Timeline of Manchester Metrolink

This timeline of Metrolink lists significant events in the history of Greater Manchester's light rail network, also referred to as Manchester Metrolink.

1960s

1968
1969
  • SELNEC PTE (the South East Lancashire North East Cheshire Passenger Transport Executive) is established on 1 November 1969 with reference to the Transport Act 1968 to improve public transport in Manchester and its surrounding municipalities.[2]

1970s

1972
1973
1974
  • The Greater Manchester County Council publishes its structure plan in January 1974,[7] acknowledging its obligation to provide "an integrated and efficient system of public transport".[8]
  • Greater Manchester is formally established as a metropolitan county of England on 1 April 1974; SELNEC PTE becomes the Greater Manchester Passenger Transport Executive (GMPTE), a functional body of the Greater Manchester County Council tasked with operating and improving public transport in the region.[2][9]
  • Greater Manchester County Council submit a bid to the United Kingdom Government to acquire funding for the Picc-Vic tunnel.[10]
1977
  • Unable to secure funding from the government,[11] the Greater Manchester County Council abandons plans for the Picc-Vic tunnel on economic grounds.[12][10]

1980s

Docklands Light Railway rolling stock on public display in Debdale Park on 9 February 1987
1982
  • GMPTE conclude that an overground metropolitan light rail system to replace or complement the region's under-used heavy railways is the most economical solution to improving Greater Manchester's public transport network.[8]
1983
  • As part of its proposals for light rail, GMPTE suggest that the Oldham Loop Line be re-routed and extended with on-street tramways through Oldham and Rochdale town centres.[13]
  • The Greater Manchester County Council purchases a disused section of the Cheshire Lines Committee railway between Chorlton-cum-Hardy and Didsbury for £1, hoping to stop development along the route and preserve it for use with a future light rail network.[14]
1984
  • A Rail Study Group composed of officials from British Rail, Greater Manchester County Council and GMPTE, formally endorse a light rail system for Greater Manchester.[8]
1985
  • The Local Government Act 1985 receives Royal Assent on 16 July 1985, stating that "the Greater London Council; and the metropolitan county councils" shall cease to exist.
1986
  • The Greater Manchester County Council is abolished on 31 March 1986 under the Local Government Act 1985. GMPTE becomes a joint-board of the ten district councils of Greater Manchester.[2]
  • GMPTE propose that Greater Manchester's light rail system include a line to Salford Quays to complement the regeneration of the Manchester Docks.[15][16]
1987
1988
1989

1990s

Metrolink under construction in 1991, as viewed from Manchester Piccadilly Station
1990
  • The contract to design, build, maintain and operate Metrolink is formally signed on 6 June 1990.[24]
  • Legal authority to construct a Metrolink line to Salford Quays is acquired.[15][16]
1991
  • The Bury Line between Manchester and Bury is closed in stages between 13 July 1991 and 17 August 1991. Its 1200 V DC third rail electrified line is adapted for a 750 V DC overhead line operation.[25]
1992
  • Metrolink begins its first passenger service on 6 April 1992 on a route between Victoria and Bury.[26][27]
  • Metrolink services expand beyond Victoria to G-Mex tram stop on 27 April 1992.[27]
  • Phase 1 on Metrolink's construction is completed with a service through to Altrincham joining the network on 15 June 1992.[27]
  • Elizabeth II declares Metrolink open at a ceremony in Manchester on 17 July 1992, stating that Metrolink would "improve communication" between northern and southern Greater Manchester.[28][27][29]
1994
  • A public consultation and public inquiry result in government endorsement of a Metrolink line to Salford Quays in 1994.[25][15][16]
1995
1997
  • In April 1997 Altram, a consortium of the Serco Group plc, Gio. Ansaldo & C. and John Laing plc is appointed to construct the Eccles line; Serco takes on responsibility to operate and maintain the whole network under contract.[15][16][30]
  • Serco Metrolink, a wholly owned subsidiary of Serco Limited, take over the operations and maintenance of Metrolink on 26 May 1997.[31]
  • Construction of the Eccles Line officially begins on 17 July 1997.[15][16][30]
1999
  • The Eccles Line is officially opened as far as Broadway tram stop on 6 December 1999 by the Prime Minister, Tony Blair, who praises Metrolink as "exactly the type of scheme needed to solve the transport problems of the metropolitan areas of the country".[32][33]

