Interstate 95 in North Carolina

This article is about the section of Interstate 95 in North Carolina. For the entire route, see Interstate 95.

Interstate 95 marker

Interstate 95
Route information
Maintained by NCDOT
Length: 181.71 mi[1][2] (292.43 km)
Existed: 1958[3] – present
Major junctions
South end: I-95 at the South Carolina state line
 
North end: I95 at the Virginia state line
Location
Counties: Robeson, Cumberland, Harnett, Johnston, Wilson, Nash, Halifax, Northampton
Highway system
NC 94NC 96

Interstate 95 (I-95) is a major Interstate Highway, running along the East Coast of the United States from Florida to Maine. In North Carolina, I-95 runs diagonally across the eastern third of the state, from Rowland at the South Carolina border to Pleasant Hill at the Virginia border. From south to north, the route passes through or near the cities of Lumberton, Fayetteville, Wilson, Rocky Mount and Roanoke Rapids. The entire route is rural, forming the informal border between the Piedmont and Coastal Plain regions of the state. There are three auxiliary routes for I-95 in the state: Future I-295, a partially completed bypass of Fayetteville, I-495, a partially completed connector route between Rocky Mount and Raleigh that follows the current U.S. 64 freeway, and I-795, a spur route connecting I-95 to the city of Goldsboro.

Route description

Interstate 95 enters North Carolina at the South Carolina line, just north of the South of the Border attraction and just to the south of the town of Rowland. Traveling mostly northeast from the border, the road enters Lumberton where it interchanges with I-74. Frontage roads through Lumberton have extensive travel services, including restaurants, shops, and hotels. Leaving Lumberton, the route turns due north through a rural area of the state, past the small farming community of St. Pauls. I-95 serves as the eastern bypass of Fayetteville where Interstate 95 Business, an older alignment, connects I-95 to downtown Fayetteville.

I-95 interchanges with I-40 in Benson, North Carolina, U.S. 264 in Wilson, and U.S. 64 in Rocky Mount, three of the main east-west routes in the eastern part of the state. The last city it passes is Roanoke Rapids before leaving the state near the unincorporated community of Pleasant Hill at the Virginia border. For most of the route, I-95 is paralleled closely by U.S. 301.

Services

The North Carolina Department of Transportation (NCDOT) operate and maintain two welcome centers and six rest areas along I-95. Welcome centers, which have a travel information facility on site, are located at mile markers 5 (northbound) and 181 (southbound); rest areas are located at mile markers 47 (north and southbound), 99 (north and southbound) and 142 (north and southbound). Common at all locations are public restrooms, public telephones, vending machines, picnic area and barbecue grills.[4]

The North Carolina Department of Public Safety (NCDPS) operate and maintain four truck inspection/weigh stations along I-95. The Robeson County stations are located on both north and southbound at mile marker 24, each has one fixed scale. The Halifax County stations are located on both north and southbound at mile marker 151, each has two fixed scales.[5]

Dedicated and memorial names

Interstate 95 in North Carolina feature numerous dedicated or memorialized bridges, interchanges and stretches of freeway.

History

I-95 Entering into NC from VA

Established in 1956, as part of the Federal Aid Highway Act of 1956, I-95 was routed along or near existing US 301 throughout the state of North Carolina. By 1961, two stretches of the interstate opened: from mile marker 56, in Fayetteville, to mile marker 107, near Kenly; the other a small bypass near Saint Pauls. In 1964, the Saint Pauls section extended further south into Lumberton; while another small stretch opened from US 158, in Roanoke Rapids, to the Virginia state line. In 1969, I-95 was extended further south from Roanoke Rapids to exit 145, in Gold Rock (later used for NC 4). In 1973, Interstate 95 was completed from Saint Pauls to the South Carolina state line.

