World Trade Center (2001–present)

World Trade Center

The complete One and 4 World Trade Center as seen from Jersey City, New Jersey. 2 and 3 World Trade Center are still in the early stages of construction.
General information
Status Partially completed[note 1]
Location New York City
Coordinates 40°42′42″N 74°00′45″W / 40.71167°N 74.01250°W / 40.71167; -74.01250Coordinates: 40°42′42″N 74°00′45″W / 40.71167°N 74.01250°W / 40.71167; -74.01250
Groundbreaking 2002
Construction started
  • 1 WTC: April 27, 2006[1]
  • 2 WTC: June 1, 2010
  • 3 WTC: 2010
  • 4 WTC: January 2008
  • 7 WTC: May 7, 2002[2]
Completed
  • 1 WTC: July 2014
  • 4 WTC: November 13, 2013[3]
  • 7 WTC: May 23, 2006[4]
Opening
  • 1 WTC: November 3, 2014
  • 2 WTC: 2021 (est.)
  • 3 WTC: 2018 (est.)
  • 4 WTC: November 12, 2013
  • Transportation Hub: March 3, 2016[5]
Owner

Port Authority of New York and New Jersey

The World Trade Center is a partially completed complex of buildings under construction in Lower Manhattan, New York City, United States, replacing an original complex of seven buildings with the same name on the same site that were damaged or destroyed in the September 11 attacks. The site is being rebuilt with six new skyscrapers, a memorial and museum to those killed in the attacks, and a transportation hub. One World Trade Center, the tallest building in the United States, is the lead building for the new complex, reaching more than 100 stories[16] upon its completion in November 2014.[17] The original World Trade Center complex featured the landmark Twin Towers, which opened in 1973, and were the tallest buildings in the world at their completion. They were destroyed on the morning of September 11, 2001, when Al-Qaeda-affiliated hijackers flew two Boeing 767 jets into the complex in a coordinated act of terrorism. The attacks on the World Trade Center killed 2,753 people.[18] The resulting collapse caused structural failure in many of the surrounding buildings as well. The process of cleaning up and recovery at the World Trade Center site took eight months, after which rebuilding of the site commenced.[19][20]

After years of delay and controversy, reconstruction at the World Trade Center site is now underway. The new complex includes One World Trade Center (formerly known as the Freedom Tower), 7 World Trade Center, three other high-rise office buildings, a museum and memorial, and a transportation hub similar in size to Grand Central Terminal. One World Trade Center was completed on August 30, 2012, and the final component of its spire installed on May 10, 2013. 4 World Trade Center opened in November 2014.[21][22] The 9/11 memorial is complete, and the museum opened on May 21, 2014.[23] 3 World Trade Center and the Transportation Hub are also making progress, and are set to be finished in 2018[24] and mid-2016,[25] respectively. 2 World Trade Center's full construction was placed on hold in 2009; however, on June 9, 2015, it was reported that the building would undergo a new design, led by architect Bjarke Ingels of the Bjarke Ingels Group (BIG). It was also reported that the newly designed 2 World Trade Center would become the headquarters for Rupert Murdoch's 21st Century Fox and News Corp, which later decided against moving into 2 World Trade Center, leading to uncertainty over the future of BIG's design.

Original towers

The original World Trade Center featured the landmark Twin Towers, which opened on April 4, 1973, and were the tallest buildings in the world at their completion. The other buildings in the complex included the Marriott World Trade Center (3 WTC), 4 WTC, 5 WTC, 6 WTC, and 7 WTC.[26][27]

Destruction

They were destroyed on the morning of September 11, 2001, when Al-Qaeda-affiliated hijackers flew two Boeing 767 jets into the complex in a coordinated act of terrorism. At 8:46 A.M. Eastern Time (ET), a team of five hijackers intentionally crashed American Airlines Flight 11 into the northern facade of the North Tower. At 9:03 A.M. ET, a second team of five hijackers intentionally crashed United Airlines Flight 175 into the southern facade of the South Tower. After burning for 56 minutes, the South Tower collapsed at 9:59 A.M. At 10:28 A.M., the North Tower collapsed, after burning for 102 minutes. The attacks on the World Trade Center killed 2,753 people.[18] The resulting collapse caused structural failure in many of the surrounding buildings as well. The process of cleaning up and recovery at the World Trade Center site took eight months, after which rebuilding of the site commenced.[28][29]

Cleanup

Preliminary site plans for the World Trade Center's reconstruction.

The process of cleanup and recovery continued 24 hours a day over a period of eight months. Debris was transported from the World Trade Center site to Fresh Kills Landfill on Staten Island, where it was further sifted.[30] On May 30, 2002, a ceremony was held to officially mark the end of the cleanup efforts.[31] In 2002, ground was broken on construction of a new 7 WTC building located just to the north of the main World Trade Center site. Since it was not part of the site master plan, Larry Silverstein was able to proceed without delay on the rebuilding of 7 World Trade Center, which was completed and officially opened in May 2006; this had been considered a priority since restoring Consolidated Edison Co.'s electrical substation in the building's lower floors was necessary to meet power demands of Lower Manhattan.[32][33][34] While 7 World Trade Center was not part of the master plan for the Twin Towers site, Silverstein and Con Edison recognized that the rebuilding of 7 World Trade Center would have to be consistent with the master plan which was expected to re-open the street grid which had been blocked by the original World Trade Center super-block. As a result, the design for the new 7 World Trade Center allowed for the re-opening of Greenwich Street, which had been blocked by the original 7 World Trade Center.[35] A temporary PATH station at the World Trade Center opened in November 2003, pending replacement by a permanent station designed by Santiago Calatrava.[36]

With the main World Trade Center site, numerous stakeholders were involved including Silverstein and the Port Authority, which in turn meant that George Pataki, the then-Governor of New York, had some authority. In addition, the victims' families, people in the surrounding neighborhoods, Mayor Michael Bloomberg, and others wanted input. Governor Pataki established the Lower Manhattan Development Corporation (LMDC) in November 2001 as an official commission to oversee the rebuilding process.[37] The LMDC held a competition to solicit possible designs for the site. The Memory Foundations design by Daniel Libeskind was chosen as the master plan for the World Trade Center site.[38] The plan included the 1,776 feet (541 m) Freedom Tower (now known as One World Trade Center) as well as a memorial and a number of other office towers. Out of the World Trade Center Site Memorial Competition, a design by Michael Arad and Peter Walker titled Reflecting Absence was selected in January 2004.[39]

