List of power stations in Indonesia
The following lists some of the larger power stations in Indonesia. Data are not included for a large number of small isolated plants (mostly diesel) in the Outer Islands. In total, the PLN operated over 5,000 plants across Indonesia in 2010 of which over 4,500 were small diesel plants outside of Java. For further details about existing capacity and operations of the electricity sector, see information about the state-owned Indonesian electricity company Perusahaan Listrik Negara.
Non-renewable
Thermal
Thermal power is the largest source of power in Indonesia.There are different types of thermal power plants based on the fuel used to generate the steam such as coal, gas, diesel etc. About 85% of electricity consumed in Indonesia is generated by thermal power plants.
Bituminous coal or lignite
Existing
Note: IPP means independent power producer
Power station | Operator | Location | District | Province | Sector | Region | Capacity per unit (MW) | Installed capacity (MW) | Notes | Coordinates | Refs |
---|---|---|---|---|---|---|---|---|---|---|---|
Bukit Asam coal-fired | PT. PLN | Tanjung Enim | Muara Enim | South Sumatra | Government | Sumatra | 4 x 65 | 260 | Boiler from Stein, Turbines from Rateau and generators from GEC Alstom | [1] | |
Paiton (PLN) coal-fired | PT. PLN | Paiton | Probolinggo | East Java | Government | Java-Bali | 2 x 400 | 800 | Boiler from ABB Combustion Engineering, Turbines and generators from Toshiba | 7°42′56″S 113°35′06″E / 7.7155°S 113.5849°E | [2] |
Ombilin coal-fired | PT. PLN | Ombilin | Sawahlunto | West Sumatra | Government | Sumatra | 2 x 100 | 200 | Boiler from Stein, Turbines and generators from GEC Alstom | [1] | |
Suralaya coal-fired | PT. Indonesia Power | Suralaya | Cilegon | Banten | Government | Java-Bali | 4 x 400 3 x 600 |
3,400 | Boiler from Babcock & Wilcox Canada, Turbines from MHI Japan; generators from Mitsubishi Electric Co. | ||
Suralaya Baru coal-fired | PT. Indonesia Power | Suralaya | Cilegon | Banten | Government | Java-Bali | 1 x 625 | 625 | Boiler from Shanghai Co. Ltd, Turbines and generators from Shanghai Co. Ltd | 5°53′31″N 106°01′48″E / 5.892°N 106.03°E | [3][4] |
Paiton | PT. Paiton Energy (IPP) | Paiton | Probolinggo | East Java | Private | Java-Bali | 2 x 670, 2 x 610, 1 x 850 | 2,300 | Boiler supplied by ABB, Turbines and Generators supplied by GE | [4] | |
Tanjung Jati-B I coal-fired | PT. Central Java Power (IPP) | Bangsri | Jepara | East Java | Private | Java-Bali | 2 x 662 | 1,320 | Boiler supplied by Babcock & Wilcox, Turbines and Generators supplied by Toshiba | [4] | |
Tanjung Jati-B II coal-fired | PT. Central Java Power (IPP) | Bangsri | Jepara | East Java | Private | Java-Bali | 2 x 662 | 1,320 | Boiler supplied by Mitsubishi Heavy Industry, Turbines and Generators supplied by Toshiba | [4] | |
Cirebon coal-fired | PT. Cirebon Electric Power (IPP) | Kanci Kulon | Cirebon | West Java | Private | Java-Bali | 1 x 660 | 660 | Boiler, Turbines and Generators supplied by Doosan Heavy Industries and Construction Co., Ltd. | 6°46′13″S 108°36′54″E / 6.7704°S 108.6151°E | [4] |
