List of power stations in Iran
This is a list of power stations in Iran. By 2012, Iran had 400 power plant units.[4] Iran had a total installed electricity generation capacity of 70,000 MW by the end of 2013 (increasing from 90 MW in 1948 & 7024 MW in 1978[5][6][7]) and plans to add annually more than 5,000 MW of generation capacity to the grid, doubling Iran's total power generation capacity to 122,000 MW by 2022[8][9] The government of Iran has plans to privatize 20 power plants by September 2010.[10] Iran's peak demand for electricity in 2013 was 45,693 MW in summer time.[11]
Iran was predicted to account for 17.08% of MENA power generation by 2014. Gas was the dominant fuel in Iran in 2009, accounting for an estimated 56.8% of primary energy demand (PED), followed by oil at 40.8% and hydro with a 1.4% share of PED.[12] As at 2010, the average efficiency of power plants was 38 percent. The figure should reach 45 percent within five years and 50 percent under Vision 2025.[13][14]
Electricity generation in 2008, amounted to 203.8 billion kWh or roughly one percent of world's total production which was up by 5.9 percent compared with the previous year. In 2008, of total generated electricity, 190.2 billion kWh (93.3 percent) was generated by power plants affiliated with the Ministry of Energy and 13.6 billion kWh (6.7 percent) by other institutions, mostly in the private sector.[15][16][17] The largest share of electricity (91.1 billion kWh) was generated by steam power plants while diesel power plants accounted for the lowest share of generation (0.2 billion kWh). Also in 2008, the highest growth in generation of electricity belonged to gas and combined cycle power plants with 9.3 percent growth rate; however, the amount of electricity generated by hydroelectric power plants showed 1.7 percent decline. The consumer price of electricity in Iran as of 2010 was 1.6 US cents per kilowatt hour while the real production cost was eight US cents.[16][18] (See also: Cost of electricity by different sources)
In 2010, 900,000 people were working directly or indirectly for the power industry in Iran. The country spare capacity stands at 3 per cent, where it should ideally be 25 per cent.[18] It has been reported that 23.5 per cent of the electricity generated goes to waste in the transmission network.[18] Iran exports annually 5.5 TWh of electricity to seven countries surrounding Iran.[19] Iran's electricity grid is currently connected to Afghanistan, Pakistan, Iraq, Turkey, Armenia, Azerbaijan and Turkmenistan.[20]
Manufacturing
Electric power industry has achieved self-sufficiency in producing its required equipment.[21] While most of the electricity generators are run by the government, the equipment producers and contractors are generally from the private sector.[18] Iran is among the top ten manufacturers of gas turbines with a capacity of 160 megawatts.[22] Iranian experts of JEMCO (a subsidiary of IDRO) have succeeded in developing the capacity to produce one-megawatt and four-megawatt generators.[23][24] Iran has acquired self-sufficiency of over 80 percent in constructing hydraulic turbines and over 90 percent in producing gas turbines. Within the next few years, Iran can join the list of countries that produce power plant technology (2009).[25] Iran plans to manufacture its first indigenous gas turbines by 2015.[26] Iran has achieved the technical expertise to set up hydroelectric, gas and combined cycle power plants.[27][28] Iran is among the four world countries that are capable of manufacturing advanced V94.2 gas turbines.[29] The Industrial Development and Renovation Organization of Iran (IDRO) is currently building the country's first 4-megawatt (MW) CHP (Combined Heat and Power) turbo generator in cooperation with the private sector.[30]
Nuclear power plants
Darkhovin Nuclear Power Plant is Iran's first indigenously designed and built power plant besides the research reactor of IR-40.[31][32][33] Bushehr Nuclear Power Plant is Iran's first nuclear power plant and it has been manufactured with the technical assistance of Russia.
International projects
Iran is not only self-sufficient in power plant construction but has also concluded a number of contracts on implementing projects in neighboring states.[1][2][3] As of 2010, Iranian energy and resource development firms are involved in 50 projects worth over USD 2.2 billion in more than 20 countries across the world.[34] As at 2011, MAPNA was building power plants in Syria, Oman and Iraq and negotiations were underway to build two power plants in Lebanon.[35]
One of Iran’s most important international projects will see the construction of a $200-million hydroelectric dam in Nicaragua starting 2011. Iran is currently engaged in dam construction in Tajikistan, Armenia and Azerbaijan, and consultations are underway with a number of other countries. Kenya, Sri Lanka, Bolivia and Mali are the potential target markets being considered for exporting the country’s technical and engineering services.[36] In 2010, Iran won a contract to build a dam in Afghanistan and the third contract to build a power plant station in Syria.[37] In December 2005 a wind farm was put in operation at Pushkin Pass in Armenia. Total installed capacity of the farm is 2.64 MW, comprise from the four 660 kW wind turbines. Wind farm was built by support of 3.1 mln US$ grant from the government of Islamic Republic of Iran.[38] The Armenian and Iranian energy sectors are currently jointly constructing the Iran-Armenia Wind Farm which is set to become the country's largest wind farm, having an installed electric capacity of 90 MW.[39] As at 2012, Iran is building seven large power plants in Syria, Oman, Iraq, and Tajikistan.[40]
