Avonmouth railway station

This article is about the Bristol station currently called Avonmouth. For the terminus of the Bristol Port Railway and Pier line, see Avonmouth (BPRP) railway station. For other railway stations in the Avonmouth area, see Avonmouth railway station (disambiguation).

Avonmouth National Rail

Avonmouth station in 2009
Location
Place Avonmouth
Local authority Bristol
Coordinates 51°30′00″N 2°41′57″W / 51.5001°N 2.6992°W / 51.5001; -2.6992Coordinates: 51°30′00″N 2°41′57″W / 51.5001°N 2.6992°W / 51.5001; -2.6992
Grid reference ST515781
Operations
Station code AVN
Managed by Great Western Railway
Number of platforms 2
DfT category F1
Live arrivals/departures, station information and onward connections
from National Rail Enquiries
Annual rail passenger usage*
2010/11 Increase 83,674
2011/12 Increase 88,642
2012/13 Increase 97,880
2013/14 Increase 0.111 million
2014/15 Increase 0.120 million
History
Original company Bristol Port Railway and Pier
Pre-grouping Great Western Railway / Midland Railway
Post-grouping Great Western Railway / London, Midland and Scottish Railway
1868 Opened as a workers' platform
1877 Opened as Avonmouth Dock
1 September 1885 Rebuilt and renamed Avonmouth Dock Joint
1926 Rebuilt
20 June 1966 Closed to goods traffic; renamed as Avonmouth
National Rail – UK railway stations
* Annual estimated passenger usage based on sales of tickets in stated financial year(s) which end or originate at Avonmouth from Office of Rail and Road statistics. Methodology may vary year on year.
UK Railways portal

Avonmouth railway station is on the Severn Beach Line and serves the district of Avonmouth in Bristol, England. It is 9.0 miles (14.5 km) from Bristol Temple Meads. Its three letter station code is AVN. The station has two platforms, on either side of two running lines. As of 2015 it is managed by Great Western Railway, which is the third franchise to be responsible for the station since privatisation in 1997. They provide all train services at the station, mainly a train every forty minutes to Bristol Temple Meads and one every two hours to Severn Beach.

The station was opened in 1877 by the Bristol Port Railway and Pier, a railway which ran along the River Avon from Hotwells to a pier at Avonmouth. The station, originally known as Avonmouth Dock, had a single platform, but was rebuilt with two platforms by the Great Western and Midland Railways in 1885 when they began services via Clifton Down. The station was enhanced numerous times in the early part of the twentieth century, and by 1913 employed 72 staff. Facilities included a goods yard, signal box and engine shed.

The Severn Beach Line declined over the latter half of the twentieth century, with passenger numbers falling significantly. Goods services at Avonmouth ended in 1966, and all staff were withdrawn in 1967. Services had decreased to 10 per day each direction by 2005, but have since increased to 25 trains per day.

Description

The station is located in the Avonmouth district of Bristol, an area of mixed industrial and residential usage. The station sits to the south of the junction of Gloucester Road and Portview Road, the tracks running to parallel to Portview Road and crossing Gloucester Road at a level crossing.[1][2] The station is on the Severn Beach Line from Bristol Temple Meads to Severn Beach, 9 miles 02 chains (14.5 km) from Temple Meads and 4 miles 42 chains (7.3 km) from Severn Beach.[3][4][note 1] It is the eighth station from Temple Meads. The next station towards Temple Meads is Shirehampton; the next towards Severn Beach is St Andrews Road.[5]

The station is on a north-west/south-east alignment, with two platforms separated by two running lines. The southern "up" platform, adjacent to the "Up Main" line, is used for trains towards Severn Beach. The northern "down" platform, adjacent to the "Down Main" line, is bidirectionally signalled, allowing it to be used by terminating trains and those heading towards Bristol. Both platforms have significant portions of their length fenced off, giving usable lengths of 91 yards (83 m) for the southern platform and 70 yards (64 m) for the northern.[6]