Cilacap | PT. Sumber Segara Primadaya (IPP) | Karangkandri | Cilacap | Central Java | Government | Java-Bali | 2 x 300 | 600 | Boiler supplied by Dongfang Electric Corp. Ltd, Turbines and Generators supplied by Dongfang Electric Corp. Ltd | 07°40′31.20″S 109°05′47.40″E / 7.6753333°S 109.0965000°E | |
Cilacap Adipala coal-fired | PT. Indonesia Power | Adipala | Cilacap | Central Java | Government | Java-Bali | 1 x 660 | 660 | Boiler supplied by Shanghai Electric Corp. Ltd, Turbines and Generators supplied by Shanghai Electric Corp. Ltd | [4] | |
Indramayu coal-fired | PT. PLN | Sumur Adem | Indramayu | West Java | Government | Java-Bali | 3 x 330 | 990 | Boiler supplied by Babcock & Wilcox Beijing Co., Turbines and Generators supplied by Beijing Beizhong | [4] | |
Pacitan coal-fired | PT. PLN | Sukorejo | Pacitan | East Java | Government | Java-Bali | 2 x 315 | 630 | Boiler supplied by Dongfang Electric Corp. Ltd, Turbines and Generators supplied by Dongfang Electric Corp. Ltd | [4] | |
Tarahan coal-fired | PT. PLN | Tarahan | South Lampung | Lampung | Government | Sumatra | 2 x 100 | 200 | Boiler supplied by Jinan Co. Ltd, Turbines and Generators supplied by Wuhan Co. Ltd | ||
Labuan coal-fired | PT. Indonesia Power | Labuan | Pandeglang | Banten | Government | Java-Bali | 2 x 300 | 600 | Boiler supplied by Dongfang Electric Corp. Ltd, Turbines and Generators supplied by Dongfang Electric Corp. Ltd | ||
Labuhan Angin coal-fired | PT. PLN | Labuhan Angin | Central Tapanuli | North Sumatra | Government | Sumatra | 2 x 115 | 230 | Boiler supplied by Foster Wheeler, Turbines and Generators supplied by Shanghai Turbine Co. Ltd. | [5] | |
Lontar coal-fired | PT. Indonesia Power | Lontar, Teluk Naga | Tangerang | Banten | Government | Java-Bali | 3 x 315 | 945 | Boiler supplied by Dongfang Electric Corp. Ltd, Turbines and Generators supplied by Dongfang Electric Corp. Ltd | ||
Pelabuhan Ratu coal-fired | PT. Indonesia Power | Pelabuhan Ratu | Sukabumi | West Java | Government | Java-Bali | 3 x 350 | 1050 | Boiler supplied by Shanghai Electric Corp. Ltd, Turbines and Generators supplied by Shanghai Electric Corp. Ltd | [6] | |
Rembang coal-fired | PT. PLN | Sluke | Rembang | Central Java | Government | Java-Bali | 2 x 315 | 630 | Boiler supplied by Dongfang Electric Corp. Ltd, Turbines and Generators supplied by Dongfang Electric Corp. Ltd | 06°38′18.21″S 111°28′27.41″E / 6.6383917°S 111.4742806°E | [4] |
Bangka Belitung 3 coal-fired | PT. BMP (IPP) | Air Anyir | Bangka | Bangka Belitung | Government | Sumatera | 2 x 30 | 60 | |||
Total | 50 | 18,630 |
Proposed or under construction
Power station | Operator | Location | District | Province | Sector | Region | Capacity per Unit (MW) | Installed Capacity (MW) | Remarks and Plant Coordinates |
---|---|---|---|---|---|---|---|---|---|
Central Java coal-fired (by the end of 2016) | PT. Bhimasena Power Indonesia | Ujungnegoro | Batang | Central Java | Private | Java-Bali | 2 x 1000 | 2,000 | [7] |
Tanjung Awar-Awar coal-fired | PT. PLN | Kaliuntu | Tuban | East Java | Government | Java-Bali | 2 x 350 | 700 | Boiler supplied by Babcock & Wilcox Beijing Co. Turbines and generators supplied by Beijing Beizhong |
Madura coal-fired | PT. PLN | Pamekasan | East Java | Government | Java-Bali | 2 x 100 | 200 | ||
Bojonegara coal-fired | PT. PLN | Bojonegara | Cilegon | Banten | Government | Java-Bali | 3 x 740 | 2,220 | |
