Tuas Crescent MRT Station
EW31 Tuas Crescent 大士弯 துவாஸ் செம்பிறை Tuas Crescent | |||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|
Rapid transit | |||||||||||
Tuas Crescent MRT Station nearing completion. | |||||||||||
Location |
90 Pioneer Road Singapore 639608 | ||||||||||
Coordinates | 1°19′51.6″N 103°39′16.92″E / 1.331000°N 103.6547000°E | ||||||||||
Operated by | SMRT Trains (SMRT Corporation) | ||||||||||
Line(s) | |||||||||||
Platforms | Island | ||||||||||
Tracks | 2 | ||||||||||
Construction | |||||||||||
Structure type | Elevated | ||||||||||
Platform levels | 3 | ||||||||||
Disabled access | Yes | ||||||||||
Other information | |||||||||||
Station code | EW31 | ||||||||||
History | |||||||||||
Opening | Q2 2017[1] | ||||||||||
Services | |||||||||||
| |||||||||||
Location | |||||||||||
|
Tuas Crescent MRT Station (EW31) is a future elevated Mass Rapid Transit station on the East West Line, part of the Tuas West Extension (TWE) in Tuas, Singapore. This station is to provide rail connection to Tuas South and the central part of Tuas from the rest of the island.
History
It was first announced on 11 January 2011 by Transport Minister Mr Raymond Lim in a speech while visiting Bedok when new platform screen doors opened there. It was expected to be completed by 2016 and would benefit an estimated 100,000 commuters daily.
According to Lianhe Zaobao, this station and the tracks linking it will be built in the middle of a vehicular bridge, the first ever in Singapore.
It was later announced on 26 October 2016, that the station will be opened in the second quarter of 2017 instead of 2016, so that the station can take advantage of the new signalling system, which was being implemented in all of the NSEWL stations.
Station layout
L3 | Platform A | East West Line (future service) towards EW1 Pasir Ris via EW30 Gul Circle (→) |
Platform B | East West Line (future service) towards EW33 Tuas Link via EW32 Tuas West Road (←) | |
L2 | Concourse | Faregates, Ticketing Machines, Station Control |
L1 | Street Level | Exit/Entrance |
Transport connections
Destination | First Train | Last Train | ||||
---|---|---|---|---|---|---|
Mon – Sat | Sunday & Public Holiday | Daily | ||||
East West Line | ||||||
to EW1 Pasir Ris | – | – | – | |||
to EW33 Tuas Link | – | – | – |
References
- ↑ "The Rail Report: New Signalling System, Rail Line And Extension And Trains Next Year | Press Room | Land Transport Authority". Lta.gov.sg. Retrieved 2016-10-26.
Coordinates: 1°19′52″N 103°39′17″E / 1.3310°N 103.6547°E