Facilities at the station are minimal – there is a wooden canopy and bench seating on the northern platform, with a small metal shelter on the southern. Timetable information is provided; help points show next train information and allow users to contact railway staff. There is no ticket office or other means for buying or collecting tickets. There is a car park with six spaces, as well as stands for four bicycles.[7] The nearest bus stops are 150 metres (160 yd) away on Avonmouth Road.[8]

The line through Avonmouth has a speed limit of 30 miles per hour (48 km/h) for locomotive-hauled trains and 50 miles per hour (80 km/h) for diesel multiple units. The line, which is not electrified, handles less than 5 million train tonnes per year, has a loading gauge of W6 and a route availability of 7.[6][9] In the 2013/14 financial year, more than 110,000 passengers used Avonmouth station, making it the 1,635th busiest station in the country and the sixth busiest within the Bristol unitary authority area. This was an increase of 175% from the 2002–03 financial year, and reflected a general rise in usage of the Severn Beach Line.[10][11][note 2] The 2014-15 estimates of station usage saw a further increase of 8% to 120,000 making it the 1,614th busiest station in the country.[12]

Services

Great Western Railway operate all services from Avonmouth, mainly using Class 150 Sprinter units.

Services at Avonmouth are all operated by Great Western Railway, using mainly Class 150 Sprinter units.[13][14] Avonmouth is the main terminus of the Severn Beach Line; as of 2015 there are 25 trains to and from Bristol Temple Meads each day from Monday to Friday, a service of three trains every two hours, giving a train every 40 minutes on average. Of these, one train every two hours runs to and from Severn Beach. Most services start at Bristol, but one evening service to Avonmouth starts at Weston-super-Mare. On Saturdays there is a similar level of service, at 24 trains per day. Sunday sees a roughly hourly service to and from Bristol, ten trains per day, with only two services extending to Severn Beach, except during the May–September timetable period when all services are extended. The first and last Sunday trains towards Bristol are extended to Taunton via Weston-super-Mare, and there are similar workings in the other direction.[15]

Most trains from Avonmouth to Temple Meads call at all stations, but some services omit Lawrence Hill. Trains making the journey to and from Severn Beach call at St Andrews Road alternately on the outward or return leg. The typical journey time to Bristol Temple Meads is roughly 30 minutes, and 12 minutes to Severn Beach.[15] In 2012, the single fare to Clifton Down or Severn Beach was £1.50, and £3 return for the whole line.[16]

Preceding station National Rail Following station
Terminus   Great Western Railway
Severn Beach Line
  Shirehampton
St Andrews Road    
Severn Beach    

History

Construction and early operations

The Railway Clearing House Atlas of 1914 shows the then-extensive railway network around Avonmouth.

The railways first came to Avonmouth in 1865, when services began on the Bristol Port Railway and Pier (BPRP), a self-contained railway which ran along the north bank of the River Avon to a deep water pier on the Severn Estuary. The BPRP line ran through the site of the current station and 1 mile 72 chains (3.1 km) beyond to a terminus at the first Avonmouth station. The BPRP ran into trouble by 1871 when the terminal pier at Avonmouth became difficult to use due to a build-up of silt. With no prospect of a proper dock being funded without a connection to the national rail network, the Clifton Extension Railway (CER) was approved. This was a joint venture by the BPRP, Great Western Railway (GWR) and Midland Railway (MR) which ran from Sneyd Park Junction, south of Sea Mills, via Clifton Down, to join up with the national network at Narroways Hill Junction.[3][17](p12) The link opened in 1877, but initially only for goods trains. The route from Sneyd Park Junction to Clifton Down was subsequently cleared for passenger use on 3 August 1878, but the Midland and Great Western Railways did not think the BPRP track was in a suitable condition and so refused to run any passenger trains beyond Clifton Down.[17](p49)