Tanjung Jati-A coal-fired | PT. Bakrie Power | Cirebon | Cirebon | West Java | Private | Java-Bali | 2 x 660 | 1,320 | |
Nusa Penida coal-fired | PT. PLN | Nusa Penida | Bali | Government | Java-Bali | 2 x 100 | 200 | ||
Anyer coal-fired | PT. PLN | Anyer | Banten | Government | Java-Bali | 1 x 330 | 330 | ||
Kuala Tanjung coal-fired | PT. Ranyza Energi | Kuala Tanjung | South Sumatra | Private | Sumatra | 2 x 112 | 224 | ||
Banjarsari coal-fired | PT. Bukit Pembangkit Innovative | Banjarsari | Lahat | South Sumatra | Private | Sumatra | 2 x 100 | 200 | |
Banyuasin coal-fired | PT. Banyuasin Power Energy | Banyuasin | Banyuasin | South Sumatra | Private | Sumatra | 2 x 100 | 200 | |
Baturaja coal-fired | PT. Priamanaya Power Energi | Baturaja | Ogan Komering Ulu | South Sumatra | Private | Sumatra | 2 x 100 | 200 | |
Simpang Belimbing coal-fired | PT. GH EMMI | Gunung Raja | Muara Enim | South Sumatra | Private | Sumatra | 2 x 150 | 300 | |
Arahan coal-fired | PT. PLN | Arahan | Muara Enim | South Sumatra | Government | Sumatra | 4 x 600 | 2,400 | |
Central Bangko coal-fired | PT. BA & CHD (China) | Bangko Tengah | Muara Enim | South Sumatra | Private | Sumatra | 4 x 620 | 2,480 | |
Tanjung coal-fired | PT. PLN | Tanjung | Tabalong | South Kalimantan | Government | Kalimantan | 2 x 55 | 110 | |
Total | 34 | 13,084 |
Gas or liquid fuel
Power station | Operator | Location | District | Province | Sector | Region | Capacity per Unit (MW) | Capacity (MW) | Coordinates | Refs |
---|---|---|---|---|---|---|---|---|---|---|
Bekasi | West Java | 130 | ||||||||
Betara | Lampung | 70 | ||||||||
Grati CCGT | PT. Indonesia Power | Grati | Pasuruan | East Java | Government | Java-Bali | 3 x 100.75 GTPP ; 3 x 100.75 SPP ; 1 x 159.58 CCPP | 764 | 7°39′06″S 113°01′28″E / 7.6517°S 113.0244°E | [8][9] |
Gresik CCGT | PT. Pembangkitan Jawa Bali | Gresik | Gresik | East Java | Government | Java-Bali | 4 x GTPP ; 4 x SPP ; 3 x CCPP | 2,255 | 7°09′48″S 112°39′41″E / 7.1633°S 112.6615°E | [10] |
Muara Tawar CCGT | PT. Pembangkitan Jawa Bali | Tarumajaya | Bekasi | West Java | Government | Java-Bali | 2 x GTPP ; 3 x CCPP | 920 | 06°05′09.37″S 106°59′48.15″E / 6.0859361°S 106.9967083°E | |
Muara Karang CCGT | PT. Pembangkitan Jawa Bali | Muara Karang | North Jakarta | DKI Jakarta | Government | Java-Bali | 5 x STPP ; 1 x CCPP | 1,208 | 6°06′31″S 106°47′16″E / 6.1087°S 106.7877°E | [11][12] |
Palembang Timur | South Sumatra | 150 | ||||||||
Samarinda | East Kalimantan | 60 | ||||||||
Sengkang | South Sulawesi | 150 | ||||||||
Tambak Lorok CCGT | PT. Indonesia Power | Tambak Lorok | Semarang | Central Java | Government | Java-Bali | 6 x 109.65 GTPP ; 2 x 50 SPP ; 1 x 200 SPP ; 2 x 188 CCPP | 1,334 | ||
Tanjung Priok CCGT | PT. Indonesia Power | Tanjung Priok | North Jakarta | DKI Jakarta | Government | Java-Bali | 2 x 26 GTPP ; 2 x 48.8 GTPP ; 2 x 50 SPP ; 6 x 130 CCGT ; 2 x 200 CCGT | 1,430 | ||
Senayan Diesel | PT. Indonesia Power | Senayan | Jakarta | DKI Jakarta | Government | Java-Bali | 6 x 2.52 | 15 | -6.2160361, 106.7953257 | |
PLTU 400 MW | PT. Krakatau Daya Listrik | Ciwandan | Cilegon | Banten | SOE | Java-Bali | 5 x 80 STG | 400 MW | ||
