Bukit Batok MRT Station
NS2 Bukit Batok 武吉巴督 புக்கிட் பாத்தோக் Bukit Batok | |||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|
Rapid transit | |||||||||||
Platform level of the Bukit Batok MRT station in 2003, before Platform Screen Doors installed. | |||||||||||
Location |
10 Bukit Batok Central Singapore 659958 | ||||||||||
Coordinates | 1°20′57″N 103°44′59″E / 1.349073°N 103.749664°E | ||||||||||
Operated by | SMRT Trains (SMRT Corporation) | ||||||||||
Line(s) | |||||||||||
Platforms | Island | ||||||||||
Tracks | 2 | ||||||||||
Connections | Bus, Taxi | ||||||||||
Construction | |||||||||||
Structure type | Elevated | ||||||||||
Platform levels | 2 | ||||||||||
Disabled access | Yes | ||||||||||
Other information | |||||||||||
Station code | NS2 | ||||||||||
History | |||||||||||
Opened | 10 March 1990 | ||||||||||
Previous names | Bukit Batok South | ||||||||||
Services | |||||||||||
| |||||||||||
Location | |||||||||||
|
Bukit Batok MRT Station (NS2) is an above-ground Mass Rapid Transit station on the North South Line in Bukit Batok, Singapore, and for six years part of the Branch Line until the opening of the North South Line Woodlands Extension.
History
The station was opened on 10 March 1990 as part of the Branch MRT Line, and was given the station number B1. When the Woodlands Extension opened in 1996, the station number was changed to N23, and continued to use it until it adopted its current station number NS2 in 2001.
Installation of half-height screen doors at the station started on 29 June 2010 and operations commenced on 31 August 2010 with Lakeside.
High volume, low speed (HVLS) fans
The last North South Line station installed with Rite Hite Revolution High Volume, Low Speed (HVLS) fans. With the beginning of operations on 30 November 2012 with Lakeside MRT, this marked the completion of all HVLS fans installation along the North South Line.
Station layout
L2 | Platform A | North South Line towards NS1 EW24 Jurong East (→) |
Island platform, doors will open on the right | ||
Platform B | North South Line towards NS28 Marina South Pier via NS3 Bukit Gombak (←) | |
L1 | NSL Concourse | Faregates, Ticketing Machines, Station Control, Shops, Bukit Batok Xchange, West Mall |
Street Level | Bukit Batok Bus Interchange |
Transport connections
Rail
Destination | First Train | Last Train | ||||
---|---|---|---|---|---|---|
Mon – Sat | Sunday & Public Holiday | Daily | ||||
North South Line | ||||||
to NS1 Jurong East | 5.45am | 6.08am | 12.55am | |||
to NS28 Marina South Pier | 5.19am | 5.38am | 10.50pm | |||
to NS27 Marina Bay | - | - | 10.56pm | |||
to NS19 Toa Payoh | – | – | 11.31pm | |||
to NS16 Ang Mo Kio | – | – | 12.20am | |||
to NS10 Admiralty | – | – | 11.23pm |
Exits
- A: Bukit Batok Central, Bukit Batok Bus Interchange, Club CSC @ Bukit Batok, Bukit Batok Polyclinic
- B: Bukit Batok Central
- C: West Mall
- D: Bukit Batok Central
Gallery
- Entrance to Bukit Batok MRT Station
- Top View of Bukit Batok and a train heading towards Bukit Batok MRT.