The station, originally known as Avonmouth Dock, was opened in 1877, shortly after the opening of the Avonmouth Docks in February that year. It was built on, or very near to, the site of a halt built in 1868 for the Docks' construction workers.[18] The local area was still mostly rural – there were a few buildings around the station area, as well as the docks, with the closest extent of the Bristol conurbation 1 mile (1.6 km) away at Shirehampton.[19] The station cost £275 to build, and was merely a platform on the south side of the single track, served by eight trains per day between Hotwells and the BPRP's Avonmouth terminus, increasing to ten per day from 1887.[17](p24) The Great Western and Midland Railways considered the station inadequate for the passenger numbers expected, and so purchased additional land to enhance the station with extra tracks. The new station comprised a wide island platform – the northern face on the original through line, the southern face being for a new terminal line. The station, now known as Avonmouth Dock Joint, was constructed using mainly wood and corrugated iron. It was opened on 1 September 1885, coinciding with the beginning of passenger services beyond Clifton Down.[18] The Great Western initially offered six trains per day each direction between Avonmouth Dock and Bristol Temple Meads. Fearing competition, the BPRP did not allow passengers to use GWR services between its stations. The Midland Railway did not run any passenger services beyond Clifton Down, apart from a one-month trial service in September 1885.[20](p41) Despite the increased traffic the BPRP suffered financially, and was taken over by the CER in 1890.[17](pp10–11) The BPRP's Avonmouth terminus closed to the public in 1902, after which all trains terminated at Avonmouth Dock.[18]

Early twentieth century

The station went through numerous enhancements in the first part of the twentieth century. A new platform canopy and urinal were provided in 1900 at a cost of £250. Further improvements followed in 1902 at a cost of £80; and in August 1904 significant enhancements to the station buildings and an extension of the platform cost a total of £1,570. A 60 feet (18 m) turntable was constructed in December 1903, with a signal box, known as Avonmouth Dock Passenger, installed at the end of the platform. Dedicated goods staff were employed from the start of 1904, with that year also seeing the installation of a run-around loop for the terminal platform. A small engine shed was added in January 1905.[18] In 1910, some passenger trains once again began to run beyond Avonmouth Dock, continuing towards Henbury on the newly opened Henbury Loop Line, which allowed goods trains to the docks to avoid the steep Clifton Down Tunnel.[17](p49)[20] Other trains arrived from London via the loop, connecting with steamer services to Canada and Jamaica.[20](p40) At this point there were 17 trains from Bristol to Avonmouth Dock and 15 back each day; increasing to 21 and 19 respectively by 1920.[17](p49) The station was well-staffed, with 25 station staff and 47 goods staff in 1913.[18] Positions included stationmaster; booking clerks; posters; and outdoor porters, who took goods to ships in the docks.[17](p47)

During the First World War, an Army Remount Service depot was located near Shirehampton. Over the course of the war, Avonmouth Dock Joint handled 35,000 animals, mainly horses and mules, en route to the depot. July 1917 saw the introduction of platform tickets, to capitalise on people using the station to bid farewell to friends heading overseas, or to welcome those returning. The platform was lengthened to 330 feet (100 m) in December 1917. A second through track was added in 1918, and so a new cinder-covered platform was built on the north side of the line. The two platforms were linked by a footbridge and a level crossing. The cost of the new platform and the lengthening works was £7,420.[18]

After the war, construction of the Bristol Portway along the Avon Gorge necessitated the closure of the line from Sneyd Park Junction to Hotwells, with trains along it ceasing on 3 July 1922. By this point there were nine trains per day from Hotwells, and eight return. To compensate for the loss of service, the Great Western provided an additional four trains daily from Avonmouth Dock to Bristol and six return. In 1923, grouping resulted in the Midland Railway being absorbed into the London, Midland and Scottish Railway (LMS), and the line continued in a joint arrangement between the Great Western and the LMS.[17](p49) The engine shed was closed in 1924.[18]