Planning

Governor Pataki established the Lower Manhattan Development Corporation (LMDC) in November 2001, as an official commission to oversee the rebuilding process.[40] The LMDC coordinates federal assistance in the rebuilding process, and works with the Port Authority, Larry Silverstein, and Studio Daniel Libeskind, the master plan architect for the site's redesign. The corporation also handles communication with the local community, businesses, the city of New York, and relatives of victims of the September 11 attacks.[41] A 16-member board of directors, half appointed by the governor and half by the mayor of New York, governs the LMDC.[42] The LMDC had questionable legal status regarding the restoration of the World Trade Center site, because the Port Authority owns most of the property and Larry Silverstein leased the World Trade Center's office space in July 2001. But the LMDC, in an April 2002 articulation of its principles for action, asserted its role in revitalizing lower Manhattan.[43]

In the months following the attacks, architects and urban planning experts held meetings and forums to discuss ideas for rebuilding the site.[44] In January 2002, New York City art dealer Max Protetch solicited 50 concepts and renderings from artists and architects, which were put on exhibit in his Chelsea art gallery.[45]

In April 2002, the LMDC sent out requests for proposals to redesign the World Trade Center site to 24 Manhattan architecture firms, but then soon withdrew them. The following month, the LMDC selected Beyer Blinder Belle as planner for the redesign of the World Trade Center site.[46] On July 16, 2002, Beyer Blinder Belle unveiled six concepts for redesigning the World Trade Center site.[47] All six designs were voted "poor" by the roughly 5,000 New Yorkers that submitted feedback, so the LDMC announced a new, international, open-design study.[48]

The National September 11 Memorial & Museum. The memorial is in the foreground, the museum to the left.

In an August 2002 press release, the LMDC announced a design study for the World Trade Center site.[49] The following month, the LMDC, along with New York New Visions – a coalition of 21 architecture, engineering, planning, landscape architecture and design organizations – announced seven semifinalists. The following seven architecture firms were then invited to compete to be the master plan architect for the World Trade Center:

Peterson Littenberg, a small New York architecture firm, had been enlisted by the LMDC earlier that summer as a consultant, and was invited to participate as the seventh semifinalist.[51]

The seven semifinalists presented their entries to the public on December 18, 2002, at the Winter Garden of the World Financial Center. In the following weeks, Skidmore, Owings & Merrill withdrew its entry from the competition.[52]

Days before the announcement of the two finalists in February 2003, Larry Silverstein wrote to LMDC Chair John Whitehead to express his disapproval of all of the semifinalists' designs. As the Twin Towers' insurance money recipient, Silverstein claimed that he had the sole right to decide what would be built. He announced that he had already picked Skidmore, Owings & Merrill as his master planner for the site.[53] On February 1, 2003, the LMDC selected two finalists, the THINK Team and Studio Daniel Libeskind, and planned on picking a single winner by the end of the month. Rafael Viñoly of the THINK Team and Studio Daniel Libeskind presented their designs to the LMDC, which selected the THINK design. Earlier the same day, however, Roland Betts, a member of the LMDC, had called a meeting and the corporation had agreed to vote for the THINK design before hearing the final presentations. Governor Pataki, who had originally commissioned the LMDC, intervened and overruled the LMDC's decision.[53] On February 27, 2003, Studio Daniel Libeskind officially won the competition to be the master planner for the World Trade Center redesign.

Libeskind's original proposal, which is titled Memory Foundations, underwent extensive revisions during collaboration with Larry Silverstein, and Skidmore, Owings & Merrill, whom Silverstein hired.[54] Though Libeskind designed the site, the individual buildings have been designed by different architects. While not all of Liebeskind's ideas were incorporated into the final design, his design and the public support it garnered did solidify the principle that the original footprints of the Twin Towers should be turned into a memorial and not be used for commercial purposes. As a result, Liebeskind's lawyers at the New York firm of Wachtell Lipton embarked on the multi-year negotiation process to frame a master plan for the rebuilding.[55] The first step in this process, completed in 2003, was the "swap" in which Silverstein gave up his rights to the footprints of the Twin Towers so that they could become a memorial, and in exchange received the right to build five new office towers around the memorial.[56] The "swap" and the ensuing negotiations, which lasted for many years, have been referred to as the most complex real estate transaction in human history because of the complexity of the issues involved, the many stakeholders, and the difficulty of reaching consensus.[57]

Controversy and criticism

There was much debate regarding the future of Ground Zero following the destruction of the World Trade Center. Disagreement and controversy regarding who owned the property and what would be built there hindered construction at the site for several years. Many wanted the Twin Towers to be rebuilt, but stronger and taller. The project for new Twin Towers was called Twin Towers II which was led by the informal organization, Twin Towers Alliance.[58] Others did not want anything built there at all or wanted the entire site to become a memorial. Finally, a master plan was agreed upon, which would feature a memorial and museum where the original Twin Towers stood and six new skyscrapers surrounding it.[59]

The social center of the old World Trade Center included a spectacular restaurant on the 107th floor, called Windows on the World, and its Greatest Bar in the World; these were tourist attractions in their own right, and a social gathering spot for people who worked in the towers.[60][61] This restaurant also housed one of the most prestigious wine schools in the United States, called "Windows on the World Wine School", run by wine personality Kevin Zraly.[62] Despite numerous assurances that these local landmarks and global attractions would be rebuilt,[63] the Port Authority scrapped plans to rebuild these WTC attractions, which has outraged some observers.[64]

An episode of CBS's 60 Minutes in 2010 focused on the lack of progress at Ground Zero, particularly on the lack of completion dates for a majority of the buildings, the main tower, One World Trade Center's having undergone three different designs, and the delays and monetary expense involved. Investor Larry Silverstein said the Port Authority's estimated completion date for the entire site was 2037, and billions of dollars had already been spent on the project, even though Ground Zero "is still a hole in the ground". During an interview for the episode, Larry Silverstein said: "I am the most frustrated person in the world....I'm seventy-eight years of age; I want to see this thing done in my lifetime".[65]

One World Trade Center itself was met with criticism early in its planning and construction stages.[66] The original design, which was asymmetrical, significantly shorter, and called for an off-center spire, was met with much disapproval, causing a new one to be devised. A key feature of the final design, the fortified, windowless base, was also denounced as looking dreary and unwelcoming.[67] To alleviate this problem, the designers decided to clad it with prismatic glass panels. Since the failure of that plan, it is now unclear what the base will be covered with. The name change from Freedom Tower to One World Trade Center was met with some criticism.[68] The then-Governor of New York, George Pataki, stated in 2003 that "[t]he Freedom Tower isn't going to be One World Trade Center, it's going to be the Freedom Tower."[69]

Rebuilding

Large construction side with cranes and two recessed, square areas
Construction of the 9/11 Memorial complex in December 2010