Foreign direct investment
According to the Ministry of Energy, Germany has invested $445 million in construction of the Pareh-Sar combined cycle power plant in northern Iran, while the UAE has invested $720 million in construction of a gas power plant as well as a combined cycle power plant in Isfahan and Shiraz.[12] In 2015, Iran and Russia signed an agreement regarding the construction of eight thermal power plants in Iran, with a total installed capacity of 2,800 Megawatts (MW). The investment per MW will be $3.57 million ($10 billion in total).[41]
Privatization
Mapna Company. Sahand, Bistoun, Shazand, Shahid Montazeri, Tous, Shahid Rajaei and Neishabour power stations are among the profit-making plants, work on privatizing them will be finalized by late March 2007.[43] Jahrom, Khalij-e Fars (Persian Gulf) and Sahand power plants will be ceded to the private sector in 2009.[44][45] All domestic power plants will be privatized gradually, except those the government feels it should run to ensure security of the national electricity grid. Power plants of Damavand, Mashhad, Shirvan, Kerman, Khalij-e Fars, Abadan, Bisotoon, Sanandaj, Manjil and Binalood, which have been turned into public limited firms, are ready for privatization.[46] As of 2010, 20 power plants were ready for privatization in Iran.[47] Upon ceding the 20 power plants to IPO, some 40 percent of the capacity of power plants nationwide will be assigned to the private and cooperative sectors.[48] As of 2011, about 45 power plants across the country were to be handed over to the private sector.[49] In 2012, it was announced that Iran's government which has already turned over 17 of its 45 power plants to the private sector since 2008, will transfer 28 more plants with an estimated value of $11.4 billion (USD), by March 2013.[50]
Energy/electricity bourse
The new energy/electricity bourse will be inaugurated in 2012.[51] This will bring about more competition and transparency in Iran’s electricity market.[52] Experts believe that following the launch of the subsidies reform plan, the electricity industry will undergo significant changes and will become more appealing to private investors.[53] Iran is the 16th electricity producer in the world.[4]
As at 2012, Iran had over 400 power plant units and 38 electricity distribution companies which buy the electricity from producers.[4] Iran has over 100 companies which consume more than 20 MW of electricity per year.[4] The average price of each kilowatt of electricity is 450 rials (around 5 cents) during the first phase of the Subsidy Reform Law. The average final price of each kilowatt of electricity will be 1000 rials (around 10 cents) in 2015.[54] According to the government of Iran, power stations have to pay the export price of gas if they want to export electricity and must improve efficiency.[55]
Iran's electricity export and related technical and engineering services exports was valued at $4 billion in 2011.[56] In 2010, the total of Iran’s electricity exports to Afghanistan, Iraq (650 MW), Azerbaijan, Armenia, Pakistan and Turkey reached 878 megawatts and the total of imports from Armenia (237 MW) and Turkmenistan was recorded at 463 megawatts.[54] Jordan, India, Oman, Qatar, Russia, Syria, and the UAE are the new countries that have expressed interest in buying electricity from Iran.[54]
Waste to energy
Name | Location | Capacity (MW) | Type | Operational | Notes |
---|---|---|---|---|---|
Shiraz Biogas Power Plant | Fars Province | 1.1 | Biogas power station | 2009 | The plant uses organic waste as fuel for production of electricity from waste. |
Mashhad Biogas Power Plant | Razavi Khorasan Province | 0.6 | Biogas power station | 2010 | The plant uses organic waste as fuel for production of electricity from waste.[57][58][59][60] |
? | Tehran Province | 3.5 | Waste incineration | 2012 | The plant has the capacity to burn 300 tonnes of solid waste per day.[61] |
Sari Incineration Power Plant | Mazandaran Province | 4 | Waste incineration | 2012 | The plant is designed to incinerate over 450 tonnes of waste per day, producing 10 MW of electricity. It is used to develop information for 20 other such plants to be deployed in Iran's major cities.[62][63][64] |
Fossil
Name | Location | Capacity (MW) | Type | Operational | Notes |
---|---|---|---|---|---|
Rudeshur Power Plant | Markazi Province | 2000 | Natural gas power station | 2007 | This is the first private power plant in Iran, belonging to Arian Mah-Taab Gostar Co.[65] |
Kazerun Power Plant | Fars Province | 1373 | Natural gas power station | 1994 | CHP type thermal station incorporating Iran's first locally produced gas turbine, generator set and steam turbine[66][67] |
Sultanyeh Power Plant | Zanjan Province | 1000 | Natural gas power station | 2011 | CHP type thermal station[68][69] |
Urmia Power Plant | West Azarbaijan Province | 60 | Natural gas power station | 1982 | Natural gas thermal station situated inside the city of Urmia[70] |
Urmia Combined Power Plant | West Azarbaijan Province | 1500 | Natural gas power station | 2011 | CHP type thermal station[71][72] |
Khoy Combined Power Plant | West Azarbaijan Province | 453 | Natural gas power station | 1996 | CHP type thermal station[73] |
Iranshahr steam Power Plant | Sistan and Baluchestan Province | 256 | Natural gas power station | 1996 | Thermal power station running on natural gas as primary fuel and furnace oil as backup fuel[74][75] |
Chabahar Combined Power Plant | Sistan and Baluchestan Province | 478 | Natural gas power station | 2011 | Combined cycle plant running on natural gas as primary fuel and furnace oil as backup fuel; part of generation for export to Pakistan[76][77] |