By the mid-1920s, the station was proving inadequate for the passenger numbers, and so work began on a comprehensive rebuild in 1926. The new buildings were made of brick; with a large, four-chimneyed building containing most of the facilities; as well as a separate parcels office. The northern platform had a wooden awning built, which is still in place today.[18]

From 1928 many services to Avonmouth Dock were extended to Severn Beach.[17](p49) By 1947, just before the railways were nationalised, there were 33 services each direction between Avonmouth Dock and Temple Meads, with 18 on Sundays.[20](p41) Some trains made circular trips to and from Temple Meads via Clifton Down and Henbury or Pilning.[16][18]

British Rail and privatisation

The station in 1992, looking along the lines towards Bristol.

When the railways were nationalised in 1948, services at Avonmouth Dock came under the aegis of the Western Region of British Railways. By 1955, service levels had decreased slightly to 28 trains per day from Bristol and 29 return, but the services were at regular intervals. Passenger numbers however dropped sharply in 1961 as the result of a fare increase, and so in 1962 a new reduced timetable was enacted, which lost more passengers. A year later in 1963, the Beeching report suggested the complete withdrawal of services along the line, but ultimately only those beyond Severn Beach or via Henbury were withdrawn.[17] Goods services from the station ended on 20 June 1966, the same day that the station was renamed "Avonmouth".[18][21] The bay platform was taken out of use and the land later taken for industrial buildings.[18] From 17 July 1967 all staffing was withdrawn from stations along the line, including Avonmouth, with tickets issued by the train guard.[17](pp49–51) The station buildings on the island platform survived into the 1970s, as did the footbridge, but with the exception of the parcels office, all were later demolished.[18][22][23] The parcels office was in use in 2006 as a hairdressing salon. The signal box was closed in January 1969, and in September 1973 the wooden level crossing gates were replaced by automatic lifting barriers.[18] By 1974, service had reduced to 19 trains per day in each direction, with no Sunday services to Severn Beach.[17](p50)[24]

British Rail was split into business-led sectors in the 1980s, at which time operations at Avonmouth passed to Regional Railways. At this time, all trains ran to Severn Beach, but the service pattern was irregular.[16] This changed in 1995 when an hourly timetable was introduced for peak times, but northbound services were terminated at Avonmouth.[20](p42)

When the railway was privatised in 1997, local services were franchised to Wales & West, which was succeeded by Wessex Trains, an arm of National Express, in 2001.[25][26] Following action by Friends of Severn Beach Railway and a string of protests, services had increased to 10 per day in each direction by 2005, with Bristol City Council providing a subsidy to Wessex Trains.[18][27] The Wessex franchise was amalgamated with the Great Western franchise into the Greater Western franchise from 2006, and responsibility passed to First Great Western, a subsidiary company of FirstGroup, subsequently rebranded as Great Western Railway in 2015.[28][29][30][31] A minimum service requirement was written into the franchise agreement, ensuring an hourly service along the line, and this has since been increased to three trains every two hours (25 trains per day).[15][32][33][34] Sunday services to Severn Beach were restored in 2010.[24]

Preceding station Historical railways Following station
Avonmouth (BPRP)[note 3]
Line and station closed.
  Bristol Port Railway and Pier
(1877–1890)
  Shirehampton
  Great Western Railway
Bristol Port Railway and Pier
(1890–1902)
 
Terminus   Great Western Railway
Clifton Extension Railway
(1885–1910)
  Shirehampton
Hallen Halt   Great Western Railway
Clifton Extension Railway
(1910–1917)
 
St Andrews Road   Great Western Railway
Clifton Extension Railway
(1917–1948)
 
  Western Region of British Railways
Severn Beach Line
(1948–1982)
 
  Regional Railways
Severn Beach Line
(1982–1997)
 
  Wales & West
Severn Beach Line
(1997–2001)
 
  Wessex Trains
Severn Beach Line
(2001–2006)
 

Future

The old parcel facility is all that remains of the station buildings, and is threatened with demolition.

