Hough End tram stop
Hough End | |
---|---|
Metrolink | |
Location | |
Place | Chorlton-cum-Hardy |
Local authority | City of Manchester |
Fare zone information | |
Present status | Proposed station |
History | |
Opening | N/A |
UK Trams portal |
Hough End tram stop was a proposed tram stop on the phase 3b plans to Manchester Airport. It was originally due to open in 2016 but was dropped from the plans.
References
Preceding station | Manchester Metrolink | Following station | ||
---|---|---|---|---|
Under Construction | ||||
towards Manchester Airport | Manchester Airport Line | towards Chorlton |
Coordinates: 53°26′15″N 2°15′44″W / 53.4376°N 2.2621°W
This article is issued from Wikipedia - version of the 4/18/2016. The text is available under the Creative Commons Attribution/Share Alike but additional terms may apply for the media files.