Tuas West Road MRT Station
EW32 Tuas West Road 大士西路 துவாஸ் மேற்கு சாலை Tuas West Road | |||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|
Rapid transit | |||||||||||
Tuas West Road MRT Station nearing completion | |||||||||||
Location |
131 Pioneer Road Singapore 639609 | ||||||||||
Coordinates | 1°20′19.68″N 103°38′48.12″E / 1.3388000°N 103.6467000°E | ||||||||||
Operated by | SMRT Trains (SMRT Corporation) | ||||||||||
Line(s) | |||||||||||
Platforms | Island | ||||||||||
Tracks | 2 | ||||||||||
Construction | |||||||||||
Structure type | Elevated | ||||||||||
Platform levels | 3 | ||||||||||
Disabled access | Yes | ||||||||||
Other information | |||||||||||
Station code | EW32 | ||||||||||
History | |||||||||||
Opening | Q2 2017[1] | ||||||||||
Previous names | Tuas West | ||||||||||
Services | |||||||||||
| |||||||||||
Location | |||||||||||
|
Tuas West Road MRT Station (EW32) is a future elevated Mass Rapid Transit station on the East West Line, part of the Tuas West Extension (TWE) in Tuas, Singapore. This station is to provide rail connection to the western part of Tuas and Tuas South from the rest of the island. It will also be connected to the future residences at Tuas West Road.
History
It was first announced on 11 January 2011 by Transport Minister Mr Raymond Lim in a speech while visiting Bedok when new platform screen doors opened there. It was expected to be completed by 2016 and would benefit an estimated 100,000 commuters daily.
It was later announced on 26 October 2016, that the station will be opened in the second quarter of 2017 instead of 2016, so that the station can take advantage of the new signalling system, which was being implemented in all of the NSEWL stations.
Station layout
L3 | Platform A | East West Line (future service) towards EW1 Pasir Ris via EW31 Tuas Crescent (→) |
Platform B | East West Line (future service) towards EW33 Tuas Link (←) | |
L2 | Concourse | Faregates, Ticketing Machines, Station Control |
L1 | Street Level | Exit/Entrance |
Transport connections
Destination | First Train | Last Train | ||||
---|---|---|---|---|---|---|
Mon – Sat | Sunday & Public Holiday | Daily | ||||
East West Line | ||||||
to EW1 Pasir Ris | – | – | – | |||
to EW33 Tuas Link | – | – | – |
References
- ↑ "The Rail Report: New Signalling System, Rail Line And Extension And Trains Next Year | Press Room | Land Transport Authority". Lta.gov.sg. Retrieved 2016-10-26.
Coordinates: 1°20′20″N 103°38′48″E / 1.3388°N 103.6467°E