PLTGU 120 MW | PT. Krakatau Daya Listrik | Ciwandan | Cilegon | Banten | SOE | Java-Bali | 2 x 39 GTG ; 1 x 43 STG | 120 MW | ||
Total | 68 | 8,446 |
Renewable
Geothermal
Note: IPP means independent power producer
Power station | Operator | Location | District | Province | Sector | Region | Capacity per Unit (MW) | Installed Capacity (MW) | Remarks and Plant Coordinates |
---|---|---|---|---|---|---|---|---|---|
Kamojang geothermal | PT. Indonesia Power | Kamojang | Garut | West Java | Government | Java-Bali | Unit I = 30 Unit II = 55 Unit III = 55 Unit IV = 60 | 200 | Unit IV 63 MW turbine capacity and 80 MVA generator capacity both from Fuji Electric, Kawasaki, Japan [13] |
Darajat geothermal | PT. Indonesia Power | Kamojang | Garut | West Java | Government | Java-Bali | Unit I = 55 | 55 | |
Darajat geothermal | PT. Pertamina, Chevron Geothermal Indonesia, Ltd, (IPP) | Kamojang | Garut | West Java | Private | Java-Bali | Unit II = 90 Unit III = 110 | 200 | Turbines Unit II = 81.3 MW & Unit III = 110 MW and Generators Unit II = 101.625 MVA & Unit III = 137.5 MVA both supplied by Fuji Electric, Kawasaki, Japan [14] |
Gunung Salak geothermal | PT. Indonesia Power | Parung Kuda | Sukabumi | West Java | Government | Java-Bali | 3 x 60 | 180 | Turbines @ 55 MW and Generators @ 55 MVA both supplied by Ansaldo Energia, Italy [15] |
Gunung Salak geothermal | Chevron Geothermal Salak Ltd and Dayabumi Salak Pratama Ltd (IPP) | Parung Kuda | Sukabumi | West Java | Private | Java-Bali | 3 x 55 | 165 | Turbines @ 59.5 MW and Generators @ 74.375 MVA both from Fuji Electric, Kawasaki, Japan |
Ulubelu Geothermal Power Station | PT.PLN | Ulubelu | Tanggamus | Lampung | Government | Sumatra | 2 x 55 | 110 | Turbines 2 x 55 MW and Generators 2 x 55 MVA both from Fuji Electric, Kawasaki, Japan [16] |
Wayang Windu geothermal | PT. Pertamina and Magma Nusantara Ltd. (IPP) | Pengalengan | Bandung | West Java | Private | Java-Bali | 1 x 110 1 x 117 ( 1 x 127 by mid-2013 ) | 227 | Turbines 110 MW & 117 MW and Generators 2 x 137.5 MVA both from Fuji Electric, Kawasaki, Japan [17] |
Dieng geothermal | PT. Geo Dipa Energi (IPP) | Dieng | Banjarnegara | Central Java | Private | Java-Bali | 1 x 60 | 60 | |
Lahendong geothermal | PT. PLN | Lahendong | Minahasa | North Sulawesi | Government | Sulawesi | Unit I = 20 Unit II = 20 Unit III = 20 Unit IV = 20 | 80 | * Unit I: turbines = 20 MW and generator = 25 MVA both from Alstom [18] * Unit II: turbines = 20 MW and generator = 25 MVA both from Fuji Electric, Kawasaki, Japan [19] * Unit III: turbines = 20 MW and generator = 25 MVA both from Fuji Electric, Kawasaki, Japan [20] * Unit IV: turbines = 20 MW and generator = 25 MVA both supplied by Fuji Electric, Kawasaki, Japan [21] |
Sibayak geothermal | PT. Dizamatara Powerindo (IPP) | Sibayak | Karo | North Sumatra | Private | Sumatra | 2 x 5.65 | 11.3 | Turbines @ 5.85 MW and Generators @ 6 MVA, 5.65 MW at PF 0.94 [22] |
Patuha geothermal | PT. Geo Dipa Energi (IPP) | Patuha | Bandung | West Java | Private | Java-Bali | Unit 1 = 55 | 55 (by-mid 2014) | Turbines Unit 1 = 60 MW and Generator Unit 1 = 75 MVA both supplied by Toshiba [23] |
Total | 19 | 1,344 |
Hydroelectric
Note: IPP means independent power producer