The last remaining station building, the old parcels office, is threatened with demolition by Network Rail, which owns the station. Network Rail states that the building is beyond economic repair, but local rail campaigners, including Friends of Suburban Bristol Railways and MP Charlotte Leslie, have petitioned to prevent the demolition.[35][36][37]

First Great Western declined a contractual option to continue the Greater Western passenger franchise (of which services at Avonmouth are a part) beyond 2013, citing a desire for a longer-term contract due to the impending upgrade to the Great Western Main Line.[30] The franchise was put out to tender,[38][39][40] but the process was halted and later scrapped due to the fallout from the collapse of the InterCity West Coast franchise competition.[41] A two-year franchise extension until September 2015 was agreed in October 2013,[42][43] and subsequently extended until March 2019.[44][45][46]

With the coming upgrade to the Great Western Main Line, the main line from London to Bristol is due to be electrified by 2016.[47] However, the electrification will not extend beyond the main lines, so Avonmouth will continue to be served by diesel trains, with the current "Sprinter" units expected to be replaced by Class 165 and 166 "Networker Turbo" units.[48][49] Stephen Williams, MP for Bristol West; and the group Friends of Suburban Bristol Railways support the electrification being extended to the Severn Beach Line.[50][51]

Improved services at Avonmouth are called for as part of the Greater Bristol Metro scheme, a rail transport plan which aims to enhance transport capacity in the Bristol area.[52][53] There is an aspiration for half-hourly services, with trains towards Bristol terminating alternately at Portishead and Bath Spa, however due to the large sections of the Severn Beach Line which are single-track, and to the congested main line from Temple Meads, such frequency is not currently feasible.[54][55] The enhancement scheme was given the go-ahead in July 2012 as part of the City Deal, whereby local councils would be given greater control over money by the government.[56] There are also calls for the reopening of the Henbury Loop Line, which could allow a direct service from Avonmouth to Bristol Parkway.[57] Plans for a loop were rejected by the West of England Joint Transport Board, however Bristol City Councillors voted to send the decision back to the board for further discussion.[58][59]

See also

Wikimedia Commons has media related to Avonmouth railway station.

Notes

  1. Railways in the United Kingdom are, for historical reasons, measured in miles and chains. There are 80 chains to the mile.
  2. Annual estimated passenger usage based on sales of tickets in stated financial year(s) which end or originate at Avonmouth, from Office of Rail and Road statistics. Methodology may vary year on year.
  3. The Bristol Port Railway and Pier terminal station was simply called "Avonmouth".[18](pp38–41)