Konarak NG Power Plant | Sistan and Baluchestan Province | 150 | Natural gas power station | 2009 | Thermal power station[78] |
Zahidan NG Power Plant | Sistan and Baluchestan Province | 230 | Natural gas power station | Gas turbine plant providing power for Zahidan[79] | |
Zahidan Diesel Power Plant | Sistan and Baluchestan Province | 24 | Diesel engine generator | 1976 | Electrical generation currently used only for peak power management[79] |
Zabul Diesel Power Plant | Sistan and Baluchestan Province | 29 | Diesel engine generator | Electrical generation currently used only for peak power management[79] | |
Khash Diesel Power Plant | Sistan and Baluchestan Province | 22 | Diesel engine generator | Electrical generation currently used only for peak power management[79] | |
Iranshahr Diesel Power Plant | Sistan and Baluchestan Province | 30 | Diesel engine generator | Electrical generation currently used only for peak power management[79] | |
Saravan Diesel Power Plant | Sistan and Baluchestan Province | 13 | Diesel engine generator | Electrical generation currently used only for peak power management[79] | |
Iranshahr combined Power Plant | Sistan and Baluchestan Province | 1000 | Natural gas power station | 2011 | Combined cycle plant running on natural gas as primary fuel and furnace oil as backup fuel[80] |
Shaheed Salimi Neka Combined Power Plant | Mazandaran Province | 2214 | Natural gas power station | 2006 | Combined cycle plant running on natural gas as primary fuel and furnace oil as backup fuel[81] |
Nishapur Combined Power Plant | Razavi Khorasan Province | 1042 | Natural gas power station | 1993 | Combined cycle plant running on natural gas as primary fuel and diesel as backup fuel[82] |
Fars Combined Power Plant | Fars Province | 1050 | Natural gas power station | 2008 | Combined cycle plant running on natural gas as primary fuel and furnace oil as backup fuel[83] |
Sarehpar Combined Power Plant | Gilan Province | 968 | Natural gas power station | 2010 | Combined cycle plant running on natural gas as primary fuel and furnace oil as backup fuel[84] |
Shaheed Kaveh Combined Power Plant | South Khorasan Province | 630 | Natural gas power station | 2008 | Combined cycle plant running on natural gas as primary fuel and diesel as backup fuel; being upgraded to 950 MW[85] |
Mahshahr NG Power Plant | Khuzestan Province | 968 | Natural gas power station | 2012 | Combined cycle plant under construction[86][87] |
Abadan NG Power Plant | Khuzestan Province | 493 | Natural gas power station | 2002 | Plant convertible to combined cycle[88] |
Aliabad Katool Combined Power Plant | Golestan Province | 1500 | Natural gas power station | 2011 | Combined cycle plant running on natural gas as primary fuel and diesel as backup fuel[89] |
Zavareh Combined Power Plant | Isfahan Province | 484 | Natural gas power station | 2011 | Combined cycle plant running on natural gas as primary fuel and diesel as backup fuel[90] |
Aryan Combined Power Plant | Zanjan Province | 1000 | Natural gas power station | 2013 | Combined cycle plant under construction[91] |
Zanjan 4 Combined Power Plant | Zanjan Province | 484 | Natural gas power station | 2012 | Combined cycle plant under construction[92][93] |
Zanjan 1 Combined Power Plant | Zanjan Province | 484 | Natural gas power station | Combined cycle plant under construction[94] | |
Khorramabad Combined Power Plant | Lorestan Province | 2000 | Natural gas power station | Combined cycle plant under construction[95] | |
Behistun Steam Power Plant | Kermanshah Province | 1280 | Natural gas power station | 2013 | Thermal power station[96][97] |
Zagrus NG Power Plant | Kermanshah Province | 648 | Natural gas power station | 2011 | Gas turbine plant constructed adjacent to Behistun Steam Power Plant; convertible to combined cycle with resultant increased output of 1000 MW[98][99] |
Islamabad Combined Power Plant | Kermanshah Province | 484 | Natural gas power station | 2012 | Combined cycle plant[100] |
Islamabad NG Power Plant | Kermanshah Province | 100 | Natural gas power station | 2011 | Gas turbine plant[100] |
Pasargadae Combined Power Plant | Hormozgān Province | 500 | Natural gas power station | 2011 | Combined cycle plant situated on Qeshm island is to be connected with submarine power cable to the national grid[101] |
Kahnooj Combined Power Plant | Kerman Province | 1000 | Natural gas power station | 2013 | Combined cycle plant under construction[102][103] |
Kerman Combined Power Plant | Kerman Province | 2000 | Natural gas power station | 2010 | Combined cycle plant[104] |
Noshahr NG Power Plant | Mazandaran Province | 50 | Natural gas power station | 2009 | Gas turbine plant[105] |
West Mazandaran Combined Power Plant | Mazandaran Province | 484 | Natural gas power station | Combined cycle plant under construction[106] | |
Amirabad Port NG Power Plant | Mazandaran Province | 75 | Natural gas power station | Gas turbine plant under construction[107] | |
Sarakhs Combined Power Plant | Razavi Khorasan Province | 1650 | Natural gas power station | 2012 | Combined cycle plant under construction; waste hot water from the plant is to be used for industrial greenhouse agriculture[108][109] |
Geothermal
Name | Location | Capacity | Type | Operational | Notes |
---|---|---|---|---|---|
Meshkinshahr Geothermal Power Plant | Ardabil Province | 250 MW | Geothermal power station | 2010 | It is Iran's first geothermal electricity generation station |
Hydroelectric
In service
Name | Location | Capacity (MW) | Type | Operational | Notes |
---|---|---|---|---|---|
