Tai Seng MRT Station

 CC11 
Tai Seng
大成
தை செங்
Tai Seng
Rapid transit

Platform level of Tai Seng MRT station.
Location 33 Upper Paya Lebar Road
Singapore 534803
Coordinates 1°20′09″N 103°53′17″E / 1.335833°N 103.887942°E / 1.335833; 103.887942
Operated by SMRT Trains (SMRT Corporation)
Line(s)
Platforms Island
Tracks 2
Connections Bus, Taxi
Construction
Structure type Underground
Platform levels 2
Disabled access Yes
Other information
Station code  CC11 
History
Opened 17 April 2010
Electrified Yes
Previous names Upper Paya Lebar
Services
Preceding station   Mass Rapid Transit   Following station
towards Dhoby Ghaut
Circle Line
towards HarbourFront
Location

Tai Seng MRT Station (CC11) is an underground Mass Rapid Transit station on the Circle Line at the boundary of Geylang, Hougang and Toa Payoh planning areas, Singapore.

The station is located under the junction of Upper Paya Lebar Road and Tai Seng Link. It was built as part of Stage 2 of the Circle Line.

History

The station was opened on 17 April 2010 along with the rest of Stage 1 & 2 of the Circle Line.

Station layout

L1 Street Level Upper Paya Lebar Road
B1 Concourse Faregates, Ticketing Machines, Station Control, Transitlink Counter
B2 Platform A Circle Line towards  CC29  NE1  HarbourFront via  CC12  Bartley (→)

track to Kim Chuan Depot

Island platform, doors will open on the right
Platform B Circle Line towards  CC1  NS24  NE6  Dhoby Ghaut via  CC10  DT26  MacPherson (←)

Exits

Transport connections

Rail

Destination First Train Last Train
Mon – Sat Sunday &
Public Holiday
Daily
Circle Line
to CC1 Dhoby Ghaut 5.35am 6.02am 11.44pm
to CC29 HarbourFront 5.44am 6.11am 11.08pm
to CC26 Pasir Panjang 11.38pm
to CC23 one-north 11.54pm
to CC17 Caldecott 12.22am
to CC7 Mountbatten 12.21am

References

    This article is issued from Wikipedia - version of the 10/30/2016. The text is available under the Creative Commons Attribution/Share Alike but additional terms may apply for the media files.