References

  1. OS Landranger Map 172 – Bristol & Bath. Southampton: Ordnance Survey. 2008. ISBN 978-0-319-22914-9.
  2. A-Z Bristol and Bath Deluxe (2nd ed.). Sevenoaks, Kent: Geographers' A-Z Map Co. Ltd. 2003. ISBN 1-84348-099-9.
  3. 1 2 Deaves, Phil. "Engineers' Line References: CNX Clifton Extension Line". Retrieved 22 October 2014.[refnote 1]
  4. Deaves, Phil. "Engineers' Line References: AMB Avonmouth Branch". Retrieved 21 October 2014.
  5. Baker, S.K. (2010). Rail Atlas of Great Britain and Ireland (12th ed.). Ian Allan. p. 28. ISBN 978-0-86093-632-9.
  6. 1 2 "Network Capability – Baseline Declaration: (1) Track and Route mileage: (2) Line-speeds: Western Route" (PDF). Network Rail. 1 April 2009. p. 178. Retrieved 11 October 2013.
  7. "Station facilities for Avonmouth (AVN)". National Rail. Retrieved 31 March 2015.
  8. "Avonmouth Station: Onward Travel Information" (PDF). Network Rail. 2014. Retrieved 31 March 2015.
  9. "Route 13: Great Western Main Line" (PDF). Network Rail. 2006. Figures 3, 6 and 8. Retrieved 20 October 2014.
  10. "Station Usage Estimates 2002/03". Office of Rail and Road. Retrieved 23 September 2013.
  11. "Station Usage Estimates 2013/14". Office of Rail and Road. Retrieved 31 March 2015.
  12. "Station Usage Estimates 2014/15". Office of Rail and Road. Retrieved 2016-02-16.
  13. "First Great Western will add to service on successful Severn Bridge rail line". This is Bristol. Northcliffe Media. 25 January 2011. Retrieved 23 June 2012.
  14. Miles, Tony (December 2010). "LOROL Class 150s all with FGW". Modern Railways. London. p. 90.
  15. 1 2 3 "Central 6 – Bristol to Severn Beach: The Severn Beach Line" (PDF). Great Western Railway. May 2015. Retrieved 22 September 2015.
  16. 1 2 3 Salveson, Paul (June 2012). Abell, Paul, ed. "Severn Beach: Not your typical branch line!". Today's Railways. Sheffield: Platform 5 (126): 42–47.
  17. 1 2 3 4 5 6 7 8 9 10 11 12 Maggs, Colin (1975). The Bristol Port Railway and Pier. The Oakwood Press. pp. 3–7, 10–12, 15–18, 23–24, 47–51.
  18. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 Oakley, Mike (2006). Bristol Railway Stations 1840–2005. Redcliffe Press. pp. 42–44. ISBN 1-904537-54-5.[refnote 1]
  19. "Ordnance Survey One Inch map, sheet 264". Ordnance Survey. 1898. Retrieved 22 September 2015.
  20. 1 2 3 4 5 Maggs, Colin G (2008) [First published 1981]. Rail Centres: Bristol (#21) (3rd ed.). Nottingham: Booklaw Publications. pp. 15–17, 40–42, 107–108. ISBN 1-901945-30-8.
  21. Butt, R. V. J. (1995). The Directory of Railway Stations: details every public and private passenger station, halt, platform and stopping place, past and present (1st ed.). Sparkford: Patrick Stephens Ltd. p. 22. ISBN 1-8526-0508-1. OCLC 60251199.
  22. Andy Kirkham (1970s). "Avonmouth station in the 1970s". Bristol Railway Archive. Retrieved 11 September 2015.
  23. Mitchell, Vic & Smith, Keith (2004). Branch Lines Around Avonmouth: Hotwells, Severn Beach and via Henbury. Midhurst, Sussex: Middleton Press. ISBN 1-904474-42-X.
  24. 1 2 "Sunday service puts smiles on faces of rail enthusiasts". This is Bristol. Northcliffe Media. 24 May 2010. Retrieved 16 July 2012.
  25. Deaves, Phil (5 May 2015). "UK railway franchises". Retrieved 6 May 2015.
  26. "Wales and West". Wales & West. Retrieved 9 June 2012.
  27. "Lobby to save Severn Beach line". BBC News. BBC. 27 February 2006. Retrieved 16 July 2012.
  28. "Wessex Trains". The Iron Road: Railway Photography by Scott Borthwick. Retrieved 29 September 2013.
  29. "FirstGroup wins rail franchises". BBC News. BBC. 13 December 2005. Retrieved 27 April 2012.
  30. 1 2 "First Great Western bids for longer rail franchise deal". BBC News. BBC. 11 May 2011. Retrieved 27 April 2012.
  31. "The Great Western Railway is back in business". Railnews. 21 September 2015. Retrieved 21 September 2015.