Shahid Abbaspour Dam (Karun-1) | Khuzestan | 2,000 | Hydroelectric dam | 1976 | One of the four large hydroelectric dams on Karun River [110][111] |
Karkheh Dam | Khūzestān | 520 | Hydroelectric dam | 2001 | The dam was built by Islamic Revolutionary Guards Corps. |
Amir Kabir Dam | Karaj | 90 | Hydroelectric dam | 1961 | In addition to power, it provides water for the city of Tehran. |
Dez Dam | Khuzestan | 520 | Hydroelectric dam | 1963 | [110][112] |
Karun-3 Dam | Khuzestan | 2,280 | Hydroelectric dam | 2005 | [110][113] |
Karun-4 Dam | Chaharmahal and Bakhtiari | 1,020 | Hydroelectric dam | 2010 | [110] |
Masjed Soleyman Dam | Masjed-Soleyman | 2,000 | Hydroelectric dam | 2002 | [114] |
Lar Dam, Amol | Mazandaran Province | 30 | Hydroelectric dam | 1984 | |
Latyan Dam | Tehran Province | 45 | Hydroelectric dam | 1967 | |
Kouhrang Dam | Isfahan Province | 35.1 | Hydroelectric dam | 2002 | [110] |
Lavarak Dam | Tehran Province | 47 | Hydroelectric dam | 2009 | |
Shahid Rajaee Dam | Mazandaran Province | 13.5 | Hydroelectric dam | 2007 | [110] |
Shahid Talebi Dam | Fars Province | 2.3 | Hydroelectric dam | 1994 | In operation |
Yasuj Chain Dam | Kohgiluyeh and Boyer-Ahmad Province | 16.8 | Hydroelectric dam | 2005 | Being upgraded to 25 MW |
Shahid Azimi Dam | 1 | Hydroelectric dam | In operation | ||
Piran Dam | Kermanshah Province | 8.4 | Hydroelectric dam | 2011 | In operation |
Jiroft Dam | Kerman Province | 85 | Hydroelectric dam | 1993 | |
Seimareh Dam | Ilam Province & Lorestan Province | 480 | Hydroelectric dam | 2013 | In operation |
Manjil Dam | Gīlān Province | 87 | Hydroelectric dam | 1962 | |
Khoda Afrin Dam | East Azerbaijan | 102 | Hydroelectric dam | 2010 | On border with disputed territories |
Zayanderud Dam | Isfahan Province | 50 | Hydroelectric dam | 1970 | |
Rais Ali Dilavari Dam | Bushehr Province | 70 | Hydroelectric dam | 2008 | |
Mulla Sadra Dam | Fars Province | 100 | Hydroelectric dam | 2007 | |
Doroodzan Dam | Fars Province | 10 | Hydroelectric dam | 1973 | |
Marun Dam | Khuzestan | 151 | Hydroelectric dam | 1976 | |
Talaqan Dam | Qazvin Province | 18 | Hydroelectric dam | 2006 | |
Gavoshan Dam | Kurdistan Province | 11 | Hydroelectric dam | 2004 | |
Upper Gotvand Dam | Khuzestan Province | 1,000 | Hydroelectric dam | 2012, 2015 (?) | Phase 1 was operational in 2012. Phase 2 will add 1,000 MW.[115] |
Salman Farsi Dam | Fars Province | 13 | Hydroelectric dam | 2009 | |
Ardeh Dam | Gilan Province | 0.125 | Run-of-the-river | 1991 | The hydroelectric plant is not connected to the national grid. |
Darreh Takht Power Plant | Lorestan Province | 1.6 | Run-of-the-river | 1986, 2000 | Operational[116][117] |
Micro Power Plants | 227 | Run-of-the-river | 2004 | Operational; five power plants nationwide[118] | |
Proposed or under construction
Name | Location | Capacity | Type | Operational | Notes |
---|---|---|---|---|---|
Bakhtiari Dam | Lorestān Province | 1,500 | Hydroelectric dam | The dam is currently under construction. Upon completion it is going to become the world's tallest dam, with a height of 315 meters.[119] | |
Iran–Turkmenistan Friendship Dam | Border of Iran & Turkmenistan | 16 | Hydroelectric dam | The dam is operational since 2005. Installation of power units on the dam is being negotiated between the two countries.[120] | |
Sardasht Dam | West Azerbaijan | 120 | Hydroelectric dam | 2015? | Under construction |
Rudbar Lorestan Dam | Lorestan Province | 450 | Hydroelectric dam | 2015? | Under construction |
Khersan-3 Dam | Chaharmahal and Bakhtiari | 315 | Hydroelectric dam | 2015? | Under construction |
Joreh Dam | Khuzestan Province | 48 | Hydroelectric dam | 2011? | Under construction |
Sarrud Dam | 65 KW | Hydroelectric dam | Under construction | ||
Tarik Dam | Gilan Province | 2.8 | Hydroelectric dam | 2016 | Dam is operational since 1977, power station is being constructed |
Zayanderud Regulatory Dam | Isfahan Province | 8.5 | Hydroelectric dam | Under construction | |
Aras Watershed Dam | Meghri | 260 | Hydroelectric dam | 2017 | Under construction |
Zalaki Dam | 466 | Hydroelectric dam | Feasibility study | ||
Liro Dam | 324 | Hydroelectric dam | Feasibility study | ||
Sezar 4-1 Dam | 265 | Hydroelectric dam | Feasibility study | ||
Dez 3-1 Dam | 930 | Hydroelectric dam | Feasibility study | ||
Hajghalandar Dam | 80 | Hydroelectric dam | Feasibility study | ||
Chambastan Dam | 135 | Hydroelectric dam | Feasibility study | ||
Namarestagh Dam | 33.5 | Hydroelectric dam | Feasibility study | ||
Sardabrud Dam | 20 | Run-of-the-river | Feasibility studies completed in 2009 | ||
Gulestan Dam | 5.6 | Run-of-the-river | Feasibility studies completed in 2009 | ||
Pir Taghi Dam | 240 | Hydroelectric dam | Feasibility study | ||
Namhil Dam | 496 | Hydroelectric dam | Feasibility studies completed | ||
Pavehrud Dam | 250 | Hydroelectric dam | Feasibility studies completed | ||
Kalat Dam | 292 | Hydroelectric dam | Feasibility study | ||
Khersan-2 Dam | 580 | Hydroelectric dam | Feasibility study | ||
Khersan-1 Dam | 2,638 | Hydroelectric dam | Feasibility study | ||
Bazaft Dam | 240 | Hydroelectric dam | Feasibility study | ||
Karun-3 Axis-3 Dam | 1,458 | Hydroelectric dam | Feasibility study | ||
Karun-5 Dam | 560 | Hydroelectric dam | Feasibility study | ||
Karun-2 Axis-8 Dam | 1,000 | Hydroelectric dam | Feasibility study | ||
Garsha Godar Pir Dam | 200 | Hydroelectric dam | Feasibility study | ||
Karun Buran Dam | 284 | Hydroelectric dam | Feasibility study | ||
Tang Mashure Dam | 167 | Hydroelectric dam | Feasibility study | ||
Sazbon Dam | 375 | Hydroelectric dam | Feasibility study | ||
Karkheh-2 Dam | 118 | Hydroelectric dam | Feasibility study | ||