Power station | Operator | Location | District | Province | Sector | Region | Capacity per Unit (MW) | Installed Capacity (MW) | Remarks and Plant Coordinates |
---|---|---|---|---|---|---|---|---|---|
Agam hydro | PT. PLN | Batang Agam | Agam | West Sumatra | Government | Sumatra | 3 x 3.5 | 10 | Turbines @ 3.55 MW and Generators @ 3.95 MVA both supplied by Ebara |
Maninjau hydro | PT. PLN | Maninjau | Agam | West Sumatra | Government | Sumatra | 4 x 17 | 68 | Turbines @ 17.4 MW and Generators @ 20 MVA both supplied by Toshiba |
Singkarak hydro | PT. PLN | Singkarak | Solok | West Sumatra | Government | Sumatra | 4 x 43.75 | 175 | Turbines @ 43.75 MW supplied by VoestAlpine and Generators @ 52 MVA supplied by ELIN (now ANDRITZ Hydro) |
Koto Panjang hydro | PT. PLN | Koto Panjang | Kampar | Riau | Government | Sumatra | 3 x 38 | 114 | Turbines @ 39.4 MW supplied by Kvaerner Boving and Generators @ 45 MVA supplied by ELIN (now ANDRITZ Hydro) |
Test I hydro | PT. PLN | Tes | Rejang Lebong | Bengkulu | Government | Sumatra | 4 x 4 | 16 | Turbines @ 4.7 MW supplied by Ansaldo Energia |
Musi hydro | PT. PLN | Ujanmas Atas | Kepahiang | Bengkulu | Government | Sumatra | 3 x 70 | 210 | Turbines @ 70 MW and Generators @ 86 MVA both supplied by VA Tech Hydro (now ANDRITZ Hydro) |
Besai hydro | PT. PLN | Sumberjaya | West Lampung | Lampung | Government | Sumatra | 2 x 45 | 90 | Turbines @ 46.4 MW and Generators @ 53 MVA both supplied by VA Tech Hydro (now ANDRITZ Hydro) |
Batutegi hydro | PT. PLN | Tanggamus | West Lampung | Lampung | Government | Sumatra | 2 x 14 | 28 | Turbines @ 14.2 MW and Generators @ 15.7 MVA both supplied by Toshiba |
Lau Renun hydro | PT. PLN | Silalahi | Dairi | North Sumatra | Government | Sumatra | 2 x 41 | 82 | Turbines @ 41 MW and Generators @ 47.5 MVA both supplied by VA Tech Hydro (now ANDRITZ Hydro) |
Sipansihaporas hydro | PT. PLN | Sipansihaporas | Central Tapanuli | North Sumatra | Government | Sumatra | 1 x 33 1 x 17 | 50 | Power Station 1 = Turbines 34 MW by Meiden, Japan and Generator 39 MVA by Toshiba Power Station 2 = 17.6 MW Meiden, Japan and Generator 20 MVA by Toshiba [24] |
Asahan I hydro | PT. Bajradaya Sentranusa (IPP) | Parmaksian | Toba Samosir | North Sumatra | Private | Sumatra | 2 x 90 | 180 | Turbines and Generators supplied by Dongfang Electric Corp. Ltd |
Asahan III hydro | PT. PLN | Pintu Pohan Meranti | Toba Samosir | North Sumatra | Government | Sumatra | 2 x 87 | 174 | |
Sigura-gura hydro | PT. Inalum | Simorea | Asahan | North Sumatra | Private | Sumatra | 4 x 71.50 | 286 | Turbines @ 71.5 MW and Generators @ 80 MVA both supplied by Hitachi Ltd. |
Tangga hydro | PT. Inalum | Tangga | Asahan | North Sumatra | Private | Sumatra | 4 x 79.25 | 317 | Turbines @ 81.1 MW and Generators @ 90 MVA both supplied by Hitachi Ltd. |
Wampu hydro | PT. Wampu Electric Power (IPP) | Kota Buluh | Karo | North Sumatra | Private | Sumatra | 3 x 15 | 45 | |
Kerinci hydro | PT. PLN | Batang Merangin | Kerinci | Jambi | Government | Sumatra | 6 x 30 | 180 | Turbines @ 30 MW and Generators @ 33.33 MVA [25] |
Saguling hydro | PT. Indonesia Power | Rajamandala | Cimahi | West Java | Government | Java-Bali | 4 x 175.18 | 701 | Turbines @ 175.18 MW supplied by Toshiba and Generators @ 194? MVA supplied by Mitsubishi Electric Co,. |