By the mid 1970s, I-95 had two gaps along its route: Fayetteville and Kenly-Gold Rock. In May 1978, two Interstate 95 Business loops were established, both overlapping US 301, to help connect through the gaps and make I-95 appear as one continuous route throughout the state. In November 1978, the first gap to be completed was the Kenly-Gold Rock section.[10] The final section of Interstate 95 was completed in 1980, an easterly bypass of Fayetteville.[11][12]

Tolls

The idea of tolling I-95 started in 2001 as a way to pay for improvements along the route. In 2003, state officials sought permission from the Federal Highway Administration for a plan that would cost $3 billion and put toll booths every thirty miles along the entire route. However, this was quickly killed by Governor Mike Easley, who did not support tolls.[13]

In 2006, when the Virginia General Assembly passed the resolution calling for an interstate compact to build a toll highway, North Carolina was asked to join in on the compact of putting tolls along the entire length of Interstate 95 in both states.[14] Again, this was stopped by Governor Mike Easley, who did not see the benefit in such a compact and reiterated his opposition of tolls along Interstate 95.[12]

In 2010, North Carolina leaders revived talks on tolling Interstate 95, submitting a request to the Federal Highway Administration to toll the entire route. Approval would be considered after an environmental assessment and other conditions. Support has grown in a number of factors including the fact that the interstate is mostly rural and used predominantly by out-of-state drivers.[12]

On January 20, 2012, NCDOT received final approval of the Environmental Assessment for improvements along I-95 in North Carolina. The following recommendations were made:

  • Widen I-95 to eight lanes (four lanes in each direction) from exit 31 to exit 81;
  • Widen the remaining sections of I-95 to six lanes (three lanes in each direction);
  • Make necessary repairs to pavement;
  • Raise and rebuild bridges;
  • Improve interchanges; and
  • Bring I-95 up to current safety standards for interstates.

It is estimated to cost $4.4 billion with recommendation that it should be paid through tolls. Construction would begin in two phases: Phase 1 (exit 31-exit 81) would begin in 2016 with tolls starting after completion; phase 2 would begin in 2019, which covers the remainder of the interstate.[15][16][17] With a possible 2019 start date for the tolls, NCDOT plans to install nine overhead toll collection sensors every twenty miles with additional toll collection sensors at exits before tolls (to reduce drivers from jumping off and on at each toll); main toll stations will charge twenty miles each while exit tolls will charge ten miles each. Gaps along the route, where no toll collectors are located, will allow local traffic to utilize the interstate toll free. Though the toll rates have not been established, a NCDOT report suggest charging 19.2 cents per mile (11.9 ¢/km) for cars in the phase 1 section, with a much lower rate of 6.4 ¢/mi (4.0 ¢/km) on phase 2 sections; which would work out to be $19.20 from border to border (trucks with three axles or more will be charged more). Drivers that do not carry a toll transponder (i.e. North Carolina Quick Pass) will have their license numbers recorded by cameras and will be billed by mail, at a higher toll rate.[18]

Future

NCDOT plans to widen I-95 from four to six lanes between mile markers 14 and 21, in Robeson County. However, it is currently flagged "Scheduled for Reprioritization," with no estimated cost or date established.[19] They're also proposing a diverging diamond in Lumberton at Exit 22.[20]

An improvement project along I-95 is in the development stage, between mile markers 56 and 81, in Cumberland and Johnston counties. Improvements include upgraded interchanges, raise and rebuild bridges, and widening of the interstate. The total estimated cost is $526 million, with date of construction starting on the first phase on October, 2017. However, it is currently flagged "Subject to Reprioritization."[21]

Auxiliary routes in North Carolina

Interstate City Type Notes
Interstate 95 Business Fayetteville Business loop Expressway and boulevard grades.
Interstate 95 Business Wilson and Rocky Mount Business loop Boulevard grade. Decommissioned.
Interstate 295 Fayetteville Beltway Future; completed segments designated as NC 295.
Interstate 495 Raleigh Connector Bannered as future between Knightdale to Rocky Mount, along US 64.[22]
Interstate 795 Wilson and Goldsboro Spur