Sazbon Jadid Axis-2 Dam | 300 | Hydroelectric dam | Feasibility studies completed | ||
Dez Regulator Dam | Khuzestan Province | 28 | Hydroelectric dam | Feasibility study | |
Daryan Dam | Kermanshah Province | 210 | Hydroelectric dam | 2017 | Under construction[100][121] |
Pumped storage hydroelectric
Name | Location | Capacity | Type | Operational | Notes |
---|---|---|---|---|---|
Siah Bishe Pumped Storage Power Plant | Mazandaran Province | Output: 1,040 MW; input: 940 MW | Pumped-storage hydroelectricity | 2013-2015[122] | Operational; Iran's first pumped-storage hydroelectric station |
Ilam Pump Storage Dam | Ilam Province | Output: 1,000 MW | Pumped-storage hydroelectricity | Feasibility study | |
Azad Dam | Kurdistan Province | 10 MW; regeneration: 500 MW | Hydroelectric dam / pumped-storage hydroelectricity | 2013 | Operational |
Nuclear
In service
Name | Location | Capacity (MW) | Type | Operational | Notes and references |
---|---|---|---|---|---|
Bushehr Nuclear Power Plant | Bushehr | 915 | VVER | 2010-07-01 | Originally Bushehr Nuclear Power Plant was planned to have four PWRs, each with an electricity generating capacity of 915 MW. Bushehr-1 reactor achieved commercial operation in September 2013.[123] |
Under construction
Name | Location | Capacity (MW) | Type | Operational | Notes |
---|---|---|---|---|---|
IR-40 | Arak | 40 | Heavy water reactor | 2011 | This is a thermal reactor designed to produce power and isotopes. It is Iran's first indigenously built nuclear reactor. |
Darkhovin Nuclear Power Plant | Darkhovin | 360 | Heavy water reactor | 2016 | Construction of Darkhovin Nuclear Power Plant began in 2008. It is to be built based on indigenous technologies developed for IR-40, and is scheduled to come online in 2016. |
Solar
In service
With about 300 clear sunny days a year and an average of 2,200 kilowatt-hour solar radiation per square meter, Iran has a great potential to tap solar energy.[124]
Name | Location | Capacity | Type | Operational | Notes |
---|---|---|---|---|---|
Yazd solar thermal power plant | Yazd | 467 MW | Integrated solar combined cycle | 2009 | Yazd solar thermal power plant is the world's first integrated solar combined cycle power station using natural gas and solar energy. It is the largest solar power plant in the Middle East and the eighth largest in the world.[124] |
Shiraz solar power plant | Shiraz | 250 KW | Concentrating solar power | 2009 | Shiraz solar power plant is Iran's first solar power station. It is currently being upgraded to 500 kW·h. |
Mashhad Solar Power Plant | Mashhad | 432 KW | 2011 | 36°16′17″N 59°39′03″E / 36.2713°N 59.6508°E | |
Malard 365 KW Solar Power Plant | Malard | 365 KW | PV solar power plant | 2014 | Malard Solar Power Plant is the largest grid-tide solar power plant in Iran by the Atrin Parsian Solar and Biomass Co. |
Under construction
Name | Location | Capacity (MW) | Type | Operational | Notes |
---|---|---|---|---|---|
Qazvin PV Solar Power Plant | Qazvin, Iran | 1000 | Photovoltaic power station | 2025-2026 | It will be an array of 100 PV solar power stations, each with a nominal capacity of 100MW.[125] |
Wind
Name | Location | Capacity | Type | Operational | Notes |
---|---|---|---|---|---|
Binalood wind farm | Razavi Khorasan Province | 28.2 MW | Onshore wind farm | 2008 | The wind farm uses 43 units of 660 kW·h. It is currently being upgraded to 93 turbine units with a total capacity of 61.2 MWh. |
Manjil and Rudbar Wind Farm | Gilan Province | 100.8 MW | Onshore wind farm | 1994 | The wind farm uses 171 units of 300-660 kW·h turbines. It was the first wind farm in Iran. |
Kahak wind farm(MAPNA Renewable Generation Company) | Qazvin Province | 100 MW | Onshore wind farm | 2014 | The wind farm uses 10 units of 2500 kW. It is currently being developed to 40 turbine units with a total capacity of 100 MW. |
Others
Name | Location | Capacity | Type | Operational | Notes |
---|---|---|---|---|---|
Qazvin hydrogen power plant | Qazvin Province | 200 KW | Photoelectrochemical cell / fuel cell | 2009 | The plant is based on the idea of hydrogen economy, using photoelectrochemical cells to produce hydrogen for electricity generation in fuel cells. |
Shahid Esmaili power plant | Tehran Province | 7 MW | Combined heat & power (CHP) system[61] | N/A | CHP is a system that involves the recovery of waste heat from power generation to form useful energy for other purposes such as heating. The system increases the efficiency of the power plant to more than 1.5 times that of traditional power plants. |
Decentralized power generation
In addition to the above power plants, there was 1800 MW cumulative installed capacity in 2011, which belonged to small scale decentralized power plants, some of which were not connected to the national grid, and many being privately built and run. This capacity is planned for increase to more than 10,000 MW with emphasis on renewable energy and trigeneration. Similarly there was 418 MW of capacity belonging to diesel generator based plants supplying hard to reach areas.[126][127][128][129][130]
See also
References
- 1 2 "No Operation". Presstv.com. Retrieved 2012-02-07.
- 1 2 Iran-Daily:Hydroelectric Power Generation Will Increase Archived October 12, 2008, at the Wayback Machine.
- 1 2 http://www.nitc.co.ir/iran-daily/1387/3267/html/economy.htm
- 1 2 3 4 "Press TV". Press TV. 2012-01-17. Retrieved 2012-02-07.
- ↑ http://ayaronline.ir/1392/06/33438.html
- ↑ "Encyclopædia Iranica | Articles". Iranica.com. Retrieved 2012-02-07.
- ↑ "Iran Electric Power Industry in brief". .tavanir.org.ir. 2000-05-08. Retrieved 2012-02-07.
- ↑ "حجم تاسيسات برق دو برابر ميشود - Tabnak.IR | تابناك". Tabnak.IR. Retrieved 2012-02-07.