2000s

2000
2001
2003
  • In March 2003, Serco Investments buy out its partners; Altram (Manchester) Limited becomes a wholly owned subsidiary of Serco.[31]
2004
  • A derailment occurs at Shudehill on 31 August 2004.[35]
2005
  • A derailment occurs on London Road on 11 January 2005.[35]
  • Work on Central Park tram stop and a flyover at Newton Heath over the heavy Caldervale Line commences in April 2005.[36]
  • On 8 November 2005 a near miss occurs between two track workers and a tram; the tram ran over track maintenance equipment.[37]
2006
  • A derailment occurs on 22 March 2006 at Long Millgate, Manchester, as a result of a track defect.[35]
  • A person becomes trapped under a Metrolink vehicle on 20 May 2006, causing a three-hour delay on the system.[37]
2007
2008
2009
  • In May 2009, Greater Manchester Integrated Transport Authority (formerly GMPTA) and AGMA agree to create the Greater Manchester Transport Fund, £1.5billion raised from a combination of a levy on council tax in Greater Manchester, government grants, contributions from the Manchester Airports Group, Metrolink fares and third-party funding for "major transport schemes" in the region.[47][20]
  • The Oldham Loop Line closes on 3 October 2009 for conversion from heavy rail to Metrolink.[48][49]

2010s

2010
  • Phase 3b is approved with funding on a line-by-line basis between March and August 2010.[20][50]
  • MediaCityUK tram stop station opens to passengers on 20 September 2010.
2011
2012
2013
2014
2015
2016

