Hunter Valley Coal Chain

An empty coal train heads west through Maitland bound for the coal mines

The Hunter Valley Coal Chain (HVCC) is the chain of coal delivery in New South Wales, Australia from (mainly open-cut) coal mines in the Hunter Region to the Port of Newcastle and domestic coal-fired power stations in the Hunter Valley. The HVCC essentially follows the path of the Hunter River travelling south-east from the mining areas in the Hunter Valley to Newcastle.

The HVCC mainly deals in the sea-borne export coal trade, especially to Asia (Japan and Korea in particular). It is one of six major coal chains in Australia:

The port of Newcastle is the world’s largest coal export port. Rising demand for coal, particularly in the Asian region has resulted in a strong increase in the volume of coal exported through the port. In 2013 port throughput was 150.5 million tonnes, up from 68 million tonnes in 2000.[1]

The chain

Coal loader at Port Waratah, Newcastle

Coal generally goes through the following stages between mine and port:

HVCC Logistics Team

In 2003 the Hunter Valley Coal Chain Logistics Team (HVCCLT) was established to improve the movement of coal from Hunter Valley mines to the port's coal loaders and then to markets across the globe. HVCCLT pools the resources of port operators Newcastle Port Corporation and Port Waratah Coal Services, railway operators Aurizon and Pacific National, and railway infrastructure managers Australian Rail Track Corporation and RailCorp into one logistics team.

Producers

The major coal producers in the Hunter Valley, which utilise approximately 70% of the HVCC capacity, are:

The remaining 30% of coal exported is produced by the small coal producers including:

Consumers

Most coal produced in the Hunter Valley is sold directly by coal mines (producers) to overseas buyers. About 20% of coal is sold by traders who do not mine coal but act as agents or intermediaries in coal sales. The coal traders operating in the Hunter Valley include:

The majority of Australian coal was traditionally sold to Japanese steel mills or power utilities in accordance with long term contracts. Those contracts were the subject of annual price and volume negotiations. The Japanese steel mills, operating in a co-ordinated manner and collectively known as the "JSM", negotiated prices for coking coal. One of the steel mills would be appointed as the lead negotiator for the initial contracts with producers. Prices in subsequent contracts would be based on these ‘benchmark prices’, adjusted for coal quality. This led to "JSM terms" being the benchmark for the industry. While coal is still sold under JSM terms, a greater variety of other contract terms now exist.

Rail infrastructure

Pacific National hauled coal train crossing the Hunter River at Singleton in April 2012

The railway corridor used is part of the Main North railway line. The Hunter Valley infrastructure is owned by the State Government owned RailCorp and managed by the Federal Government owned Australian Rail Track Corporation under a 60-year lease until 2064.[2][3][4] In November 1994, it was announced that the line would be opened up to other operators.[5] Prior to only FreightCorp and its predecessors operated trains. The other infrastructure associated with coal transport, such as load points, is privately owned, usually by a mine or a coal loader.

West of Maitland the line is formed of two tracks, with three in places, with the lines being shared with passenger trains operated by NSW TrainLink. East of Maitland the line is formed of four tracks with the southern pair exclusively for the use of coal trains with an underpass at Hanbury west of Waratah allowing trains to reach Port Waratah without having to interface with the northern pair of tracks. In 2006 the Sandgate Flyover was opened to similarly allow trains to access Kooragang Island.[6] As at December 2012 there were 50 to 60 coal trains per day up to 1.5 kilometres in length.[7]

To alleviate congestion which frequently sees loaded trains queuing, in November 2013 construction commenced on five relief roads at Hexham that will be located between the two running lines, with the westbound line relocated further south. This will allow coal trains to be pass one another and reach the ports in a more logical order. It is scheduled for completion in 2015.[7][8][9]

Aurizon and Pacific National both provide locomotives and freight wagons to operate coal trains. Freightliner Australia provide crews to operate Xstrata owned rolling stock,[10] with Pacific National doing likewise for Whitehaven Coal[11] and Southern Shorthaul Railroad for Centennial Coal.[12]

Port Waratah Coal Services

Bulk carrier Nicole entering Newcastle Harbour in August 2007

Port Waratah Coal Services Limited (PWCS) operates the main coal export facilities in Newcastle. The coal export facilities consist of two coal loading terminals, located on either side of the South Channel of the Hunter River. These are known as the Kooragang Coal Terminal, on Kooragang Island and the Carrington Coal Terminal in the suburb of Carrington. Each of those terminals comprises equipment for the delivery and storage of coal to the terminal and for the loading of coal onto vessels. PWCS leases the land on which the port is situated from the Government of New South Wales under an agreement which states that the port is maintained as a 'common user facility'.