Exit list

CountyLocationmi[2]kmExitDestinationsNotes
RobesonState line0.00.0 I-95 south FlorenceContinuation into South Carolina
Rowland0.00.01 US 301 / US 501 Rowland, Laurinburg, DillonSigned southbound as exits 1A (south) and 1B (north); to South of the Border
Exits 1 northbound and 1A southbound in South Carolina
2.33.72 NC 130 to NC 904 Rowland, Fairmont
7.211.67Raynham Road McDonald, Raynham
10.416.710 US 301 south RaynhamSouth end of US 301 overlap
Lumberton13.020.913A I74 east / US 74 east Whiteville, WilmingtonSigned as exits 13A (east) and 13B (west)
Cloverleaf interchange with collector/distributor roadways
13B I74 west / US 74 west Laurinburg, Rockingham
13.722.014 US 74Permanently closed in 2007; replaced by exit 13
17.027.417 NC 72 / NC 711 Lumberton, Pembroke, Red Springs
18.730.119Carthage Road
19.932.020 NC 211 to NC 41 Lumberton, Red Springs, Fairmont
21.534.622 US 301 north LumbertonNorth end of US 301 overlap
25.040.225 US 301
St. Pauls31.450.531 NC 20 St. Pauls, Raeford
33.053.133 US 301 to NC 71 Parkton, St. Pauls
I295Proposed interchange (unfunded)[23]
Cumberland40.064.440 I95 Bus. north to US 301 Fayetteville, Fort Bragg
Hope Mills41.366.541 NC 59 north Hope Mills
43.970.744Snow Hill Road Fayetteville Regional Airport
46.074.046 NC 87 Elizabethtown, FayettevilleSigned as exits 46A (south) and 46B (north)
Cloverleaf interchange with collector/distributor roadways
Fayetteville49.078.949 NC 53 / NC 210 Fayetteville
Vander51.683.052 NC 24 Fayetteville, ClintonSigned as exits 52A (east) and 52B (west)
Cloverleaf interchange with collector/distributor roadways
Eastover54.687.955Murphy Road
55.188.756 I95 Bus. south to US 301 Fayetteville, Fort Bragg
58.093.358 US 13 north / NC 295 south to US 401 Newton Grove, Fort Bragg
61.298.561Wade–Steadman Road Wade
65.3105.165 NC 82 Godwin, Falcon
Harnett69.5111.870Bud Hawkins Road
70.8113.971Long Branch Road
Dunn72.4116.572Pope Road
73.0117.573 US 421 / NC 55 Dunn, Clinton, Newton Grove
75.0120.775Jonesboro Road
76.9123.877Hodges Chapel Road
JohnstonBenson79.5127.979 NC 50 / NC 242 to NC 27 Benson, Newton Grove
81.0130.481 I40 Wilmington, Raleigh, DurhamSigned southbound as exits 81A (west) and 81B (east)
Four Oaks87.6141.087Keen Road Four Oaks
89.8144.590 US 701 south / NC 96 Newton Grove
Smithfield93.1149.893Brogden Road Smithfield
94.8152.695
US 70 Bus. Smithfield, Goldsboro
To Carolina Premium Outlets
Selma96.9155.997 US 70 (NC 39) Selma, Pine Level, Goldsboro
98.0157.798Pine Level–Selma Road Selma
Micro101.4163.2101Pittman Road
102.5165.0102Main Street Micro
Kenly104.6168.3105Bagley Road
106.0170.6106Truck Stop Road
107.2172.5107 US 301 Kenly, WilsonTo Gov. Charles B. Aycock Birthplace and Tobacco Farm Life Museum
Wilson116.4187.3116 NC 42 Wilson, Clayton
Wilson119.4192.2119A I795 south / US 264 east Wilson, Greenville, GoldsboroSigned as exits 119A (east/south) and 119B (west)
Cloverleaf interchange with collector/distributor roadways
119B US 264 west Raleigh
121.5195.5121
US 264 Alt. Wilson, Sims
Nash126.9204.2127 NC 97 Rocky Mount-Wilson Regional Airport
132.4213.1132 To NC 58 / Sandy Cross Road
Rocky MountSunset AvenueProposed interchange (unfunded).[24][25]
138.5222.9138 US 64 Nashville, Raleigh, Rocky Mount, TarboroSigned as exits 138A (west) 138B (east)
To NC Aquarium and Cape Hatteras National Seashore
Cloverleaf interchange with collector/distributor roadways
Dortches140.8226.6141 NC 43 Red Oak
Rocky Mount145.0233.4145 NC 4 / NC 48 to US 301 – Gold Rock, Rocky Mount
149.8241.1150 NC 33 Whitakers
Halifax153.7247.4154 NC 481 Enfield
160.5258.3160 NC 561 HalifaxTo Medoc Mountain State Park
167.7269.9168 NC 903 Halifax
Roanoke Rapids170.7274.7171 NC 125 Roanoke Rapids
173.0278.4173 US 158 Roanoke Rapids, Weldon
Northampton175.8282.9176 NC 46 Gaston, Garysburg
180.0289.7180 NC 48 Gaston
State line181.7292.4 I95 north RichmondContinuation into Virginia
1.000 mi = 1.609 km; 1.000 km = 0.621 mi
  •       Closed/former
  •       Concurrency terminus
  •       Unopened