On March 13, 2006, workers arrived at the World Trade Center site to remove remaining debris and start surveying work. This marked the official start of construction of the National September 11 Memorial & Museum, though not without controversy and concerns from some family members.[70] In April 2006, the Port Authority and Larry Silverstein reached an agreement in which Silverstein ceded rights to develop the Freedom Tower and Tower Five in exchange for financing with Liberty Bonds for Towers Two, Three, and Four.[71][72] On April 27, 2006, a ground-breaking ceremony was held for the Freedom Tower.[73]

In May 2006, architects Richard Rogers and Fumihiko Maki were announced as the architects for Towers Three and Four, respectively.[74] The final designs for Towers Two, Three and Four were unveiled on September 7, 2006. Tower Two, or 200 Greenwich Street, will have a roof height of 1,254 feet (382 m) and a 96 feet (29 m) tripod spire for a total of 1,350 feet (410 m). Tower Three, or 175 Greenwich Street will have a roof height of 1,155 feet (352 m) and an antenna height reaching 1,255 feet (383 m). Tower Four, or 150 Greenwich Street, will have an overall height of 946 feet (288 m).[75] On June 22, 2007, the Port Authority of New York and New Jersey announced that JP Morgan Chase will build Tower 5, a 42-story building on Site 5 occupied by the Deutsche Bank Building,[76] and Kohn Pedersen Fox was selected as the architect for the building.[77] Four renowned architects, including Spanish architect Santiago Calatrava, who designed the transit hub, One WTC designer David Childs of Skidmore, Owings and Merrill, and the famed British architect Norman Foster of Foster and Partners designed Tower Two and masterminded the iconic diamond design, will greatly enhance the street-level atmosphere of the rebuilt site. The projects will be complete between early 2013 to mid-2015 respectively.[78]

Publisher Condé Nast agreed to move its headquarters to One World Trade Center in 2010, and with this shift, many more tenants were expected to move to the building.[79] As of August 2011, One World Trade Center was at 80 stories with glass up to the 54th floor, Tower Four was up around 38 stories with glass up to the 15th floor, and the former Deutsche Bank Building had been completely dismantled, and the Port Authority was working on their Vehicle Security Center.[80] The World Trade Center Transportation Hub's PATH hall is nearly complete. The memorial officially opened to relatives of the deceased on September 11, 2011, and to the general public on September 12. World Trade Center Tower Three's foundations are becoming visible, and was completed in mid-2014.[81][82] By December 2011, Tower Two's foundations were finished and assembly of the frame was started.[83] Because numerous American and Chinese companies were "very interested" in leasing space at the WTC, Two World Trade Center was likely to be finished earlier than expected.[84]

A report in September 2013 revealed that, at the time of the report, the World Trade Center Association (WTCA) continues to negotiate with the One World Trade Center in regard to the title "World Trade Center", as the WTCA purchased the rights to the name in 1986. The WTCA is seeking free office space in the tower worth US$500,000 in exchange for the use of "World Trade Center" on the One World Trade Center tower and associated souvenirs.[85]

In early December 2013, Australian retail corporation Westfield announced that it would invest US$800 million for complete control of the retail space at the rebuilt center. Westfield Corporation, a global shopping mall operator, will purchase the Port Authority of New York and New Jersey’s 50 percent stake in the retail part of the World Trade Center site, increasing its total investment to more than US$1.4 billion.[86]

In April 2014, with the opening of the 9/11 Museum, temporary fences, used for construction, were removed around the 9/11 Memorial. At the same time, the 9/11 Memorial discontinued the requirement for tickets in order to enter the memorial, not only providing pedestrian access to the future towers, but also a path through the site to the Memorial Plaza and surrounding streets.[87] All construction-related fences in the World Trade Center are expected to be removed with the opening of the final tower sometime in 2015–18.[88]

Structures

Six towers, a 9/11 memorial and museum, a mall, a transportation hub, a parking lot, a park, a church, and a performing arts venue are to eventually occupy the new World Trade Center. As of June 2016, progress on the construction of the redesigned site was as follows:

Name Image Date construction started Date of completion Construction summary Height (height including spire in parentheses) Current status
One World Trade Center April 27, 2006 November 3, 2014 Construction was supposed to begin in Fall 2004 after the design plans were finalized earlier that year, but the NYPD raised security concerns, which caused extensive revisions to the existing plans, thus delaying the start of the construction of the building by two years.[89] Among the notable changes, the tower was moved further away from the West Highway, and a heavily fortified base to the building was added.[90] In 2006, the Port Authority took over from Silverstein Properties, as the project's developer Tishman Construction Corporation is the construction manager.[91] Construction began in April 2006. Digging the foundation and installing tower-foundation steel columns, concrete, and rebar took twice as long as it normally would. The construction crews were prevented from using heavy machinery to dig the foundation due to the building's location, which is closer to the existing subway line.[90] The building reached grade level by 2010, progressed at a pace of one floor a week, topped out in August 2012, and was structurally completed in May 2013.[92] The building opened on November 3, 2014, and the first 170 employees of anchor tenant Conde Nast began their work there.[93] 417 metres (1,368 ft) (541 metres (1,775 ft)} Completed
2 World Trade Center Link November 10, 2008 c.2021 Construction of everything up to street level was completed in mid-2013.[94][95] The rest of the building, however, has yet to be built until tenants for Tower 2 can be found.[96][97] 382 metres (1,253 ft) (410 metres (1,350 ft)) On hold
3 World Trade Center Link November 10, 2008 c.2018 Groundbreaking occurred in Fall 2008, but construction halted in Summer of 2012 due to lack of anchor tenants. However, work progressed on below-grade foundations and the ground-level podium, which was completed by October 2013.[98][99] Anchor tenant Group M was finally signed in late 2013,[100] but finance negotiations between Silverstein Properties and the Port Authority dragged, until an agreement was reached in June 2014. Construction resumed in August 2014, and building is now scheduled to be completed by 2018.[101] 352 metres (1,155 ft) (383 metres (1,257 ft)) Structurally Topped-out
4 World Trade Center November 10, 2008 November 13, 2013 Construction began in the fall of 2008 and the building was declared complete on November 13, 2013.[102][103][104][105] The first tenants to move in were two government agencies,[106] and as of July 2015, the building is 62% leased.[107] 288 metres (945 ft) Completed
5 World Trade Center Link September 9, 2011 c.2020 Site preparation work began on September 9, 2011, with the Port Authority acting as the building's developer.[108] but construction on the main structure never commenced.[109] 226 metres (741 ft) On hold
7 World Trade Center May 7, 2002 May 23, 2006 Construction of the new 7 World Trade Center began in 2002 and was completed in 2006. The building is 52 stories tall (plus one underground floor), making it the 28th-tallest in New York.[8][110] Opened on May 23, 2006 and achieved LEED gold status.[111] 207 metres (679 ft) Completed
National September 11 Memorial March 13, 2006 September 11, 2011 The Memorial opened on September 11, 2011, coinciding with the 10th anniversary of the attacks.[112][113] Completed
National September 11 Museum March 13, 2006 May 21, 2014 The museum was initially scheduled to open on September 11, 2012, one year after the opening of the Memorial. However, construction was halted in December 2011 due to financial disputes between the Port Authority of New York and New Jersey and the National September 11 Memorial and Museum Foundation, deciding on who should be responsible for infrastructure costs. Those disputes were resolved and construction resumed on March 13, 2012. Further delays were caused when Hurricane Sandy significantly damaged the site in November 2012. The museum was completed and opened to families of the victims on May 15, 2014 and opened to the general public on May 21, 2014. Completed
World Trade Center Transportation Hub April 26, 2010 March 3, 2016 A temporary PATH station opened in 2003 and construction on the permanent station was supposed to begin in fall 2004; however, the NYPD raised security concerns on the entire site. Among the revisions effecting the Transportation Hub was doubling the number of support columns.[89] In the original plan, the construction of the 9/11 Memorial and Museum was only supposed to have begun after the Transportation Hub had been completed because the roof of the Transportation Hub provided the foundation on which the Memorial rested upon and the walls of the Museum.[114] Due to the two-year delay and pressure by the victims' families to have the Memorial completed by the 10-year anniversary, it was decided to concentrate on building the Memorial, and holding off construction of the Transportation Hub. Construction finally began on the Transportation Hub in 2010, and it opened on March 3, 2016, seven years after it was originally expected to be finished.[5] Completed
Ronald O. Perelman Performing Arts Center N/A 2017 c.2020 Construction was to begin in December 2014 when the removal of the temporary PATH station commenced.[115] However, after a downgrade of plans, the construction date was moved back indefinitely. After the PATH station is removed, construction may start. In November 2015, it was announced that Joshua Prince-Ramus was awarded the contract to design the building. On September 8, 2016, the design was revealed to mostly positive reviews from architecture critics. Construction will begin in early 2017, after the temporary PATH station is removed. The center is planned to open in 2020.[116] Construction not started
Vehicular Security Center N/A November 10, 2011 c.2017 The underground complex and the checkpoint of the VSC is completed, but it has not yet opened.[115] Completed, but not in use.
Liberty Park November 20, 2013 June 29, 2016 Construction began in November 2013 when the Vehicular Security Center's roof was structurally complete. Opened in June 2016.[117][118] Completed
St. Nicholas Greek Orthodox Church N/A October 18, 2014 c.2017 Construction began with the groundbreaking occurring on October 18, 2014. The structure should be complete by late 2016 or early 2017.[119] Under construction

Towers

The completed 7 World Trade Center in 2008.

One World Trade Center (previously coined the "Freedom Tower" by Governor Pataki) is the centerpiece of Libeskind's design. The building rises to 1,368 feet (417 m), the height of the original World Trade Center north tower, and its antenna rises to the symbolic height of 1,776 feet (541 m). This height refers to 1776, the year in which the United States Declaration of Independence was signed. The tower was a collaboration between Studio Daniel Libeskind and Skidmore, Owings & Merrill architect David Childs.[120] Childs acted as the design architect and project manager for the tower, and Daniel Libeskind collaborated on the concept and schematic design.[121] According to a NY1 article on March 8, 2011, a plan to build a restaurant on top of One World Trade Center (to duplicate the Windows on the World restaurant atop the previous North Tower) was scrapped entirely because of potential risk of rising costs to build and maintain the establishment over the benefits of having one at all.[122] Also in 2011 it was confirmed that Condé Nast Publications would be a primary tenant of the building.[123][124]

Danish architect Bjarke Ingels designed Two World Trade Center, also known as 200 Greenwich Street. The building's gardens integrate Tribeca with the Financial District at the World Trade Center.[94][95]

Richard Rogers Partnership designed Three World Trade Center, or 175 Greenwich Street, which stands across Greenwich Street from the Memorial's two reflecting pools.[98][99]

Maki and Associates designed Four World Trade Center, also known as 150 Greenwich Street.[125][126]

Five World Trade Center was designed by Kohn Pedersen Fox and will stand where the Deutsche Bank Building once stood. On June 22, 2007, the Port Authority announced that JP Morgan Chase will lease the 42-story building for its investment banking headquarters;[127][128] however, JPMorgan's March 2008 acquisition of Bear Stearns had caused construction to stagnate, as the company changed its plans and relocated its headquarters to 383 Madison Avenue.[129] Construction began on September 9, 2011.[109]

7 World Trade Center stands off of Port Authority property. David Childs of Skidmore, Owings & Merrill designed the tower, which opened in May 2006.[130]

Memorial and museum

The completed South Pool in April 2012

A memorial called "Reflecting Absence" honors the victims of the September 11 attacks and the 1993 World Trade Center bombing.[131] The memorial, designed by Peter Walker and Israeli-American architect Michael Arad, consists of a field of trees interrupted by the footprints of the twin towers. Pools of water fill the footprints, underneath which sits a memorial space whose walls bear the names of the victims. The slurry wall, which holds back the Hudson River in the west and was an integral part of Libeskind's proposal, remains exposed.[132] Walker and Arad were selected from more than 5,000 entrants in the World Trade Center Site Memorial Competition in January 2004. Construction of the memorial was completed before September 11, 2011.[133][134][135][136][137][138][139][140][141]

On October 12, 2004, the LMDC announced that Gehry Partners LLP and Snøhetta, an architectural firm from Norway, would design the site's performing arts and museum complexes, respectively, in the same area as the memorial.[142][143] The Snøhetta-designed museum[144] will act as a memorial museum and visitors' center, after family members of 9/11 victims objected to the building's original occupant, the International Freedom Center.[145] Gehry's performing arts complex will house only the Joyce Theater, as the Signature Theater Company dropped out due to space constraints and cost limitations.[145] The Ground Zero Museum Workshop is a privately run 501c nonprofit museum that is not connected to the official Ground Zero Memorial or Gehry's museum.[146]

Retail space

In early December 2013, Australian retail corporation Westfield announced that it will invest US$800 million for complete control of the retail space at the rebuilt center. Westfield purchased the Port Authority of New York and New Jersey’s 50 percent stake in the retail part of the World Trade Center site, increasing its total investment to more than US$1.4 billion.[147] Westfield World Trade Center opened with its first group of stores on August 16, 2016.[148][149]