- ↑ "The Minister of energy of I.R.Iran: 5000 MW electric power generation capacity will be added to the total installed electric power capacity of the country annually - سايت خبري شرکت توانير". News.tavanir.org.ir. Retrieved 2012-02-07.
- ↑ Frosty Wooldridge. "Baseball: Boston 's Atchison Opzionato Per Tripla-A Pawtucket". OfficialWire. Retrieved 2012-02-07.
- ↑ http://fararu.com/fa/news/156689/%D8%B1%DA%A9%D9%88%D8%B1%D8%AF-%D9%85%D8%B5%D8%B1%D9%81-%D8%A8%D8%B1%D9%82-%D8%A7%DB%8C%D8%B1%D8%A7%D9%86-%D8%B4%DA%A9%D8%B3%D8%AA%D9%87-%D8%B4%D8%AF
- 1 2 "$1bn investment in Iran's power plants". PressTV. 2010-08-24. Retrieved 2012-02-07.
- ↑ "Iran Top Producer of Hydroelectric Power Plants". Zawya. Retrieved 2012-02-07.
- ↑ http://en.mehrnews.com/detail/News/102219
- ↑ "No Operation". Presstv.com. Retrieved 2012-02-07.
- 1 2 http://en.tpo.ir/UserFiles/File/Annual1386.pdf
- ↑ "Nation's epileptic power situation… lessons from Iran". Businessdayonline.com. 2011-06-23. Retrieved 2012-02-07.
- 1 2 3 4 . "Blackouts Threaten Iran". Payvand.com. Retrieved 2012-02-07.
- ↑ "PressTV - Iran exports 5.5 bn kWh of electricity". Presstv.ir. 2010-09-06. Retrieved 2012-02-07.
- ↑ "Iran's power grid joined to 7 states". Previous.presstv.ir. 2010-09-05. Retrieved 2012-02-07.
- ↑ "No. 4142 | Domestic Economy | Page 4". Irandaily. Retrieved 2012-02-07.
- ↑ https://web.archive.org/web/20090521090141/http://www.iran-daily.com/1388/3402/html/economy.htm. Archived from the original on May 21, 2009. Retrieved May 24, 2009. Missing or empty
|title=
(help) - ↑ "No Operation". Presstv.com. Retrieved 2012-02-07.
- ↑ http://www.presstv.com/detail/238589.html
- ↑ Archived September 18, 2009, at the Wayback Machine.
- ↑ http://presstv.com/detail/235371.html
- ↑ "No Operation". Presstv.com. Retrieved 2012-02-07.
- ↑ "Iran plans 1,000MW gas power plant". PressTV. 2010-10-27. Retrieved 2012-02-07.
- ↑ "No. 3914 | Domestic Economy | Page 4". Irandaily. 2010-03-21. Retrieved 2012-02-07.
- ↑ http://www.presstv.com/detail/238589.html
- ↑ "Iran Press: Official Provides Details on 'Native' Iranian Nuclear Plant - Science News". redOrbit. 2006-01-10. Retrieved 2012-02-07.
- ↑ "WPONAC: Iran Nuclear Milestones". Iranwatch.org. Retrieved 2012-02-07.
- ↑ "Ahwazstudies.org". Ahwazstudies.org. 2010-11-06. Retrieved 2012-02-07.
- ↑ "Iran emerging as major energy exporter". Payvand.com. Retrieved 2012-02-07.
- ↑ "Iran MAPNA among major turbine makers". PressTV. 2011-10-12. Retrieved 2012-02-07.
- ↑
- ↑ http://www.turquoisepartners.com/iraninvestment/IIM-Jun10.pdf
- ↑ "Renewable Energy Armenia - Wind Power Potential". Renewableenergyarmenia.am. Retrieved 2012-02-07.
- ↑ "Projects - Iran-Armenia Wind Farm". Ebrdrenewables.com. Retrieved 2012-02-07.
- ↑ http://www.payvand.com/news/12/apr/1248.html
- ↑ http://www.live-pr.com/en/russia-and-iran-have-signed-an-r1050550796.htm
- ↑ https://web.archive.org/web/20080920032121/http://www.iran-daily.com/1385/2771/html/economy.htm. Archived from the original on September 20, 2008. Retrieved January 12, 2012. Missing or empty
|title=
(help) - ↑ Iran Daily - Domestic Economy - 01/28/07 Archived February 17, 2007, at the Wayback Machine.
- ↑ https://web.archive.org/web/20090129231528/http://www.iran-daily.com/1387/3294/html/economy.htm. Archived from the original on January 29, 2009. Retrieved December 14, 2008. Missing or empty
|title=
(help) - ↑ https://web.archive.org/web/20081211144016/http://www.iran-daily.com/1387/3292/html/economy.htm. Archived from the original on December 11, 2008. Retrieved December 11, 2008. Missing or empty
|title=
(help) - ↑ https://web.archive.org/web/20090417032650/http://www.iran-daily.com/1388/3372/html/economy.htm. Archived from the original on April 17, 2009. Retrieved April 13, 2009. Missing or empty
|title=
(help) - ↑ "Iran to privatize 20 power plants". Payvand.com. 2010-03-20. Retrieved 2012-02-07.
- ↑ "No. 3731 | Domestic Economy | Page 4". Irandaily. Retrieved 2012-02-07.
- ↑ "No. 4075 | Domestic Economy | Page 4". Irandaily. Retrieved 2012-02-07.
- ↑ http://www.tehrantimes.com/economy-and-business/99779-government-to-privatize-18-iranian-power-plants
- ↑ "Iran to open energy bourse by March 2012". Tehran Times. Retrieved 2012-02-07.
- ↑ http://www.turquoisepartners.com/iraninvestment/IIM-Feb11.pdf
- ↑ Turquoise Partners: Iran Investment Monthly (March 2011) Retrieved April 30, 2011.
- 1 2 3 "No. 3866 | Domestic Economy | Page 4". Irandaily. Retrieved 2012-02-07.