See also

References

  1. Fawcett 2000, p. 19.
  2. 1 2 3 4 Hellewell & Reeve 2013, p. 5.
  3. "Manchester unearths forgotten 1970s tube line". Architects Journal. 13 March 2012. Retrieved 2013-03-07.
  4. HMSO. Local Government Act 1972. 1972 c.70
  5. "Manchester's tube train that never was". The Guardian. guardian.co.uk. 14 March 2012. Retrieved 2013-03-07.
  6. "British Local Election Database, 1889–2003". Arts and Humanities data service. 28 June 2006. Retrieved 5 March 2008.
  7. Frangopulo 1977, p. 246.
  8. 1 2 3 Holt 1992, pp. 6–7.
  9. Frangopulo 1977, p. 187.
  10. 1 2 Holt 1992, p. 5.
  11. Donald, Cross & Bristow 1983, p. 45.
  12. Ogden & Senior 1992, p. 22.
  13. 1 2 Young 2008, p. 163.
  14. 1 2 Kirby, Dean (23 May 2013). "First passengers travel on tram extension to East Didsbury". Manchester Evening News. manchestereveningnews.co.uk. Retrieved 2013-05-24.
  15. 1 2 3 4 5 6 7 GMPTE 2000.
  16. 1 2 3 4 5 6 GMPTE 2003, p. 10.
  17. Ogden & Senior 1992, p. 37.
  18. Holt 1992, pp. 92–93.
  19. "Metrolink trams reach Oldham Mumps". Railway Gazette International. railwaygazette.com. 13 June 2012. Retrieved 2013-01-13.
  20. 1 2 3 "Manchester Metrolink Phase 3b confirmed". Railway Gazette International. railwaygazette.com. 5 August 2010. Retrieved 2013-01-19.
  21. "Bringing Metrolink to Oldham and Rochdale" (PDF). tfgm.com. 2000. Retrieved 2013-01-15.
  22. Holt 1992, pp. 26–27.
  23. Ogden & Senior 1992, p. 51.
  24. 1 2 3 Ogden & Senior 1992, p. 47.
  25. 1 2 3 4 Kessell, Clive (30 November 2011). "Manchester Metrolink 20 Years of Evolution". therailengineer.com. Retrieved 2013-01-02.
  26. Ogden & Senior 1992, p. 82.
  27. 1 2 3 4 Holt 1992, p. 90.
  28. GMPTE 2003, p. 9.
  29. "Manchester's oldest Metrolink trams to be replaced". bbc.co.uk. 17 July 2012. Retrieved 2013-01-20.
  30. 1 2 "Manchester Metrolink, United Kingdom". railway-technology.com. Retrieved 2013-01-10.
  31. 1 2 "Past, Present and Future" (PDF). Metrolink. 2003. Retrieved 2008-12-28.
  32. Ward, David (2 August 2004). "Tram fury rattles ministers". The Guardian. guardian.co.uk. Retrieved 2013-01-05.
  33. GMPTE 2003, p. 13.
  34. "Whistle-stop Princess takes home hat souvenir". Manchester Evening News. menmedia.co.uk. 9 January 2001. Retrieved 2013-01-08.
  35. 1 2 3 http://www.raib.gov.uk/cms_resources.cfm?file=/070416_R082007_Long_Millgate.pdf
  36. Satchell, Clarissa (6 April 2005). "Tram interchange gets £36m go-ahead". Manchester Evening News. menmedia.co.uk. Retrieved 2013-01-19.
  37. 1 2 http://www.transportforgreatermanchestercommittee.gov.uk/download/1539/item_08_metrolink_performance
  38. http://www.raib.gov.uk/cms_resources/080424_R092008_Pomona.pdf
  39. "Stagecoach signs Manchester Metrolink contract". Press release. Stagecoach Group. 2007-05-29. Retrieved 2008-12-28.
  40. "Stagecoach take over tram service". BBC News. British Broadcasting Corporation. 15 July 2007. Retrieved 2008-11-01.
  41. Young 2008, p. 160.
  42. "The Link" (PDF). tfgm.com. 2008. Retrieved 2013-01-15.
  43. "Trams resume following derailment". BBC News. 30 June 2008. Retrieved 2012-12-22.
  44. http://www.raib.gov.uk/cms_resources.cfm?file=/090917_R252009_St_Peters_Square_v2.pdf
  45. "Date set for C-charge referendum". BBC News. news.bbc.co.uk. 29 September 2008. Retrieved 5 January 2010.
  46. Sturcke, James (12 December 2008). "Manchester says no to congestion charging". The Guardian. guardian.co.uk. Retrieved 12 December 2008.
  47. TfGM 2012, p. 14.
  48. Kirby, Dean (1 October 2009). "Signalman reaches end of line". Manchester Evening News. menmedia.co.uk. Retrieved 5 October 2009.
  49. "End of era as loop line is replaced". Manchester Evening News. menmedia.co.uk. 26 September 2008. Retrieved 5 October 2009.
  50. "Ashton and Didsbury Metrolink extensions funded". Railway Gazette International. railwaygazette.com. 8 March 2010. Retrieved 2013-01-20.
  51. "Manchester Metrolink starts Phase 3b". Railway Gazette International. railwaygazette.com. 22 March 2011. Retrieved 2013-01-19.
  52. "All change: Greater Manchester Passenger Transport Executive becomes Transport for Greater Manchester – with a new logo of course". Manchester Evening News. manchestereveningnews.co.uk. 1 April 2011. Retrieved 2013-02-11.
  53. http://www.raib.gov.uk/cms_resources.cfm?file=/120530_R082012_Piccadilly_Gardens.pdf
  54. Jones, Chris (27 July 2011). "Kingsway developers to foot the bill for Metrolink tram stop". Manchester Evening News. menmedia.co.uk. Retrieved 2013-01-19.
  55. "RATP buys Manchester Metrolink operator". Railway Gazette International. 2 August 2011.
  56. Britton, Paul (25 November 2012). "Giant construction project to position 580-tonne bridge over M56 completed eight hours early". Manchester Evening News. manchestereveningnews.co.uk. Retrieved 2013-02-16.
  57. Kirby, Dean (12 December 2012). "Shaw and Crompton Metrolink trams start this Sunday". Manchester Evening News. menmedia.co.uk. Retrieved 12 December 2012.
  58. "Metrolink stations 'to boost two Greater Manchester areas'". bbc.co.uk. 16 December 2012. Retrieved 16 December 2012.
  59. Glendinning, Amy (21 December 2012). "Delays after Metrolink tram derails in Piccadilly Gardens". Retrieved 20 July 2016.
  60. "Truck collides with Eccles bound tram in Weaste and closes Eccles New Road". Manchester Evening News. 6 February 2013. Retrieved 2013-03-14.
  61. TfGM (1 February 2013). "It's the final countdown". tfgm.com. Retrieved 2013-02-01.
  62. Kirby, Dean (11 February 2013). "Trams begin test-running on new Metrolink line to Rochdale". Manchester Evening News. manchestereveningnews.co.uk. Retrieved 2013-02-11.
  63. TfGM (20 February 2013). "Next stop: Rochdale!". tfgm.com. Retrieved 2013-02-20.
  64. "Next stop: Rochdale!". Rochdale Online. rochdaleonline.co.uk. 20 February 2013. Retrieved 2013-02-20.
  65. Kirby, Dean (12 May 2013). "Manchester city centre tram stop reaches the end of the line". Manchester Evening News. manchestereveningnews.co.uk. Retrieved 2013-05-17.
  66. Kirby, Dean (22 May 2013). "Destination Didsbury – Metrolink trams to start tomorrow, three months early". Manchester Evening News. manchestereveningnews.co.uk. Retrieved 2013-05-22.
  67. "Overnight Metrolink works in July". Rochdale Online. 8 July 2013. Retrieved 2013-07-08.
  68. Kirby, Dean (8 July 2013). "Metrolink trams set to start rolling into Ashton-under-Lyne". Manchester Evening News. Retrieved 2013-07-08.
  69. "Pensioner Found Dead on Metrolink Line". Manchester Evening News. 6 February 2013. Retrieved 31 July 3012. Check date values in: |access-date= (help)
  70. "Metrolink Tram Collides with Car in City Centre". Manchester Evening News. 1 August 2013. Retrieved 4 August 2013.
  71. "Metrolink Tram Derails Blocking the Line to Bury". Manchester Evening News. 3 August 2013. Retrieved 4 August 2013.
  72. Wellings, Richard (August 2013). "The high-Speed gravy Train: IEA Current Controversies Paper No. 46" (PDF). Institute of Economic Affairs.
  73. "The first tram now arriving at the new Oldham Mumps.". Oldham Evening Chronicle. 20 August 2013. Retrieved 21 August 2013.
  74. "How HS2 could transform Manchester Piccadilly station". globalrailnews.com. 5 September 2013. Retrieved 6 September 2013.
  75. Williams, Jennifer (4 September 2013). "Revealed: Plans for massive Piccadilly station revamp – if HS2 goes ahead". Manchester Evening News. Retrieved 6 September 2013.
  76. Bennetts Associates (August 2013). "HS2 Manchester Piccadilly: Strategic Regeneration Framework Draft". Retrieved 6 September 2013.
  77. "Testing, testing, one, two, tram!". Tameside Reporter. 5 September 2013. p. 3.
  78. "Twitter / TamesideCouncil: CllrRobinson announces that ...". Tameside Council. Twitter. 10 September 2013. Retrieved 11 September 2013.
  79. "Metro Arrives Early". Tameside Reporter. 11 September 2013. Retrieved 12 September 2013.
  80. "Work begins on latest Metrolink stop". placenorthwest.co.uk. 17 September 2013. Retrieved 17 September 2013.
  81. http://www.metrolink.co.uk/futuremetrolink/Documents/Metrolink-St-Peters-Square-blockade-bus-replacement-services.pdf
  82. "Next stop Exchange Square! Metrolink trams now running to new city centre stop". TfGM. Retrieved 20 July 2016.
  83. Cox, Charlotte (27 June 2016). "Commuters face first full day of disruption as Eccles Metrolink line is closed for two months". Retrieved 20 July 2016.