Transportation Hub

Entrance to the PATH at the World Trade Center

Santiago Calatrava designed the World Trade Center Transportation Hub (its main asset being the PATH station) to replace the old World Trade Center station.[150] The Transport Hub will connect the PATH station and 1 New York City Transit Authority subway train to the ferry terminal, the World Financial Center and One World Trade Center on the west and the 2 3 4 5 A C J Z N R W New York City Transit Authority subway trains through the Fulton Center on the East. One will be able to walk most of the way across lower Manhattan. The Port Authority will cool the new station, as well as the September 11 Memorial and Museum, via a heat exchanger fed by four pipes carrying water from the Hudson River.[151] The cost for the transportation hub is estimated at $3.44 billion.[25][152][153]

St. Nicholas Greek Orthodox Church

Government officials have backed down from a July 2008 deal to relocate the St. Nicholas Greek Orthodox Church, the only church destroyed in the September 11 attacks.[154][155]

A deal has been reached between church officials, Governor Andrew Cuomo, and the Port Authority to have the church rebuilt on the same site, but three times the original size on October 14, 2011, according to NY1.[156]

Logo

The World Trade Center's new logo, revealed in August 2014, was designed by the firm Landor Associates and shaped like a "W". All the black bars, the empty spaces, and the "W" itself symbolizes something, giving the logo at least six meanings:[157]

Landor Associates was awarded a $3.57 million contract in 2013 for redesigns, which comprised "the performance of professional services for the development and implementation of the World Trade Center (WTC) site-wide wayfinding, signage, and operational communications program" and included the development of the new logo.[160] Douglas Riccardi, the principal in the design firm Memo, stated, "Its strength is its ability to be seen in many ways. You could never get more meaning in five little bars. The problem is that people may not bother to find out what the meanings are."[159]

See also

References

Explanatory notes

  1. One, 4, and 7 WTC, as well as the 9/11 Memorial and Museum, Liberty Park, and the Transportation Hub are complete. 2, 3, and 5 WTC, as well as the Vehicle Security Center and the Performing Arts Center are under construction.