See also

References

  1. Federal Highway Administration Route Log and Finder List, Main Routes of the Dwight D. Eisenhower National System Of Interstate and Defense Highways as of October 31, 2002
  2. 1 2 Google (February 13, 2012). "Interstate 95 in North Carolina" (Map). Google Maps. Google. Retrieved February 13, 2012.
  3. "I-95 Fact Sheet" (PDF). North Carolina Department of Transportation. June 21, 2008. Retrieved June 20, 2014.
  4. "NCDOT: North Carolina Rest Areas System". North Carolina Department of Transportation. Retrieved December 29, 2014.
  5. "NCDPS - Weigh Stations". North Carolina Department of Public Safety. Retrieved December 29, 2014.
  6. 1 2 "North Carolina Memorial Highways and other Named Facilities" (PDF). Retrieved October 7, 2012.
  7. "NCDOT: NC Blue Star Memorial Marker Locations". Retrieved October 7, 2012.
  8. "The Blue Star Memorial Marker Program Directory" (PDF). Retrieved October 10, 2012.
  9. Staff (March 22, 2013). "NCDOT Names Section of I-95 in Johnston County as Dick Fleming Freeway". Raleigh, NC: North Carolina Department of Transportation. Retrieved March 31, 2013.
  10. "Opening of I-95 Set For Monday". Spring Hope Enterprise. November 16, 1978. Retrieved February 26, 2015.
  11. "NCRoads.com: I-95". Retrieved January 21, 2012.
  12. 1 2 3 Siceloff, Bruce (June 13, 2010). "Talk of I-95 tolls revives". The News & Observer. Raleigh, NC. Retrieved January 21, 2012.
  13. "Interstate-Guide: Interstate 95". Retrieved January 21, 2012.
  14. "SJ 184 Interstate Route 95". Retrieved January 21, 2012.
  15. Staff (January 20, 2012). "Environmental Assessment Approved for I-95 Improvements". NCDOT. Retrieved January 21, 2012.
  16. The Associated Press (January 21, 2012). "NC report recommends tolls on Interstate 95". The News & Observer. Raleigh, NC. Retrieved January 21, 2012.
  17. Dorsey, Steve (January 21, 2012). "NC DOT considers making I-95 a toll road". Durham, NC: WTVD-TV. Retrieved January 21, 2012.
  18. Siceloff, Bruce (February 12, 2012). "Plan fights evasion of I-95 toll in North Carolina". The News & Observer. Raleigh, NC. Retrieved February 13, 2012.
  19. "NCDOT: Project I-3806". Retrieved January 21, 2012.
  20. "I-95 Diverging Diamond Interchange in Lumberton; Roebson County". North Carolina Department of Transportation. Retrieved 4 October 2014.
  21. "NCDOT: Project I-4745". Retrieved January 21, 2012.
  22. "North Carolina Gets a New Interstate, with the I-495 Designation near Raleigh". Raleigh, NC: North Carolina Department of Transportation. December 12, 2013. Retrieved December 12, 2013.
  23. Staff. "NCDOT Project U-2519". North Carolina Department of Transportation. Retrieved February 14, 2012.
  24. Staff. "City of Rocky Mount TIP Status Report" (PDF). City of Rocky Mount. Retrieved February 14, 2012.
  25. Staff. "NCDOT Project U-5026". North Carolina Department of Transportation. Retrieved February 14, 2012.

Route map: Bing / Google

KML is from Wikidata
Interstate 95
Previous state:
South Carolina
North Carolina Next state:
Virginia
This article is issued from Wikipedia - version of the 11/15/2016. The text is available under the Creative Commons Attribution/Share Alike but additional terms may apply for the media files.