Bibliography

  • Docherty, Iain; Shaw, Jon (20 July 2011). A New Deal for Transport: The UK's struggle with the sustainable transport agenda. John Wiley & Sons. ISBN 978-1-4443-5551-2. 
  • Donald, T.; Cross, M.; Bristow, Roger (1983). English Structure Planning. Routledge. ISBN 0-85086-094-6. 
  • Fawcett, Paul (2000). Managing Passenger Logistics: The Comprehensive Guide to People and Transport. Kogan Page Publishers. ISBN 978-0-7494-3214-0. 
  • Frangopulo, Nicholas Joseph (1977). Tradition in action: the historical evolution of the Greater Manchester County. EP Publishing. ISBN 0-7158-1203-3. 
  • GMPTE (2000). Metrolink, Transforming Our Future: A Network for the 21st Century. Manchester: GMPTE Promotions. 
  • GMPTE (2003). Metrolink: A Network for the 21st Century (PDF). Manchester: GMPTE Promotions. 
  • GMPTE (2009). The Link/2: Metrolink news and developments from GMPTE (PDF). Manchester: GMPTE Promotions. 
  • GMPTE (2010). The Link/3: Metrolink news and developments from GMPTE (PDF). Manchester: GMPTE Promotions. 
  • Hellewell, Scott; Reeve, Colin (2013). Metrolink: Oldham to Chorlton including the Oldham Loop Line. Venture. ISBN 978-1-905304-53-0. 
  • Holt, David (1992). Manchester Metrolink. UK light rail systems; no. 1. Sheffield: Platform 5. ISBN 1-872524-36-2. 
  • Ogden, Eric; Senior, John (1992). Metrolink. Glossop, Derbyshire: Transport Publishing Company. ISBN 0-86317-155-9. 
  • Ogden, Eric; Senior, John (1991). Metrolink: Official Handbook. Glossop, Derbyshire: Transport Publishing Company. ISBN 0-86317-164-8. 
  • TfGM (2012). Annual Report 2011/2012: Connecting Greater Manchester (PDF). Manchester: Transport for Greater Manchester. 
  • TfGM; GMCA (2011). Greater Manchester's third Local Transport Plan 2011/12 – 2015/16 (PDF). Transport for Greater Manchester. 
  • Williams, Gwyndaf (2003). The Enterprising City Centre: Manchester's Development Challenge. Routledge. ISBN 978-0-415-25262-1. 
  • Young, Tony (2008). Tramways in Rochdale: Steam, Electric and Metrolink. Light Rail Transit Association. ISBN 978-0-948106-34-7. 
Wikimedia Commons has media related to Manchester Metrolink.
This article is issued from Wikipedia - version of the 8/22/2016. The text is available under the Creative Commons Attribution/Share Alike but additional terms may apply for the media files.