List of Toronto subway stations
The Toronto subway is the system of underground and elevated railway lines in Toronto, Ontario, Canada, operated by the Toronto Transit Commission (TTC). It was the country's first subway system: the first line was built under Yonge Street with a short stretch along Front Street, which opened in 1954 with 12 stations. Since then, the system has expanded to become Canada's largest (in terms of stations) and second busiest rapid transit rail network with an average of 1,093,300 passenger trips each weekday (as of Q4 2014), after the Montreal Metro.[1]
The subway system encompasses four lines (one of which, Line 3, is a light metro line) and 69 stations on 68.3 kilometres (42.4 mi) of route.[2] An 8.6-kilometre (5.3 mi), six-station extension of Line 1 Yonge–University north to Vaughan is under construction and scheduled to open for December 2017.[3] Line 5 Eglinton, a 25-station, 19-kilometre (12 mi) light rail transit (LRT) line, is under construction and scheduled to open in 2021.[4] In addition, the Finch West LRT, with 19 stations on 11 kilometres (6.8 mi) of track, will be constructed between 2016 and 2021.[5]
Current stations
Line 1 Yonge–University |
Line 2 Bloor–Danforth |
Line 3 Scarborough (RT) |
Line 4 Sheppard |
Line 5 Eglinton (under construction) |
Under construction
References
- ↑ "Public Transportation Ridership Report - Fourth Quarter & End-of-Year 2014, 2014" (PDF). American Public Transportation Association. March 3, 2015. p. 34. Retrieved 2015-04-13.
- ↑ "2013 TTC Operating Statistics". Toronto Transit Commission. Retrieved 2015-01-14.
- ↑ "2011 Toronto-York Spadina Subway Extension Overview". Toronto Transit Commission. Retrieved 2013-02-10.
- ↑ http://www.thestar.com/news/gta/transportation/2015/09/24/eglinton-crosstown-to-open-a-year-later-than-expected.html
- ↑ Fox, C. (2015-04-27). "Construction on Finch West LRT to begin in 2016 but Sheppard East LRT on hold". CP24. Retrieved 2015-04-27.
- ↑ Toronto Transit Commission – History
- ↑ "Subway ridership, 2014" (PDF). Toronto Transit Commission. Retrieved September 12, 2015.
This table shows the typical number of customer-trips made on each subway on an average weekday and the typical number of customers travelling to and from each station platform on an average weekday.
- ↑ https://ttc.ca/Riding_the_TTC/Parking/index.jsp
- ↑ http://www.toronto.ca/ttc/pdf/rideguide.pdf
- ↑ http://www.ttc.ca/Service_Advisories/Construction/Coxwell_bus_road_clo.jsp
- ↑ Tess Kalinowski (September 24, 2015). "Eglinton Crosstown to open a year later than expected". Toronto Star. Retrieved 2015-09-24.
- ↑ http://www.metrolinx.com/en/docs/pdf/finch_west_ea/chapter_2_plates_part_1.pdf
- ↑ http://www.metrolinx.com/en/docs/pdf/finch_west_ea/chapter_2_plates_part_2.pdf
- ↑ http://www.ttc.ca/About_the_TTC/Commission_reports_and_information/Commission_meetings/2016/February_25/Reports/Changes_to_TTC_Bus_Routes_in_Eglinton_Corridor_for_Line_5_Ra.pdf
- ↑ https://www.ttc.ca/Spadina/Stations/Finch_West_Station/index.jsp
- ↑ http://www.ttc.ca/Spadina/Stations/Steeles_West_Station/index.jsp
- ↑ http://www.ttc.ca/Spadina/Stations/Highway_407_Station/index.jsp