Hardy Farm tram stop
Hardy Farm | |
---|---|
Metrolink | |
Location | |
Place | Chorlton-cum-Hardy |
Local authority | City of Manchester |
Fare zone information | |
Present status | Proposed station |
History | |
Opening | N/A |
UK Trams portal |
Hardy Farm tram stop was a proposed future tram stop on the phase 3b plans to Manchester Airport. It was due to open in 2016 but was dropped from the plans.
References
- "Future extensions". Archived from the original on April 8, 2010.
- "Airport" (PDF). Archived from the original (PDF) on March 5, 2012.
Preceding station | Manchester Metrolink | Following station | ||
---|---|---|---|---|
Under Construction | ||||
towards Manchester Airport | Manchester Airport Line | towards Chorlton |
Coordinates: 53°25′49″N 2°16′42″W / 53.4303°N 2.2784°W
This article is issued from Wikipedia - version of the 4/18/2016. The text is available under the Creative Commons Attribution/Share Alike but additional terms may apply for the media files.