards Sprint Expressway From East Southwest Sprint Expressway Mont Kiara Sri Hartamas Petaling Jaya | From east only | |
Segambut flyover | Start/End of flyover | ||||
Segambut flyover Road-Railway crossing stacked bridge | |||||
EXIT 3301B | Segambut flyover Sungai Keroh bridge Segambut Interchange | Northwest Sri Damansara Bandar Manjalara Kepong Segambut | Interchange Under construction | ||
Segambut flyover | Start/End of flyover | ||||
3 | |||||
EXIT 3302 | Jalan Kuching Interchange | Kuala Lumpur-Rawang Highway North Ipoh Rawang Kepong South City Centre Cheras Seremban | Semi cloverleaf interchange | ||
Batu toll plaza BTU | TnG TAG Customer Service Centre | West bound | |||
Batu toll plaza BTU (West bound) TnG TnG TAG TAG Opened toll system Pay toll (Accepts electronic toll payment (TnG and TAG) only) | |||||
4 | |||||
Sentul flyover | Start/End of separated flyover | ||||
Sentul flyover Sungai Batu bridge | |||||
Sentul flyover 132 kv of TNB transmission line (National Grid) 500m | High voltage transmission line on the flyover | ||||
Sentul flyover 132 kv of TNB transmission line (National Grid) 500m Railway crossing bridge | High voltage transmission line on the flyover | ||||
Sentul flyover | Start/End of separated flyover | ||||
Sentul flyover Sentul Ramp | Ramp in to expressway | ||||
Sentul flyover | Start/End of flyover | ||||
5 | |||||
Duta–Ulu Klang Expressway
| |||||
EXIT 3303 | Sentul Pasar Interchange | North Greenwood-Sentul Pasar Link Batu Caves Gombak Kuantan Genting Highlands South Tun Razak Link City Centre Sentul | Y expressway interchange Tun Razak Link Under construction | ||
Duta–Ulu Klang Expressway
| |||||
Setapak flyover | Start/End of flyover | ||||
Setapak flyover Sungai Gombak bridge | |||||
Setapak flyover Jalan Pahang Ramp | Ramp in to expressway | ||||
Setapak flyover | Start/End of flyover | ||||
Ayer Panas toll plaza APS (East bound) TAG TAG TnG TnG Opened toll system Pay toll (Accepts electronic toll payment (TnG and TAG) only) | |||||
Ayer Panas toll plaza APS Kesturi main headquarters | TnG TAG Customer Service Centre Kesturi operation office | East bound | |||
Ayer Jernih-Semarak flyover | Start/End of flyover | ||||
EXIT 3304 | Ayer Jernih-Semarak flyover Ayer Jernih Ramp | Setapak City Centre | Ramp in/out to/from expressway | ||
Ayer Jernih-Semarak flyover | |||||
EXIT 3305 | Ayer Jernih-Semarak flyover Semarak Interchange | Jalan Sultan Yahya Petra (Jalan Semarak) South City Centre Kampung Baru PULAPOL | Half diamond interchange | ||
Ayer Jernih-Semarak flyover | Start/End of flyover | ||||
EXIT 3306 | Setiawangsa Interchange | Jalan Jelatek North Wangsa Maju South Setiawangsa Jalan Ampang | 3-tier stacked interchange | ||
Federal Territory of Kuala Lumpur
| |||||
FT Kuala Lumpur-Selangor border
| |||||
Selangor Darul Ehsan Gombak district border | |||||
Hilview flyover | Start/End of flyover | ||||
EXIT 3307 | Hilview flyover Jalan 37/66 Ramp | Jalan 37/66 North Taman Melawati South Jalan Enggang Taman Setiawangsa Taman Keramat | Roundabout interchange | ||
Hilview flyover Sungai Klang bridge | |||||
Duta–Ulu Klang Expressway Start/End of expressway (TnG and TAG ETC only) Kesturi border limit | |||||
Kuala Lumpur Middle Ring Road 2 JKR border limit | |||||
EXIT 3308A EXIT 3308B | Hilview flyover Taman Hillview Interchange | Kuala Lumpur Middle Ring Road 2 EXIT 3308A North Ulu Klang Taman Melawati Gombak Batu Caves Kepong Sungai Buloh Rawang Ipoh Kuantan EXIT 3308B South Ampang Cheras Kajang Johor Bahru Melaka Seremban Kuala Lumpur International Airport (KLIA) Shah Alam Klang | Stacked expressway interchange |
Greenwood-Sentul Pasar sections
Km | Exit | Interchange | To | Remarks | |