- ↑ http://financialtribunedaily.com/articles/2014/09/06/energy/46/no-subsidized-gas-power-plants
- ↑ "Iran's Electricity Industry Exports to Hit $4 bln". Payvand.com. Retrieved 2012-02-07.
- ↑ "فرهیختگان - توليد برق از زباله در مشهد و شيراز". Farheekhtegan.ir. 2010-11-03. Retrieved 2012-02-07.
- ↑ http://sabainfo.ir/newsdetail-39560-fa.html
- ↑ ۱۶ مهر ۱۳۸۸ (1999-02-22). "نیروگاه تولید برق با سوخت بیوگاز در مشهد 600 مشترک دارد | موتور برق گازسوز، ژنراتور برق گازسوز، موتور پمپ، موتور چند منظوره گرین پاور". Greenpower.ir. Retrieved 2012-02-07.
- ↑ "شهرسازی - راه اندازي نخستين نيروگاه بيوگاز خاورميانه". Nayyer.ir. Retrieved 2012-02-07.
- 1 2 http://www.turquoisepartners.com/iraninvestment/IIM-Mar11.pdf
- ↑ "عملیات اجرایی احداث نیروگاه زباله سوز در ساری آغاز شد". Zayeat.com. Retrieved 2012-02-07.
- ↑ "عمليات ساخت نخسين نيروگاه زباله سوز كشور در نوشهر آغاز شد". Irna.ir. Retrieved 2012-02-07.
- ↑ "اخبارتنکابن،رامسر،عباس آباد،گیلان،مازندران :: نيروگاه زبالهسوز در تنکابن احداث می شود". Daryadim.com. Retrieved 2012-02-07.
- ↑ Arian Mah-Taab Gostar Co.
- ↑ Kazeroon Powerplant. "درباره ما | نیروگاه سیکل ترکیبی کازرون". Kzccpp.ir. Retrieved 2012-02-07.
- ↑ http://www.sfpgmc.co.ir/kazeroon%20power%20plant.aspx
- ↑ "شرکت مدیریت تولید برق زنجان | نيروگاه 1000 مگاواتي زنجان - سلطانيه". Zpgmc.ir. Retrieved 2012-02-07.
- ↑ "خبر مورد نظر یافت نشد.". Eqeep.ir. Retrieved 2012-02-07.
- ↑ "تø§Ø±Ûœø®Ú†Ù‡". Azarw-ppt.ir. Retrieved 2012-02-07.
- ↑ "تاریخچه". Azarw-ppt.ir. Retrieved 2012-02-07.
- ↑ "تصاویر - نيروگاه گازي اروميه". Parskayhan.org. Retrieved 2012-02-07.
- ↑ "تø§Ø±Ûœø®Ú†Ù‡". Azarw-ppt.ir. Retrieved 2012-02-07.
- ↑ http://news.tavanir.org.ir/news/news_detail.php?id=208
- ↑ "خلاصه سوابق پروژه". sbpm.ir. Retrieved 2012-02-07.
- ↑ "بهره برداری رسمی از بخش گاز نیروگاه سیکل ترکیبی چابهار". Irannews24.ir. Retrieved 2012-02-07.
- ↑ "پایگاه اطلاع رسانی دولت - مرحله نخست نیروگاه سیکل ترکیبی چابهار با حضور رئیس جمهور افتتاح شد". Dolat.ir. Retrieved 2012-02-07.
- ↑ "کنارک". Sb-ostan.ir. Retrieved 2012-02-07.
- 1 2 3 4 5 6 http://www.sbrec.co.ir/persian/amar/amar_dispaching/goz_pik_bar_89.pps
- ↑ http://www.iran-newspaper.com/1387/870807/pdf/sistan/i2.pdf
- ↑ "شرکت مديريت توليد برق نکا". Npgm.co.ir. Retrieved 2012-02-07.
- ↑ "افزايش توليد انرژي الكتريكي و راندمان نيروگاه سيكل تركيبي نيشابور - سايت خبري شرکت توانير". News.tavanir.org.ir. 2010-08-08. Retrieved 2012-02-07.
- ↑ SabaInfo. "نیروگاه سیکل ترکیبی فارس در کشور، مقام سوم را کسب نمود". Sabainfo.ir. Retrieved 2012-02-07.
- ↑ SabaInfo. "بازدید استادار گیلان از نیروگاه سیکل ترکیبی پره سر شهرستان رضوانشهر". Sabainfo.ir. Retrieved 2012-02-07.
- ↑ http://www.qaenpowerplant.ir/static-5.html
- ↑ "شرکت توسعه انرژی متین". Matinco.net. Retrieved 2012-02-07.
- ↑ SabaInfo. "احداث نیروگاه سیکل ترکیبی 1000 مگاواتی در ماهشهر". Sabainfo.ir. Retrieved 2012-02-07.
- ↑ "با حضور رئيس جمهوري :نيروگاه گازي آبادان امروز افتتاح ميشود - سايت خبري شرکت توانير". News.tavanir.org.ir. 2010-08-08. Retrieved 2012-02-07.
- ↑ "نیروگاه گازی علی آباد کتول افتتاح شد". Hamshahrionline.ir. 2011-11-21. Retrieved 2012-02-07.
- ↑ http://www.eceharandiau.com/?p=385
- ↑ "شرکت مدیریت تولید برق زنجان | نيروگاه 1000 مگاواتي سيكل تركيبي زنجان - آريان". Zpgmc.ir. Retrieved 2012-02-07.
- ↑ SabaInfo. "موافقت 200 میلیون یورو تسهیلات ارزی برای احداث نیروگاه سیکل ترکیبی زنجان 4". Sabainfo.ir. Retrieved 2012-02-07.
- ↑ "شرکت مدیریت تولید برق زنجان | نيروگاه 484 مگاواتي زنجان". Zpgmc.ir. Retrieved 2012-02-07.
- ↑ "شرکت مدیریت تولید برق زنجان | نيروگاه 484 مگاواتي زنجان". Zpgmc.ir. Retrieved 2012-02-07.
