Polatlı–Konya high-speed railway

This article is about the Polatlı-Konya high-speed railway. For the Ankara-Konya high-speed train route, see Yüksek Hızlı Tren.
Polatlı–Konya high-speed railway

A TCDD HT65000 on the Polatlı–Konya high-speed railway
Overview
Type High-speed rail
System Turkish State Railways
Status Operational
Locale Central Anatolia
Termini Polatlı
Konya
Stations 1
Operation
Opened 23 August 2011
Owner Turkish State Railways
Operator(s) Turkish State Railways
Depot(s) Güvercinlik Yard
New Etimesgut Yard Future
Rolling stock HT65000, HT80000
Technical
Line length 212 km (131.73 mi) (From Polatlı to Konya)[1]
Number of tracks Double track
Track gauge 1,435 mm (4 ft 8 12 in) standard gauge
Minimum radius 3500 m
Electrification 25 kV, 50 Hz AC Overhead line[2]
Operating speed 250 km/h (160 mph)[2]
Maximum incline 16
Route map
Legend
Distance Station
Ankara-Istanbul HSR
to Istanbul
Istanbul–Ankara railway
to Ankara
0 km
Ankara-Istanbul HSR
to Ankara
Istanbul–Ankara railway
to Istanbul
Polatlı railway maintenance Yard
Polatlı-Izmir high-speed railway
21 km (13.0 mi) Yenice siding
D695
56 km (34.8 mi) Şeyhahmetli siding
Ankara Province/Konya Province
82 km (51.0 mi) Özyayla siding
128 km (79.5 mi) Kolukısa siding
147 km (91.3 mi) Karatepe siding
Eskişehir–Konya railway
to Eskişehir
Pınarbaşı
Horozluhan
211 km (131.1 mi) Konya
Konya–Nusaybin railway
to Nusaybin
The planned Turkish high-speed rail network

The Polatlı–Konya high-speed railway (Turkish: Polatlı-Konya yüksek hızlı demiryolu) is a 211 km (131 mi) long high-speed railway running from the town of Polatlı to the central Anatolian city of Konya.

The railway is used by the Turkish State Railways' premier high-speed passenger service, Yüksek Hızlı Tren, which operates two routes on the line; Istanbul-Konya and Ankara-Konya. The railway was opened on 23 August 2011, making it the second high-speed railway in Turkey.[3]

Construction of the railway started on 8 July 2006 and was finished in mid-2011 at a cost of TL1 billion ($330 million).[4] On 3 June 2011, TCDD HT65001 Piri Reis made the inaugural test run with Prime Minister Recep Tayyip Erdoğan and Minister of Transport Binali Yıldırım; departing Ankara and arriving at Konya with large media fanfare. Test runs continued for two and a half months until the line was opened to commercial traffic on 23 August.

See also

References

  1. http://tr.railturkey.org/2015/06/10/konya-polatli-yuksek-hizli-tren-hatti/
  2. 1 2 "Opening of Ankara - Konya fast line completes strategic link". Railway Gazette. 24 August 2011. Retrieved 2013-02-12.
  3. "Invensys commissions ERTMS solution on Turkish High Speed Line". European Railway Review. 7 September 2011. Archived from the original on 19 December 2011. Retrieved 20 December 2011.
  4. "High-Speed Rail Line Connecting Ankara-Konya Concluded". Turkish Weekly. 17 August 2011. Archived from the original on 19 December 2011. Retrieved 20 December 2011.

This article is issued from Wikipedia - version of the 11/8/2016. The text is available under the Creative Commons Attribution/Share Alike but additional terms may apply for the media files.