Bukit Batok MRT Station

 NS2 
Bukit Batok
武吉巴督
புக்கிட் பாத்தோக்
Bukit Batok
Rapid transit

Platform level of the Bukit Batok MRT station in 2003, before Platform Screen Doors installed.
Location 10 Bukit Batok Central
Singapore 659958
Coordinates 1°20′57″N 103°44′59″E / 1.349073°N 103.749664°E / 1.349073; 103.749664
Operated by SMRT Trains (SMRT Corporation)
Line(s)
Platforms Island
Tracks 2
Connections Bus, Taxi
Construction
Structure type Elevated
Platform levels 2
Disabled access Yes
Other information
Station code  NS2 
History
Opened 10 March 1990
Previous names Bukit Batok South
Services
Preceding station   Mass Rapid Transit   Following station
Terminus
North South Line
Location

Bukit Batok MRT Station (NS2) is an above-ground Mass Rapid Transit station on the North South Line in Bukit Batok, Singapore, and for six years part of the Branch Line until the opening of the North South Line Woodlands Extension.

History

The station was opened on 10 March 1990 as part of the Branch MRT Line, and was given the station number B1. When the Woodlands Extension opened in 1996, the station number was changed to N23, and continued to use it until it adopted its current station number NS2 in 2001.

Installation of half-height screen doors at the station started on 29 June 2010 and operations commenced on 31 August 2010 with Lakeside.

High volume, low speed (HVLS) fans

The last North South Line station installed with Rite Hite Revolution High Volume, Low Speed (HVLS) fans. With the beginning of operations on 30 November 2012 with Lakeside MRT, this marked the completion of all HVLS fans installation along the North South Line.

Station layout

L2 Platform A North South Line towards  NS1  EW24  Jurong East (→)
Island platform, doors will open on the right
Platform B North South Line towards  NS28  Marina South Pier via  NS3  Bukit Gombak (←)
L1 NSL Concourse Faregates, Ticketing Machines, Station Control, Shops, Bukit Batok Xchange, West Mall
Street Level Bukit Batok Bus Interchange

Transport connections

Rail

Destination First Train Last Train
Mon – Sat Sunday &
Public Holiday
Daily
North South Line
to NS1 Jurong East 5.45am 6.08am 12.55am
to NS28 Marina South Pier 5.19am 5.38am 10.50pm
to NS27 Marina Bay - - 10.56pm
to NS19 Toa Payoh 11.31pm
to NS16 Ang Mo Kio 12.20am
to NS10 Admiralty 11.23pm

Exits

References

    This article is issued from Wikipedia - version of the 9/18/2016. The text is available under the Creative Commons Attribution/Share Alike but additional terms may apply for the media files.