Cirata hydro | PT. Pembangkitan Jawa Bali | Plered | Purwakarta | West Java | Government | Java-Bali | 8 x 126 | 1,008 | Turbines @ 129.6 MW supplied by VoestAlpine and Generators @ 140 MVA supplied by ELIN (now ANDRITZ Hydro) |
Jatiluhur hydro | PT. Jasa Tirta II | Jatiluhur | Purwakarta | West Java | Government | Java-Bali | 6 x 31 | 186 | Turbines @ 32.3 MW supplied by NEYRPIC and Generators @ 35 MVA supplied by GEC Alsthom Jeumont |
PB. Sudirman hydro | PT. Indonesia Power | Mrica | Banjarnegara | Central Java | Government | Java-Bali | 3 x 60.3 | 181 | Turbines supplied by Boving and Generators supplied by ASEA |
Sutami hydro | PT. Pembangkitan Jawa Bali | Karangkates | Malang | East Java | Government | Java-Bali | 3 x 35 | 105 | |
Wlingi hydro | PT. Pembangkitan Jawa Bali | Wlingi | Malang | East Java | Government | Java-Bali | 2 x 27 | 54 | |
Tonsea Lama hydro | PT. PLN | Tondano | Minahasa | North Sulawesi | Government | Sulawesi | 1 x 4.44 1 x 4.50 1 x 5.44 | 14 | |
Tanggari I & II hydro | PT. PLN | Tondano | Minahasa | North Sulawesi | Government | Sulawesi | 1 x 17.20 1 x 19 | 36 | |
Bakaru I & II hydro | PT. PLN | Bakaru | Pinrang | South Sulawesi | Government | Sulawesi | 2 x 63 1 x 65 | 191 | |
Larona hydro | INCO | Soroako | East Luwu | South Sulawesi | Private | Sulawesi | 3 x 65 | 195 | Turbines @ 67.3 MW supplied by Sulzer & GE and Generators @ 85 MVA supplied by Hitachi & VA Tech Hydro |
Balambano hydro | INCO | Soroako | East Luwu | South Sulawesi | Private | Sulawesi | 2 x 70 | 140 | Turbines @ 68.5 MW and Generators @ 80.6 MVA both supplied by Canadian General Electric |
Karebbe hydro | INCO | Soroako | East Luwu | South Sulawesi | Private | Sulawesi | 2 x 66 | 132 | Turbines @ 63.7 MW and Generators @ 78 MVA both supplied by VA Tech Hydro (now ANDRITZ Hydro) |
Pamona 2 hydro | PT. Poso Energi (IPP) | Pamona Utara | Poso | Central Sulawesi | Private | Sulawesi | 4 x 65 | 260 | Turbines @ 66.66 MW and Generators @ 72.2 MVA [25] |
Riam Kanan hydro | PT. PLN | Aranio | Martapura | South Kalimantan | Government | Kalimantan | 3 x 10 | 30 | Turbines @ 10.5 MW and Generators @ 11 MVA both supplied by Fuji Electric Co,. Ltd, Japan [26] |
Total | 88 | 4,755 |
Pumped-storage hydroelectric
Currently under construction or planned:[27]
Power station | Operator | Location | District | Province | Sector | Region | Capacity per Unit (MW) | Installed Capacity (MW) | Remarks and Plant Coordinates |
---|---|---|---|---|---|---|---|---|---|
Upper Cisokan pumped storage hydro (COD 2015) | PT. PLN | Cianjur Cisokan river and Cirumamis river | Cianjur and Bandung Barat | West Java | Government | Java-Bali | 4 x 260 MW pump turbine or 4 x 275 MVA motor generator | 1,040 MW pump turbine or 1,100 MVA motor generator | |
Matenggeng pumped storage hydro (COD 2020) | PT. PLN | Majenang Cijolang river and Cimancing river | Ciamis | West Java | Government | Java-Bali | 2 x 443 MW pump turbine or 2 x 460 MVA motor generator | 886 MW pump turbine or 920 MVA motor generator | |
Grindulu pumped storage hydro (COD 2021) | PT. PLN | Tegalombo | Pacitan | East Java | Government | Java | 4 x 260 MW pump turbine or 4 x 75 MVA motor generator | 1,040 MW pump turbine or 1,100 MVA motor generator | [28] |