Citations

  1. "Building of N.Y. Freedom Tower begins". USA Today. Associated Press. April 28, 2006. Retrieved July 4, 2016.
  2. Bagli, Charles V. (May 8, 2002). "As a Hurdle Is Cleared, Building Begins At Ground Zero". The New York Times. Retrieved August 16, 2009.
  3. "|| World Trade Center ||". Wtc.com. December 31, 2013. Retrieved February 3, 2014.
  4. "7 World Trade Center Opens with Musical Fanfare". Lower Manhattan Development Corporation (LMDC). May 22, 2006. Archived from the original on August 9, 2007. Retrieved July 27, 2007.
  5. 1 2 "At Last, Tour Santiago Calatrava's World Trade Center Transportation Hub". Curbed New York. February 25, 2016. Retrieved February 25, 2016.
  6. 1 2 "One World Trade Center to retake title of NYC's tallest building". Fox News Channel. Associated Press. April 29, 2012. Retrieved May 1, 2014.
  7. 1 2 "7 World Trade Center". Skidmore, Owings & Merrill. Retrieved July 4, 2016.
  8. 1 2 3 4 5 "One World Trade Center - The Skyscraper Center". Council on Tall Buildings and Urban Habitat. Retrieved July 4, 2016.
  9. 1 2 3 "7 World Trade Center - The Skyscraper Center". Council on Tall Buildings and Urban Habitat. Archived from the original on August 5, 2014.
  10. "Stacking Diagram | Silverstein Properties". 4wtc.com. Retrieved February 3, 2014.
  11. "Overview: 7 World Trade Center". Silverstein Properties. Retrieved July 4, 2016.
  12. "World Trade Center Tour". Council on Tall Buildings and Urban Habitat (CTBUH). Retrieved July 4, 2016.
  13. "One World Trade Center". The Skyscraper Center. Retrieved December 16, 2014.
  14. "Twin Towers Engineered To Withstand Jet Collision". The Seattle Times. February 27, 1993.
  15. World Trade Center (2001–present) at Emporis
  16. "New World Trade Center climbs to 100 stories". Associated Press. April 2, 2012.
  17. "World Trade Center Reopens for Business". Associated Press. Retrieved November 3, 2014.
  18. 1 2 "Man's death from World Trade Center dust brings Ground Zero toll to 2,753". Daily News. New York. Associated Press. June 18, 2011. Retrieved September 1, 2011.
  19. Iovine, Julie V. (September 27, 2001). "Designers Look Beyond Debris". The New York Times. Retrieved July 31, 2010.
  20. "The Last Steel Column". The New York Times. May 30, 2002. Retrieved July 31, 2010.
  21. "Lower Manhattan : 1 World Trade Center". Lowermanhattan.info. Archived from the original on December 16, 2011. Retrieved December 11, 2011.
  22. "Lower Manhattan : 4 World Trade Center (150 Greenwich Street)". Lowermanhattan.info. September 8, 2006. Archived from the original on November 28, 2011. Retrieved December 11, 2011.
  23. "National September 11 Memorial & Museum | World Trade Center Memorial". 911memorial.org. December 7, 2011. Retrieved December 11, 2011.
  24. Rich, Schapiro (March 17, 2014). "Blocking 3 World Trade Center deal a bad idea". New York Post. Retrieved June 9, 2014.
  25. 1 2 Grynbaum, Michael M. (February 24, 2011). "Trade Center Transit Hub's Cost Now Over $3.4 Billion". The New York Times. Retrieved February 25, 2011.
  26. Holusha, John (January 6, 2002). "Commercial Property; In Office Market, a Time of Uncertainty". The New York Times. Retrieved November 21, 2008.
  27. "Ford recounts details of Sept. 11". Real Estate Weekly. BNET. February 27, 2002. Retrieved January 3, 2009.
  28. Iovine, Julie V. (September 27, 2001). "Designers Look Beyond Debris". The New York Times. Retrieved July 31, 2010.
  29. k Times%5d%5d "The Last Steel Column" Check |url= value (help). May 30, 2002. Retrieved July 31, 2010.
  30. "Items from World Trade Center Recovery Operation, Fresh Kills Landfill". Online Collections Database. Staten Island Historical Society.
  31. "Ceremony closes 'Ground Zero' cleanup". CNN. May 30, 2002. Archived from the original on October 31, 2008. Retrieved September 11, 2008.
  32. Bagli, Charles V. (January 31, 2002). "Developer's Pace at 7 World Trade Center Upsets Some". The New York Times. Retrieved February 17, 2008.
  33. "7 World Trade Center Opens with Musical Fanfare". Lower Manhattan Development Corporation (LMDC). May 22, 2006. Archived from the original on August 9, 2007. Retrieved July 27, 2007.
  34. "Major Step at Ground Zero: 7 World Trade Center Opening". Architectural Record. May 17, 2006. Retrieved February 17, 2008.
  35. "Experts Discuss Planning, Designing and Rebuilding World Trade Center". Cornell Chronicle. July 27, 2011.
  36. "Urban Design and Visual Resources (Chapter 7)" (PDF). Permanent WTC Path Terminal Final Environmental Impact Statement and Section 4(f) Evaluation. Port Authority of New York and New Jersey. May 2005. Retrieved November 19, 2008.
  37. Pérez-Peña, Richard (November 3, 2001). "State Plans Rebuilding Agency, Perhaps Led by Giuliani". The New York Times. Retrieved November 19, 2008.
  38. Lower Manhattan Development Corporation. "Selected Design for the WTC Site as of February 2003". Retrieved November 19, 2008.
  39. Collins, Glenn and David W. Dunlap (January 15, 2004). "Unveiling of Memorial Reveals a Wealth of New Details". The New York Times. Archived from the original on May 11, 2011. Retrieved November 19, 2008.
  40. Pérez-Peña, Richard (November 3, 2001). "A NATION CHALLENGED: DOWNTOWN; State Plans Rebuilding Agency, Perhaps Led by Giuliani". The New York Times. Retrieved July 31, 2010.
  41. "A Corporation to Rebuild Ground Zero". The New York Times. November 4, 2001. Retrieved July 31, 2010.
  42. "Governor and Mayor Name Lower Manhattan Redevelopment Corporation" (Press release). RenewNYC.org. November 29, 2001. Retrieved June 16, 2008.
  43. "Lower Manhattan Development Corporation Announces Principles for Development and Blueprint for Renewal for World Trade Center Site" (Press release). RenewNYC.org. April 9, 2002. Retrieved June 16, 2008.
  44. McGuigan, Cathleen (November 12, 2001). "Up From The Ashes". Newsweek.
  45. Wyatt, Edward (January 11, 2002). "Everyone Weighs In With Rebuilding Ideas". The New York Times. Retrieved July 31, 2010.
  46. Muschamp, Herbert (May 23, 2002). "An Appraisal; Marginal Role for Architecture at Ground Zero". The New York Times. Retrieved July 31, 2010.
  47. "Port Authority and Lower Manhattan Developent [sic] Corporation Unveil Six Concepts Plans for World Trade Center Site, Adjacent Areas and Related Transportation" (Press release). RenewNYC.org. July 16, 2002. Retrieved June 16, 2008.
  48. "Lower Manhattan Development Corporation and New York New Visions Announce Panel to Help Select Teams to Participate in Design Study of World Trade Center Site and Surrounding Areas" (Press release). RenewNYC.org. September 17, 2002. Retrieved June 16, 2008.
  49. "Lower Manhattan Development Corporation Announces Design Study for World Trade Center Site and Surrounding Areas" (Press release). RenewNYC.org. August 14, 2002. Retrieved August 7, 2008.
  50. Iovine, Julie (February 26, 2003). "Turning a Competition Into a Public Campaign; Finalist for Ground Zero Design Pull Out the Stops". The New York Times. Retrieved July 31, 2010.
  51. "Lower Manhattan Development Corporation Announces Six Teams of Architects and Planners to Participate in Design Study of World Trade Center Site" (Press release). RenewNYC.org. September 26, 2002. Retrieved June 16, 2008.