---|---|---|---|---|---|
South Tun Razak Link' City Centre Sentul | |||||
0 (K) | EXIT 3303 | Sentul Pasar Interchange | Duta-Sentul Pasar–Ulu Klang Link West Ipoh Petaling Jaya Segambut Kepong Sentul Kuala Lumpur city centre East Jalan Sultan Yahya Petra (Jalan Semarak) Setiawangsa Ulu Klang Ampang | Y expressway interchange | |
EXIT 3303A | East Setapak Link Jalan Gombak Setapak Gombak | Interchange | |||
Sentul toll plaza STL (North bound) TAG TAG TnG TnG Opened toll system Pay toll (Accepts electronic toll payment (TnG and TAG) only) | |||||
Sentul toll plaza STL | TnG TAG Customer Service Centre | North bound | |||
Sungai Chubadak bridge | |||||
1 (K) -- | |||||
| |||||
EXIT 3309 | Jalan Kampung Bandar Dalam | Jalan Kampung Bandar Dalam West Sentul Batu East Gombak Setapak | Diamond interchange | ||
Duta–Ulu Klang Expressway
| |||||
2 (K) -- | |||||
3 (K) -- | |||||
Sungai -- bridge | |||||
Federal Territory of Kuala Lumpur
| |||||
FT Kuala Lumpur-Selangor border
| |||||
Selangor Darul Ehsan Gombak district border | |||||
Duta–Ulu Klang Expressway Start/End of expressway (TnG and TAG ETC only) Kesturi border limit | |||||
Kuala Lumpur Middle Ring Road 2 JKR border limit | |||||
4 (K) -- | |||||
EXIT 3310 | Greenwood Interchange | West Kuala Lumpur Middle Ring Road 2 Batu Caves Ipoh Kepong Petaling Jaya Sungai Buloh East B22 Jalan Batu CavesGombak B22 Taman Greenwood | Directional ramp Stacked diamond interchange | ||
Kuala Lumpur Middle Ring Road 2 Northeast Kuantan Genting Highlands Johor Bahru Seremban Ampang Cheras Ulu Klang Kajang |
Phase 2
Sri Damansara Link
Km | Exit | Interchange | To | Remarks | |
---|---|---|---|---|---|
EXIT 3301B | Segambut Interchange | Duta-Sentul Pasar–Ulu Klang Link West Ipoh Petaling Jaya East Kuala Lumpur city centre Sentul Gombak Batu Caves Kuantan Genting Highlands Jalan Semarak Setiawangsa Ulu Klang Ampang | Interchange | ||
Segambut toll plaza SGB Opened toll system Pay toll | |||||
Segambut Toll Plaza SGB | |||||
EXIT 3311 | Taman Bukit Maluri exit | Taman Bukit Maluri | Ramp In/Out exit | ||
EXIT 3312A | Menjalara Interchange | Kuala Lumpur Middle Ring Road 2 Northeast Kepong Selayang Rawang Batu Caves Kuantan Genting Highlands | Interchange | ||
EXIT 3312B | Menjalara Interchange | Kuala Lumpur Middle Ring Road 2 West Sungai Buloh Highway Bandar Sri Damansara Sungai Buloh Kuala Selangor North-South Expressway Northern Route Ipoh Klang Kuala Lumpur International Airport (KLIA) Johor Bahru South Damansara-Puchong Expressway Damansara Petaling Jaya Puchong Putrajaya | Interchange | ||
Setapak Link
Km | Exit | Interchange | To | Remarks |
---|---|---|---|---|
Sentul Pasar Interchange | Greenwood-Sentul Pasar Link | Interchange | ||
Sungai Gombak bridge | ||||
Setapak Junctions | Jalan Gombak North Gombak South Setapak | T-junctions |
Tun Razak Link
Km | Exit | Interchange | To | Remarks |
---|---|---|---|---|
North Greenwood-Sentul Pasar Link Batu Caves Gombak Kuantan Genting Highlands | ||||
EXIT 3303A | East Setapak Link Jalan Gombak Setapak Gombak | Interchange | ||
0 (K) | EXIT 3303 | Sentul Pasar Interchange | Duta-Sentul Pasar–Ulu Klang Link West Ipoh Petaling Jaya Segambut Kepong Sentul Kuala Lumpur city centre East Jalan Semarak Setiawangsa Ulu Klang Ampang | Y expressway interchange |
EXIT 3313 | Sentul Interchange | Sentul Bandar Baru Sentul | Interchange | |
EXIT 3314 | Jalan Pahang Exit | North Genting Klang-Pahang Highway Jalan Pahang Setapak Gombak | Exit | |
EXIT 3315 | Bulatan Pahang Roundabout | Kuala Lumpur Middle Ring Road 1 Jalan Tun Razak West Ipoh Petaling Jaya East KLCC Ampang Seremban Melaka Johor Bahru | Roundabout interchange with one directional underpass to Ipoh and Petaling Jaya |