Sequoyah Nuclear Generating Station
Sequoyah Nuclear Plant | |
---|---|
Location of Sequoyah Nuclear Plant in Tennessee | |
Country | United States |
Location | Hamilton County, near Soddy-Daisy, Tennessee |
Coordinates | 35°13′35″N 85°5′30″W / 35.22639°N 85.09167°WCoordinates: 35°13′35″N 85°5′30″W / 35.22639°N 85.09167°W |
Status | Operational |
Construction began | 1969–80 |
Commission date |
Unit 1: July 1, 1981 Unit 2: June 1, 1982 |
Operator(s) | Tennessee Valley Authority |
Nuclear power station | |
Reactor type | pressurized water reactor |
Reactor supplier | Westinghouse |
Cooling source | Chickamauga Lake |
Cooling towers | 2 |
Power generation | |
Units operational |
1221 MW 1200 MW[1] |
Capacity factor | 89.1% |
Average generation | 17,754 GWh |
Website www.tva.gov/power/nuclear/sequoyah.htm |
The Sequoyah Nuclear Plant is a nuclear power plant located on 525 acres (212 ha) located 7 miles (11 km) east of Soddy-Daisy, Tennessee, and 20 miles (32 km) north of Chattanooga, abutting Chickamauga Lake, on the Tennessee River. The facility is owned and operated by the Tennessee Valley Authority (TVA).
The plant has two Westinghouse pressurized water reactors. Sequoyah units 1 & 2, as well as their sister plant at Watts Bar, both have ice condenser containment systems. In case of a large loss-of-coolant accident, steam generated by the leak is directed toward borated ice which helps condense the steam creating a lower pressure, allowing for a smaller containment building.
Sequoyah's two units have a winter net dependable capacity of 2,333 megawatts,[2] making Sequoyah the most productive of TVA's four nuclear plants. Sequoyah is the second-most powerful electric plant in the entire TVA system, second only to the Cumberland coal-fired plant northwest of Nashville. Following the restart of Brown's Ferry Unit 1, that plant again became most productive at 3,440 MW.
The operating license of Sequoyah's Unit 1 was originally set to expire in 2020, and Unit 2's operating license in 2021. In 2015, the NRC renewed the operating license for both units for an additional 20 years. [3]
TVA constructed dry cask storage facilities at Sequoyah and purchased special storage containers for the purpose of storing spent nuclear fuel. The storage facilities have been approved by the NRC.[2]
TVA's Sequoyah operating license was modified in September 2002 to allow TVA to irradiate tritium-producing burnable absorber rods at Sequoyah for the U.S. Department of Energy. The process of irradiating tritium-producing rods produces tritium, which is used in nuclear weapons and for various forms of research into nuclear fusion for commercial power production. TVA began irradiating tritium-producing rods at its Watts Bar Nuclear Generating Station in 2003. As of February 2007, TVA had no plans to produce tritium at Sequoyah.[2]
Name
Sequoyah was Cherokee, part of the Overhill Cherokee, reportedly born in Tuskegee, a town at the confluence of the Tellico River and Little Tennessee River, upriver of the nuclear power plant. He is known for creating the Cherokee syllabary circa 1820. Many Cherokee sites were flooded during the Tennessee Valley Authority's (TVA) construction of Tellico Dam (1967-1979). Naming the site after a local Native American Indian was considered a small political token to the Cherokee in compensation for the dam-flooding and destruction of their historic sites that TVA required to control flooding on the Tennessee River.
Surrounding population
The Nuclear Regulatory Commission defines two emergency planning zones around nuclear power plants: a plume exposure pathway zone of 10 miles (16 km) radius (concerned primarily with exposure to, and inhalation of, airborne radioactive contamination), and an ingestion pathway zone of about 50 miles (80 km) radius (concerned primarily with ingestion of food and liquid contaminated by radioactivity).[4]
The 2010 U.S. population within 10 miles (16 km) of Sequoyah was 99,664, according to 2010 U.S. Census data analyzed for msnbc.com, an increase of 13.8 percent in a decade.[5] The 2010 U.S. population within 50 miles (80 km) was 1,079,868 (increase of 13.8 percent).[5] Cities within 50 miles include Chattanooga (14 miles to city center).[5]
Seismic risk
The Nuclear Regulatory Commission's estimate of the risk each year of an earthquake intense enough to cause core damage to the reactor at Sequoyah was 1 in 19,608, according to an NRC study published in August 2010.[6][7]
Notes
- ↑ Tennessee Nuclear Plants, eia.doe.gov
- 1 2 3 Securities & Exchange Commission filing. Available at http://www.sec.gov/
- ↑ http://www.nrc.gov/reading-rm/doc-collections/news/2015/15-057.pdf
- ↑ http://www.nrc.gov/reading-rm/doc-collections/fact-sheets/emerg-plan-prep-nuc-power-bg.html
- 1 2 3 Bill Dedman, "Nuclear neighbors: Population rises near US reactors," msnbc.com, April 14, 2011 http://www.msnbc.msn.com/id/42555888/ns/us_news-life/ Accessed April 16, 2011.
- ↑ Bill Dedman, "What are the odds? US nuke plants ranked by quake risk," msnbc.com, March 17, 2011 http://www.msnbc.msn.com/id/42103936/ Accessed April 19, 2011.
- ↑ http://msnbcmedia.msn.com/i/msnbc/Sections/NEWS/quake%20nrc%20risk%20estimates.pdf
External links
- "Sequoyah Nuclear Power Plant, Tennessee". U.S. Department of Energy (DOE). October 10, 2008. Retrieved 2008-11-17.
- "Sequoyah 1 Pressurized Water Reactor". Operating Nuclear Power Reactors. U.S. Nuclear Regulatory Commission (NRC). February 14, 2008. Retrieved 2008-11-17.
- "Sequoyah 2 Pressurized Water Reactor". Operating Nuclear Power Reactors. NRC. February 14, 2008. Retrieved 2008-11-17.
- "George A. Lidberg Jr. and Depression-Era Archaeology in Tennessee". David H. Dye. Southeastern Archaeology. 30 February 2013. Retrieved 2013-03-26. Check date values in:
|date=
(help) - "Flooding in Tennessee". Disasters in Tennessee. Tennessee State Library and Archives. n.d. Retrieved 2013-03-26.