  52. McGeveran, Tom (February 9, 2003). "Beauty Contest: Two Firms Vie At W.T.C. Site". The New York Observer. Retrieved July 31, 2010.
  53. 1 2 Libeskind, Daniel (2004). Breaking Ground. New York: Riverhead Books. pp. 164, 166, 181, 183. ISBN 1-57322-292-5.
  54. "Lower Manhattan Development Corporation". renewnyc.com.
  55. "Silverstein's Army -- World Trade Center". wtc.com.
  56. "Error". americanlawyer-digital.com.
  57. Raab, Scott (May 24, 2007). "Construction of World Trade Center". Esquire.
  58. "The Twin Towers Alliance". Retrieved October 4, 2014.
  59. Handwerker, Haim (November 20, 2007). "The politics of remembering Ground Zero – Haaretz – Israel News". Haaretz.
  60. "Windows on the World, New York's Sky-High Restaurant - Eater NY". Retrieved October 4, 2014.
  61. "PHOTOS: The Stunning Views Atop One World Trade Center". The Huffington Post. April 2, 2013.
  62. "Windows on the World September 11 - A 9/11 Story About Wine and Wisdom". Esquire. Retrieved October 4, 2014.
  63. "Owner vows to reopen Windows On The World". Crain's New York Business. September 17, 2001. Retrieved October 4, 2014.
  64. "WTC Scraps Windows on the World Plan". Gothamist. March 8, 2011.
  65. "Developer: Ground Zero a National Disgrace - 60 Minutes: Eight Years and Billions of Dollars Later, Part of 9/11 Site is Still Just a Big Hole". CBS News. February 18, 2010. p. 1.
  66. "Trump pushes own Ground Zero plan". CNN. May 19, 2005.
  67. Zraick, Karen (May 12, 2011). "World Trade Center Update: Prismatic Glass Facade For WTC Tower Scrapped". The Huffington Post. Archived from the original on May 14, 2011. Retrieved July 4, 2016.
  68. "Freedom Tower Name Change Slammed as Unpatriotic". Fox News Channel. Associated Press. March 28, 2009.
  69. Cuthbertson, Charlotte (April 2, 2009). "Freedom Tower Renaming Draws Criticism". The Epoch Times. Retrieved October 31, 2010.
  70. Katersky, Aaron (March 13, 2006). "Construction on Ground Zero Memorial Ignites Protests". ABC News. Retrieved November 19, 2008.
  71. Dunlap, David W. (April 28, 2006). "Freedom Tower Construction Starts After the Beginning". The New York Times. Retrieved November 19, 2008.
  72. Todorovich, Petra (March 24, 2006). "At the Heart of Ground Zero Renegotiations, a 1,776-Foot Stumbling Block". Spotlight on the Region. Regional Plan Association. 5 (6). Archived from the original on June 5, 2008. Retrieved November 19, 2008.
  73. Westfeldt, Amy (April 28, 2006). "Construction Begins at Ground Zero". Washington Post / AP. Retrieved November 19, 2008.
  74. Pogrebin, Robin (May 3, 2006). "Richard Rogers to Design Tower at Ground Zero". The New York Times. Retrieved November 19, 2008.
  75. Dunlap, David W. (September 7, 2006). "Designs Unveiled for Freedom Tower's Neighbors". The New York Times. Retrieved November 19, 2008.
  76. Bagli, Charles V. (June 14, 2007). "Chase Bank Set to Build Tower by Ground Zero". The New York Times. Retrieved November 19, 2008.
  77. Appelbaum, Alec (July 30, 2007). "Kohn Responds to WTC5 Criticisms". Architectural Record. Retrieved November 19, 2008.
  78. Goldman, Henry (September 7, 2010). "World Trade Center Rebuilding May Finish by 2014, Officials Say ||| World Trade Center". WTC.com. Retrieved September 12, 2011.
  79. Bagli, Charles V. (August 3, 2010). "Condé Nast Signs Deal to Move to Ground Zero Tower". The New York Times.
  80. Shapiro, Julie (February 8, 2011). "Deutsche Bank Demolition Finally Reaches Street Level ||| World Trade Center". WTC.com. Retrieved September 12, 2011.
  81. "World Trade Center deal may hasten rebuilding". Reuters. August 26, 2010.
  82. "3 World Trade Center". wtc.com. Retrieved September 12, 2011.
  83. "Two World Trade Center on Emporis". Retrieved December 30, 2011.
  84. Rubinstein, Dana (October 20, 2010). "Everybody Go Downtown! ||| World Trade Center". WTC.com. Archived from the original on October 1, 2011. Retrieved September 12, 2011.
  85. Simone Foxman (September 13, 2013). "The puzzling non-profit behind the "World Trade Center" name makes a surprising amount of money". Quartz. Retrieved September 14, 2013.
  86. Iain McDonald and Nichola Saminather (December 5, 2013). "Westfield to Buy World Trade Center Retail Stake". Bloomberg Personal Finance. Bloomberg L.P. Retrieved December 15, 2013.
  87. Dunlap, David W. (May 15, 2014). "Passes Are No Longer Needed at 9/11 Memorial". The New York Times. Retrieved May 22, 2014.
  88. Murphy, William (September 5, 2013). "Fencing at WTC coming down, adding accessibility". Newsday. Retrieved September 22, 2013.
  89. 1 2 "The Truth About the World Trade Center". Esquire Magazine. 2013.
  90. 1 2 "Is the World Trade Center Safe?". Esquire Magazine. 2014.
  91. "Freedom Tower". Silverstein Properties. 2008.
  92. Cuza, Bobby (September 2, 2011). "9/11 A Decade Later: One World Trade Center Rises In Lower Manhattan". NY1. Retrieved 2011-09-04.
  93. Brown, Eliot. "One World Trade to Open Nov. 3, But Ceremony is TBD". Wall Street Journal.
  94. 1 2 "The Status of the World Trade Center Complex, 13 Years Later". Curbed. 11 September 2014. Retrieved 2 December 2014.
  95. 1 2 "Joint Statement on World Trade Center Development". Port Authority of New York and New Jersey. 2010-03-25. Retrieved 2010-03-25.
  96. "World Trade Center Complex on Way to Completion". ABC News. Associated Press. 11 September 2014. Archived from the original on 2014-09-12. Retrieved 2 December 2014.
  97. Smith, Greg (September 6, 2014). "Port Authority delays 1 World Trade Center opening as project takes more time, money than expected". New York Daily News.
  98. 1 2 "3 WORLD TRADE CENTER". wtc.com.
  99. 1 2 Geiger, Daniel (2012-10-03). "GroupM Considers Huge Lease to Anchor 3 WTC". Commercial Observer. Retrieved 2013-11-03.
  100. Rich, Schapiro (September 10, 2013). "9/11 anniversary: After 12 years, new WTC taking shape after terror attack". New York Daily News. Retrieved 14 November 2013.
  101. "Hudson Market project finds a home in Chelsea". New York Post. 2014-08-04.
  102. "Tower 4 Schedule". Silverstein Properties. 2008.
  103. Port Authority Approves WTC Construction Plan NY1 local news channel. Retrieved August 26, 2010.
  104. "City Shells Out $32.9M To Lease Space At World Trade Center". NY1. February 25, 2011. Retrieved 2011-02-26.
  105. Cuza, Bobby (April 22, 2011). "9/11 A Decade Later: Tower Four Emerges From The Ground". NY1. Retrieved 2011-04-22.
  106. "NYC's World Trade Tower Opens 40% Empty in Revival". Bloomberg.com. 2013-11-12. Retrieved 2015-10-05.
  107. 29 July 2015. "Silverstein Signs Four More Tenants at 4WTC". Real Estate Weekly. Retrieved 5 October 2015.  via HighBeam (subscription required)
  108. "Tower 5". Silverstein Properties. 2008.
  109. 1 2 Minchom, Clive (2013-11-12). "New World Trade Center Coming To Life Already Impacts New York Skyline". Jewish Business News. Retrieved 2015-10-05.
  110. About 7 WTC Archived September 10, 2015, at the Wayback Machine.
  111. "Tower 7". Silverstein Properties. 2008.
  112. "Memorial & Museum, Schedule". Silverstein Properties. 2008.
  113. Cuza, Bobby (September 5, 2011). "WTC Memorial Ready For Public Unveiling". NY1. Retrieved 2011-09-08.
  114. "The Truth About the World Trade Center". Esquire Magazine. 2011.