Kali Konto pumped storage hydro (COD 2027) | PT. PLN | Bandar Kedungmulyo | Jombang | East Java | Government | Java-Bali | 4 x 260 MW pump turbine or 4 x 275 MVA motor generator | 1,040 MW pump turbine or 1,100 MVA motor generator | |
Lake Toba pumped storage hydro (COD 2020) | PT. PLN | Toba | Toba Samosir | North Sumatera | Government | Sumatera | 4 x 110 MW pump turbine or 4 x 125 MVA motor generator | 4900 MW pump turbine or 500 MVA motor generator | |
Total | 18 Units | 1364 MW pump turbine or 4,720 MVA motor generator |
See also
- Energy policy in Indonesia
- Electricity in Indonesia
- List of largest power stations in the world
References
- Large Scale Hydropower Plants in Indonesia by Indonesia Hydro Consult (http://www.arcgis.com/apps/OnePane/basicviewer/index.html?appid=65ed8bc862bd4af09c375d49f9d389d4)
- Small Scale Hydropower Plants in Indonesia by Indonesia Hydro Consult (http://www.arcgis.com/apps/OnePane/basicviewer/index.html?appid=2dffb753a63142b0bf7075389414daae)
- 1 2 "Coal-Fired Power Plants in Indonesia - other islands". Gallery. Power Plants Around The World. 25 January 2014. Retrieved 9 March 2014.
- ↑ "http://globalenergyobservatory.org/form.php?pid=41520". Global Energy Observatory. Retrieved 9 March 2014. External link in
|title=
(help) - ↑ "Suralaya Coal Power Plant". Global Energy Observatory. Retrieved 9 March 2014.
- 1 2 3 4 5 6 7 8 9 "Coal-Fired Power Plants in Indonesia - Java". Gallery. Power Plants Around The World. 25 January 2014. Retrieved 9 March 2014.
- ↑ Introduction to Indonesia Labuhan Angin 2X115MW CFB Power Plant Project
- ↑ Shanghai Electric Suppliers of power plant equipment in Indonesia
- ↑ Consortium J-Power, Ithocu and Adaro is the bid winner of PLTU Central Java 2x1000 MW
- ↑ "CCGT Plants in Indonesia". Gallery. Power Plants Around The World. 17 October 2012. Retrieved 9 March 2014.
- ↑ "Grati CCGT Power Plant". Global Energy Observatory. Retrieved 9 March 2014.
- ↑ "Gresik CCGT Power Plant". Global Energy Observatory. Retrieved 9 March 2014.
- ↑ "Muara Karang CCGT Power Plant". Global Energy Observatory. Retrieved 9 June 2014.
- ↑ "Muara Karang Gas Power Plant Project" (PDF). Project Fact Sheet. Tebeton. Retrieved 9 June 2014.
- ↑ The geothermal steam turbine generator is produced by Fuji Japan Ltd
- ↑ Yokogawa Receives Control System Order for Geothermal Power Plant from Fuji Electric Systems
- ↑
- ↑
- ↑
- ↑ Lahendong (Indonesia) 20 MW geothermal power plant
- ↑ Lahendong II-20 MW Geothermal Project
- ↑ Yokogawa has won an order from Fuji Electric Systems to supply a CENTUM CS 3000 distributed control system for the Lahendong III
- ↑ Table 1 Recent geothermal power generation projects
- ↑ PT Dizamatara Powerindo (DP) propose to set up a geothermal power project in the North Sumatera
- ↑ Marubeni and Toshiba Win FTK Order for Indonesia's Patuha Unit 1 Geothermal Power Plant
- ↑ Sipansihaporas hydro (E/S) - JICA
- 1 2
- ↑ The description on Riam Kanan Hydro Electric Project in Kalimantan (Indonesia)
- ↑ Rencana Usaha Penyediaan Tenaga Listrik PT. PLN (Persero)2011 - 2020
- ↑ "Acceleration and Expansion of Indonesian Economic Development 2011-2025" (PDF). Master Plan. Retrieved 22 January 2012.