  32. "Friends of Suburban Bristol Railways making rail difference". This is Bristol. Northcliffe Media. 25 September 2010. Retrieved 14 April 2012.
  33. "Campaigners' picnic marks rail launch". This is Bristol. Northcliffe Media. 17 July 2010. Retrieved 14 April 2012.
  34. "Campaigners call for quick railway action". This is Bristol. Northcliffe Media. 15 September 2010. Retrieved 14 April 2012.
  35. Wood, David (26 January 2015). "We have already lost too many station buildings". Bristol Post. Local World. Retrieved 15 September 2015.
  36. "Avonmouth station demolition plan fought by campaigners". BBC News. BBC. 16 January 2015. Retrieved 15 September 2015.
  37. Booth, Martin (19 January 2015). "Fight to save Avonmouth station building". Bristol 24/7. Retrieved 15 September 2015.
  38. Haigh, Philip (18 April 2012). "First leads a field of seven bidding for rail franchises". RAIL magazine. Peterborough: Bauer Media (694): 8–9.
  39. "Great Western franchise to be extended". Railnews. 19 July 2012. Retrieved 19 July 2012.
  40. "New Great Western franchise to deliver new express trains" (Press release). Department for Transport. 27 July 2012. Retrieved 29 July 2012.
  41. "Great Western London to south Wales rail contest scrapped". BBC News. BBC. 31 January 2013. Retrieved 31 January 2013.
  42. "First celebrates last-minute Great Western deal". Railnews. 3 October 2013. Retrieved 4 October 2013.
  43. "First Great Western retains Wales and west rail franchise". BBC News. BBC. 3 October 2013. Retrieved 4 October 2013.
  44. "First Great Western offered new franchise deal". BBC News. BBC. 10 October 2014. Retrieved 10 October 2014.
  45. "FirstGroup wins Great Western contract extension". The Guardian. Guardian Media Group. 10 October 2014. Retrieved 10 October 2014.
  46. "Updated franchise schedule signals GW extension". Railnews. 10 October 2014. Retrieved 10 October 2014.
  47. "Modernising the Great Western" (PDF). Network Rail. Retrieved 9 June 2012.
  48. "Bristol to London line to be electrified". This is Bristol. Northcliffe Media. 23 July 2009. Retrieved 5 April 2012.
  49. Clinnick, Richard (15 April 2015). "How the West will win with new trains". RAIL magazine. Peterborough: Bauer Media (772): 58–59. Retrieved 12 October 2015.
  50. "Benefits of Bristol to London high-speed rail link 'must go beyond just mainline'". This is Bristol. Northcliffe Media. 3 March 2011. Retrieved 5 April 2012.
  51. "FoSBR Newsletter" (PDF). Friends of Suburban Bristol Railways. Autumn 2011. Retrieved 9 April 2012.
  52. White, James (13 March 2009). "Item 04: Greater Bristol Metro" (PDF). West of England Partnership. Retrieved 28 December 2011.
  53. "Campaign for trains from Bristol Temple Meads every half hour". This is Bristol. Northcliffe Media. 17 January 2012. Retrieved 19 January 2012.
  54. "FoSBR Newsletter" (PDF). Friends of Suburban Bristol Railways. April 2014. Retrieved 20 November 2014.
  55. "Transport Minister hears calls for better Bristol train service". This is Bristol. Northcliffe Media. 17 October 2009. Retrieved 14 April 2012.
  56. Ribbeck, Michael (6 July 2012). "£100 million Bristol Metro train network by 2016". The Post, Bristol. Northcliffe Media. Retrieved 6 July 2012.
  57. "Our Case". Friends of Suburban Bristol Railways. Retrieved 15 April 2012.
  58. "Transport chiefs drop Henbury Loop plan". BBC News. BBC. 17 July 2015. Retrieved 16 September 2015.
  59. "Huge majority back rethink on decision for Henbury Loop at a special meeting". Bristol Post. Local World. 28 August 2015. Retrieved 16 September 2015.

Notes to references

  1. 1 2 Note that this refers to the station by its original name, Avonmouth Dock.
This article is issued from Wikipedia - version of the 9/7/2016. The text is available under the Creative Commons Attribution/Share Alike but additional terms may apply for the media files.