- ↑ SabaInfo. "احداث نیروگاه سیکل ترکیبی 2000 مگا واتی خرم آباد و کارخانه سیمان". Sabainfo.ir. Retrieved 2012-02-07.
- ↑ "تا 3 سال آینده ظرفیت تولید برق در استان کرمانشاه به 2500 مگاوات می رسد 500 مگاوات برق به عراق صادر می کنیم". Kermanshah.isna.ir. Retrieved 2012-02-07.
- ↑ چهارشنبه ۱۹ بهمنمصادف با 08 Feb 2012ساعت ۰۲:۰۸ به وقت تهران. "نیروگاه بیستون کرمانشاه بزرگترین نیروگاه تولید برق کشور خواهد شد - ایرنا | خبر فارسی". Khabarfarsi.com. Retrieved 2012-02-07.
- ↑ "اولين بازديد 2000 ساعته واحد اول گازی نيروگاه زاگرس انجام گرفت". bisotounps.ir. Retrieved 2012-02-07.
- ↑ "مدیرعامل نیروگاه بیستون گفت: تابستان امسال هیچگونه محدودیت تولید برق نداریم". bisotounps.ir. Retrieved 2012-02-07.
- 1 2 3 "کرمانشاه در آینده نه چندان دور به یکی از قطب های تولید برق کشور تبدیل می شود". Kermanshah.isna.ir. Retrieved 2012-02-07.
- ↑ SabaInfo. "بهره برداری از فاز 1 نیروگاه 500 مگاواتی قشم". Sabainfo.ir. Retrieved 2012-02-07.
- ↑ "خبر - با تشريح آخرين برنامهها از سوي مديران گروه مطرح شد تبديل گروه بهمن به هلدينگ چند رشتهاي". Donya-e-eqtesad.com. Retrieved 2012-02-07.
- ↑ SabaInfo. "کهنوج". Sabainfo.ir. Retrieved 2012-02-07.
- ↑ "افتتاح بزرگترین پروژه سیکل ترکیبی کشور در کرمان". Kerman.irib.ir. Retrieved 2012-02-07.
- ↑ SabaInfo. "نیروگاه 50 مگاواتی گازی غرب مازندران احداث شد". Sabainfo.ir. Retrieved 2012-02-07.
- ↑ "ettelaat newspaper". Ettelaat.com. Retrieved 2012-02-07.
- ↑ http://www.ghatreh.com/news/6395361.html
- ↑ "شروع عملیات اجرایی ساخت یك نیروگاه در سرخس". Aftabir.com. 2007-10-24. Retrieved 2012-02-07.
- ↑ "طرحهای گلخانه های صنعتی در سرخس اجرا می شود". Ashianehsabz.com. Retrieved 2012-02-07.
- 1 2 3 4 5 6 "Hydroelectric Power Plants in Iran". Gallery. Power Plants Around The World. 30 October 2012. Retrieved 2 March 2014.
- ↑ "Shahid Abbaspour (Karun-1) Hydroelectric Power Plant". Global Energy Observatory. Retrieved 2 March 2014.
- ↑ "Dez Dam Hydroelectric Power Plant". Global Energy Observatory. Retrieved 2 March 2014.
- ↑ "Karun 3 Hydroelectric Power Plant". Global Energy Observatory. Retrieved 2 March 2014.
- ↑ "Masjed-e-Soleiman Hydroelectric Power Plant". Global Energy Observatory. Retrieved 2 March 2014.
- ↑ "درآمد یک میلیارد تومانی حاصل از تولید برق نیروگاه گتوند در روز". Irannews24.ir. Retrieved 2012-02-07.
- ↑ "Darre Takht 1 Power Plant". Iran Water and Power Resources Development Co. Retrieved 6 June 2013.
- ↑ "Darre Takht 2 Power Plant". Iran Water and Power Resources Development Co. Retrieved 6 June 2013.
- ↑ "Micro Power Plant". Iran Water and Power Resources Development Co. Retrieved 6 June 2013.
- ↑ "Iran, China to build world tallest dam". PressTV. 2011-03-14. Retrieved 2012-02-07.
- ↑ "Iran, Turkmenistan review water, power ties". tehran times. Retrieved 2012-02-07.
- ↑ "Ettelaat International". Ettelaat.com. Retrieved 2012-02-07.
- ↑ http://en.iwpco.ir/Lists/News/DispForm.aspx?ID=177&Source=http%3A%2F%2Fen.iwpco.ir%2Fdefault.aspx
- ↑ "BUSHEHR-1". Power Reactor Information System. International Atomic Energy Agency. Retrieved 2 March 2014.
- 1 2 "Solar Power Plants To Replace Fossil Fuel". Zawya. 2010-12-20. Retrieved 2012-02-07.
- ↑ http://en.mehrnews.com/news/116069/Qazvin-Italian-investors-sign-solar-plant-deal
- ↑ "قم ظرفيت 3200 مگاوات نيروگاه توليد پراكنده برق را دارد". Irna.ir. Retrieved 2012-02-07.
- ↑ "Iran, world, political, sport, economic news and headlines". MehrNews.com. Retrieved 2012-02-07.
- ↑ http://www2.tavanir.org.ir/info/stat86/sanatfhtml/p2.htm
- ↑ "ساخت نیروگاه های انرژی تجدید پذیر در کشور". Shams-solar.com. Retrieved 2012-02-07.
- ↑ "روستاهاي کردستان با نيروگاه خورشيدي برقدار ميشوند". Jamejamonline.ir. Retrieved 2012-02-07.
External links
- Iran Water & Power Development Company
- List of dams in Iran
- Tavanir - Iran's Electric Power Generation Organization
- Energy Exchange of Iran
- Specialized reports
- Iran Power Market Outlook to 2030, 55-page report, 2012
- Iran power, 57-page report, 2010
- Thermal Power Market Outlook in Iran to 2020, 78-page report, 2010