MAX Green Line

MAX Green Line

A Green Line train along SW 6th Avenue in Downtown Portland
Overview
Type Light rail
System MAX Light Rail
Locale Portland metropolitan area, Oregon
Termini Portland State University
Clackamas Town Center TC
Stations 29
Daily ridership 24,300 (as of April 2012)[1]
Website MAX Green Line
Operation
Opened September 12, 2009
Operator(s) TriMet
Technical
Track gauge 1,435 mm (4 ft 8 12 in) standard gauge
Electrification 750 V DC, overhead centenary
Route diagram
Legend
     Orange Line (To Milwaukie)
SW 6th & College
SW 5th & Jackson
SW 6th & Montgomery
 A  Loop /  NS  Line Streetcar
SW 5th & Mill
 B  Loop /  NS  Line Streetcar
SW 6th & Jefferson
SW 5th & Jefferson
     Blue Line (To Gresham)
     Red Line (To Airport)
Pioneer Courthouse
Pioneer Place
     Blue Line (To Hillsboro)
     Red Line (To Beaverton)
SW 6th & Pine
SW 5th & Oak
NW 6th & Davis
NW 5th & Couch
Union StationAmtrak
     Blue Line (To Hillsboro)
     Red Line (To Beaverton)
Steel Bridge
     Yellow Line (To Expo Center)
Rose Quarter TC
Interstate 5
Convention Center
 B  Loop Streetcar (on Grand Ave.)
 A  Loop Streetcar (on 7th Ave.)
NE 7th Ave.
Lloyd Center/NE 11th Ave.
Hollywood/NE 42nd Ave. TC
NE 60th Ave.
NE 82nd Ave.
I-84 / I-205
Gateway/NE 99th Ave. TC
     Blue Line (To Gresham)
     Red Line (To Airport)
SE Main St.
Interstate 205
SE Division St.
SE Powell Blvd.
SE Holgate Blvd.
Lents/SE Foster Rd.
SE Flavel St.
SE Fuller Rd.
Clackamas Town Center TC

The MAX Green Line is a light rail route in the MAX Light Rail system in Portland, Oregon, United States, extending to Clackamas, Oregon. Construction began in early 2007,[2] and the line opened on September 12, 2009.[3] The average daily ridership in June 2010 was 19,500[4] increasing to 24,300 by April 2012.[1]

Project details

The Green Line runs over a combination of existing and new tracks. New tracks were built in two projects:

The Green Line's I-205 section is served only by this line (unlike the I-84 and downtown segments). Most service uses older (pre-2005) rail cars, as they make up 83% of the fleet.

The alignment passes under the Burnside St., Stark St., Washington St., Main St. (pedestrian) and Market St. overpasses on the east side of the freeway, then crosses under the freeway between the Market St. and Division St. overpasses. It passes under the Division St. overpass before going over Powell Boulevard. and then under the Holgate Boulevard. overpass. It then passes under the Steele St. (ped.) overpass and over Harold St., Foster Rd., Woodstock Blvd., and Springwater corridor. The line then crosses Johnson Creek before an at-grade crossing at Flavel St. The line passes over the intersection of 92nd Avenue and Crystal Springs Boulevard, then returns to grade before traveling above Johnson Creek Boulevard on a 1,400-foot-long overpass, the longest new structure on the alignment. South of Fuller Road station the line dips under the pre-existing Otty Road and Monterey Avenue overpasses, before terminating at the Clackamas Town Center Transit Center, near Sunnyside Road. Because of the extensive grade-separation, trains are able to travel the 6.5-mile (10.5 km) distance from Clackamas to Gateway in only 16 minutes. Much of this segment parallels the I-205 Bike Path.

Connecting the two new sections is the following previously existing section:

Finances

Lents Town Center MAX station

The MAX Green Line project cost $575.7 million, $345.4 million of which was funded by the Federal Transit Administration.[7] The project received $32 million in funding from the American Recovery and Reinvestment Act of 2009, an amount already committed to the project by the federal government but made available so that TriMet could retire debt earlier.[7]

Possible future extension

The line may one day be extended south to Oregon City.[8][9] Such an extension was one of six corridors in Metro's High Capacity Transit System Plan designated as a "Next Phase Regional Priority Corridor,"[10] a second-level tier where "future HCT investment may be viable if recommended planning and policy actions are implemented."

Stations

References

  1. 1 2 TriMet ridership continues to rise May 11, 2012. TriMet. Retrieved 2012-05-11.
  2. 1 2 Redden, Jim (September 13, 2009). "Leaders heap praise on new MAX Green Line". Portland Tribune. Archived from the original on June 8, 2011. Retrieved 2014-05-13.
  3. Rivera, Dylan (September 13, 2009) [online date September 12, 2009]. "Riders pack MAX Green Line on first day of service". The Oregonian. Retrieved 2009-09-20.
  4. Monthly Performance Report (June 2010) (PDF). July 23, 2010. TriMet. Retrieved 2010-09-07.
  5. "New MAX line opens downtown". Portland Tribune. August 28, 2009. Archived from the original on June 8, 2011. Retrieved 2014-05-13.
  6. Redden, Jim (September 10, 2009) [updated October 30]. "After 35 years of waiting, TriMet's Green Line hits all the parties: Thousands ride new I-205 line that was born of a '70s freeway rebellion". Portland Tribune. Archived from the original on June 8, 2011. Retrieved 2014-05-13.
  7. 1 2 Carinci, Justin (May 8, 2009). "MAX green line gets $32 million". Daily Journal of Commerce. Retrieved August 21, 2012.
  8. Redden, Jim (August 20, 2009). "Cities fight to avoid being left at station". Portland Tribune. Retrieved 2014-05-13.
  9. https://trimet.org/pdfs/tip/tip.pdf (8.7M page vi)
  10. Regional High Capacity Transit System Plan 2035 - Summary Report. June 2010. Metro. http://library.oregonmetro.gov/files//hct_plan_june2010_web.pdf
This article is issued from Wikipedia - version of the 8/2/2016. The text is available under the Creative Commons Attribution/Share Alike but additional terms may apply for the media files.