The coal export facilities operated by PWCS have a total capacity of 133 million tonnes per annum (Mtpa):[13]

The distribution of loading between Carrington and Kooragang Coal terminals is dependent on a number of factors:

Newcastle Coal Infrastructure Group

Newcastle Coal Infrastructure Group (NCIG) operates the third coal export facility in Newcastle. Its terminal is also situated on Kooragang Island and has a capacity of 30 million tonnes per annum but it has the development approval for construction of a loader with a capacity of 66 million tonnes per annum for that site. NCIG is developing the site in stages. The company loaded its first ship in the first quarter of 2010. Full 30 million tonnes per annum operations were expected in the first quarter of 2011.

Capacity distribution systems

While productivity in supply chains is an issue for industries of all sizes, few industries have to deal with a network as broad and a demand as pressing as the coal industry.

As at December 2012 Coal accounted for 18% of Australia's exports. But while Australia has an abundance of coal and a ravenous world market, particularly in Asia (especially China, with its expanding need for coal in the steel industry), willing to devour it is disadvantaged by the distance that must be overcome to get the product to the market and the huge number of players involved.

It is for this reason that the supply chain must run as smoothly as possible, moving the raw product from the mines, to the port and onto the ships no easy task. In 2011 Australia exported 281 million tonnes of coal and moved 97% of this by rail.[14]

But over the last five years, getting the coal to these ports, onto the ships and to the market proved to be a difficult operation as the Chinese and other Asian markets demand soared. Freight bottlenecks rapidly developed, primarily at the Dalrymple Bay Coal Terminal and at Newcastle's Port Waratah.

To cope with these bottlenecks, the terminal operators developed capacity management systems to cope with the volumes.

The two hubs developed independent yet similar systems to cope with the problem of how to reduce queues, with Port Waratah using a Capacity Balancing System and Dalrymple Bay a Queue Management System.

The Port Waratah model allocates production from the mines to available shipping in a way that maximises the capacity of the terminal.

Since August 2003, there has been evidence that the Hunter Valley coal export infrastructure has been stretched and that some coal export growth might have been lost as a result of constraints in the system. In response to this situation, Port Waratah Coal Services (manager of the Kooragang coal terminal (located on Kooragang Island and Carrington coal terminals at the Newcastle Port) applied to the Australian Competition and Consumer Commission to implement a short term capacity distribution system to allocate the current capacity of the coal supply chain to existing coal exporters. This scheme was implemented in June 2004 and interim authorisation to continue a modified version of the scheme until December 2007 – called the medium term capacity distribution system – has been granted by the ACCC.

References

  1. Newcastle continues to see record coal exports Transport for New South Wales 10 January 2014
  2. Memorandum between The Commonwealth of Australia & The State of New South Wales & Australian Rail Track Corporation Limited Australian Rail Track Corporation
  3. The Agreement in Summary Australian Rail Track Corporation
  4. Hunter Valley Australian Rail Track Corporation
  5. "Hunter Valley Coal Opened to Private Operators" Railway Digest December 1994 page 6
  6. ARTC Sandgate Flyover Opened by Deputy Prime Minister Australian Rail Track Corporation
  7. 1 2 " Hunter Valley Coal Chain - Rail developments at Hexham, NSW" Railway Digest January 2013 page 36
  8. Reducing coal train congestion at Newcastle Port Australian Rail Track Corporation 25 October 2013
  9. "Construction begins on Hexham Relief Road Project" Railway Digest December 2013 page 12
  10. Freightliner and Xstrata sign Australian coal contract Railway Gazette International 25 September 2009
  11. Hunter Valley High Rollers Trackside
  12. On track to deliver diversification The Australian Mining Review
  13. 1 2 3 PWCS Website, 2012, retrieved 2012-08-23
  14. Australia's coal exports down 19 Mt in 2011 Australian Report January 2012

External links

This article is issued from Wikipedia - version of the 12/2/2016. The text is available under the Creative Commons Attribution/Share Alike but additional terms may apply for the media files.