  115. 1 2 "Lower Manhattan Community Meeting #205" (pdf). New York City Department of Transportation. June 26, 2014. Retrieved January 7, 2016.
  116. Pogrebin, Robin (2015-07-23). "Ground Zero Arts Center to Shrink Further". The New York Times. Retrieved 2015-10-05.
  117. Gelman, Max (2016-06-29). "New elevated park opens near the WTC 9/11 Memorial". NY Daily News. Retrieved 2016-07-01.
  118. Walker, Ameena (2016-06-29). "See photos of WTC's Liberty Park on its long-awaited opening day". Curbed NY. Retrieved 2016-07-01.
  119. Ralph Gardner Jr. (October 16, 2014). "A Church Near Ground Zero Reimagined". WSJ.
  120. "Freedom Tower: About the Building". Silverstein Properties. Retrieved January 21, 2008.
  121. Lerner, Kevin (August 2003). "Libeskind and Silverstein reach an agreement for WTC site". Architectural Record.
  122. "Port Authority Scraps Plans For One World Trade Center Restaurant". NY1. March 8, 2011. Archived from the original on March 11, 2011. Retrieved March 8, 2011.
  123. Bagli, Charles V. (May 17, 2011). "Condé Nast Will Be Anchor of 1 World Trade Center". The New York Times. Retrieved May 22, 2011.
  124. Cuza, Bobby (May 25, 2011). "9/11 A Decade Later: Conde Nast To Occupy 1 World Trade Center". NY1. Archived from the original on May 29, 2011. Retrieved May 29, 2011.
  125. "World Trade Center Towers". Lower Manhattan Development Corporation.
  126. NY1 Exclusive: Developer Says WTC Project To Be Complete In Five, Six Years NY1. Retrieved August 17, 2010. Archived August 19, 2010, at the Wayback Machine.
  127. Naanes, Marlene (June 22, 2007). "JP Morgan releases WTC tower plans". AM New York. Archived from the original on December 11, 2007.
  128. Appelbaum, Alec (July 30, 2007). "Kohn Responds to WTC5 Criticisms". Architectural Record. Retrieved July 30, 2010.
  129. Jones, David (2008-03-20). "JPMorgan might flip WTC site". The Real Deal New York. Retrieved 2015-10-05.
  130. "7 World Trade Center Opens with Musical Fanfare". Lower Manhattan Development Corporation (LMDC). May 22, 2006. Archived from the original on August 9, 2007. Retrieved July 27, 2007.
  131. Cuza, Bobby (July 8, 2011). "9/11 A Decade Later: The 9/11 Memorial From All Sides". NY1. Archived from the original on July 11, 2011. Retrieved July 10, 2011.
  132. "Reflecting Absence". Lower Manhattan Development Corporation. 2004.
  133. "The Politics of Remembering Ground Zero". Haaretz.com.
  134. Cuza, Bobby (August 10, 2010). "Media Get Sneak Peek Of 9/11 Museum Site". NY1. Archived from the original on September 21, 2011. Retrieved August 10, 2010.
  135. First Trees Are Planted At September 11th Memorial Site NY1 local news channel. Retrieved August 28, 2010. Archived August 31, 2010, at the Wayback Machine.
  136. WTC Memorial To Display Mementos Of Attack Victims NY1 local news channel. Retrieved October 20, 2010. Archived October 22, 2010, at the Wayback Machine.
  137. Sept. 11th Memorial Plaza Receives Its 50th Oak Tree NY1 local news channel. Made October 26, 2010. Retrieved October 27, 2010. Archived July 14, 2011, at the Wayback Machine.
  138. Visitors To WTC Site Get Vivid Preview Of 9/11 Memorial NY1 local news channel. Retrieved November 23, 2010. Archived March 6, 2012, at the Wayback Machine.
  139. Scotto, Michael (December 22, 2010). ""Survivor Tree" Replanted At WTC Site". NY1. Archived from the original on May 8, 2011. Retrieved December 23, 2010.
  140. "WTC Memorial To Have Limited Access On 10th Anniversary". NY1. February 14, 2011. Archived from the original on May 13, 2011. Retrieved February 14, 2011.
  141. "Port Authority: WTC Memorial Needs Another $3M For Construction". NY1. June 30, 2011. Archived from the original on September 21, 2011. Retrieved July 1, 2011.
  142. "The Lower Manhattan Development Corporation Announces Selection of Architectural Firms to Design the Performing Arts Complex and the Museum Complex on the World Trade Center Site" (Press release). RenewNYC.org. October 12, 2004. Retrieved August 7, 2008.
  143. Spitz, Rebecca (March 9, 2011). "9/11 A Decade Later: Glass Atrium Rises At WTC Memorial Site". NY1. Archived from the original on March 22, 2011. Retrieved March 15, 2011.
  144. Erlanger, Steven (October 15, 2011). "Again in Norway, Events Provide Test for a King's Mettle". The New York Times. Retrieved October 16, 2011.
  145. 1 2 Pogrebin, Robin (March 28, 2007). "Ground Zero Arts Center Loses Theater Company". The New York Times. Retrieved July 31, 2010.
  146. "History". Ground Zero Museum Workshop. 2013. Retrieved December 15, 2013.
  147. Iain McDonald and Nichola Saminather (December 5, 2013). "Westfield to Buy World Trade Center Retail Stake". Bloomberg Personal Finance. Bloomberg L.P. Retrieved December 15, 2013.
  148. Hargrove, Channing. "World Trade Center Stores Finally Set an Opening Date", Racked.com, April 15, 2016. Accessed August 7, 2016. "Plan your summer vacations carefully. Tribeca Citizen is reporting that the first batch from approximately 125 stores coming to Westfield World Trade Center will open on August 16th; no names were named. Eataly will beat them all, though, with a July debut."
  149. "Westfield World Trade Center Mall Opens For Business". newyork.cbslocal.com. August 16, 2016. Retrieved August 16, 2016.
  150. Dunlap, David W. (July 2, 2008). "Design of Ground Zero Transit Hub Is Trimmed". The New York Times. Retrieved July 31, 2010.
  151. Dunlap, David W. (April 6, 2009). "Using the Hudson to Cool the Trade Center". The New York Times. Retrieved July 31, 2010.
  152. "Port Authority Reports Increase In WTC Transit Hub Costs". NY1. February 24, 2011. Archived from the original on July 14, 2011. Retrieved February 26, 2011.
  153. Cuza, Bobby (April 28, 2011). "9/11 A Decade Later: Port Authority Downplays WTC Transit Hub's Rising Costs". NY1. Archived from the original on April 30, 2011. Retrieved April 29, 2011.
  154. David Lee Miller,Kathleen Foster and Judson Berger (August 18, 2010). "Decision Not to Rebuild Church Destroyed on 9/11 Surprises Greek Orthodox Leaders". Fox News Channel. Retrieved August 26, 2010.
  155. "Church Destroyed On 9/11 Files Suit Against Port Authority". NY1. February 14, 2011. Archived from the original on July 14, 2011. Retrieved February 14, 2011.
  156. "Historic Church Destroyed On 9/11 To Rise Again". NY1. October 14, 2011. Archived from the original on May 12, 2013. Retrieved October 15, 2011.
  157. Belinda Lanks (August 15, 2014). "Six Meanings Behind the World Trade Center's New Logo". Bloomberg Businessweek. Retrieved August 24, 2014.
  158. 1 2 3 4 5 6 Wilson, Mark (August 14, 2014). "The World Trade Center Has A New, Very Confusing Logo". Fast Company. Retrieved August 14, 2014.
  159. 1 2 3 4 5 6 7 Dunlap, David (August 13, 2014). "World Trade Center Logo Captures Site's Destruction and Rebirth". The New York Times. Retrieved August 14, 2014.
  160. https://www.panynj.gov/corporate-information/pdf/pa_minutes_9_18_2013.pdf

Bibliography

External links

Wikimedia Commons has media related to World Trade Center (New York City).
This article is issued from Wikipedia - version of the 11/27/2016. The text is available under the Creative Commons Attribution/Share Alike but additional terms may apply for the media files.